Western Freeway (Mumbai)

Western Freeway
Route information
Length: 29 km (18 mi)
Major junctions
From: Marine Drive
To: Kandivli
Location
States: Maharashtra
Major cities: Mumbai
Highway system

The Western Freeway is a transportation infrastructure project in Mumbai, India that envisions the construction of multiple bridges over the Arabian Sea to reduce traffic-congestion between the Western Suburbs and the island city. The freeway will stretch from Marine Drive in South Mumbai to Kandivli in the north, a distance of 29 km.

The first phase of the project, known as the Bandra-Worli Sea Link, was completed in June 2009, and links Bandra in the north and Worli in the south with a cable stayed bridge spanning the Mahim Bay. This development has relieved the congestion on the Mahim Causeway, which until then had been the only road between the Western Suburbs and South Mumbai on the western sea front. The fate of next segments is unclear. An alternative to the Western Freeway is the Coastal Freeway, a proposed 35.6 km road from Manora MLA Hostel at Nariman Point to Kandivali

Haji Ali-Nariman Point Sea Link

This section would have been an extension of the sea-link from Haji Ali to Priyadarshini Park, and onward to Malabar Hill. The section was sub-divided into the following:

On 16 April 2013, Chief Minister Prithviraj Chavan told the state Assembly that the Nariman Point–Haji Ali sea link was "impractical". Chavan stated, "As far as the sea link is concerned, the consultant had ruled out the possibility of taking it further than Haji Ali. We will look at other alternatives."[2] Chavan also said that he would promote a coastal road as an alternative to the sea link.[3][4]

Worli–Haji Ali Section

This section is the immediate extension of the Bandra-Worli Sea Link further into the heart of Mumbai city. The current design allows for a clover leaf junction at Khan Abdul Ghaffar Khan Marg (at Worli) for ramp up of traffic onto the sea link. This includes twin carriageway of 3.315 km termed as main line and connectors at Worli and Haji Ali. While mainline is to be made of entirely precast segmental spans, the connectors will be made of segmental and I beams. A 10-lane toll plaza is proposed at the start of the section at Worli.

Bandra–Worli Sea Link

The Bandra-Worli Sea Link

The Bandra-Worli Sea Link was opened to traffic on 30 June 2009. The Sea Link reduces travel time between Bandra and Worli from 45–60 minutes to 7 minutes. The link has an average daily traffic of around 37,500 vehicles per day. The toll charged is 55 (81¢ US) for one-way and 82.50 (US$1.20) for a return journey.

There are plans to add an 800 m bridge to turn the Worli connector from a 4-lane to 8-lane freeway.

Bandra–Versova Sea Link

The Bandra-Versova Sea Link (BVSL) is a proposed 9.89-km long sealink that connects Bandra with Versova. It is a northward extension of the Bandra-Worli Sea Link. The BVSL will be built on pillars 900 metres into the Arabian Sea.[5] Juhu beach will have a 150 metre-long cable-stayed portion.[6] The freeway should reduce congestion on the Western Express Highway and the Western Line of the Mumbai Suburban Railway.[6] The 8-lane sea link will pass through Bandra, Juhu Koliwada, Versova and Carter Road.[7]

The project will be developed through public private partnership on a design, build, finance, operate and transfer basis,[8] The cost of the project was originally estimated as 4045 crore (US$600 million) in 2012. This escalated to 4340 crore (US$640 million) in 2013, it is currently estimated to cost 5975 crore (US$880 million).[9] The project is expected to be completed five years from its commencement.[7]

The Bandra–Versova Sea Link received environmental clearance, under certain conditions, from the Ministry of Environment and Forests (MoEF) in January 2013.[5]

A cabinet sub-committee on infrastructure chaired by Chief Minister Prithviraj Chavan cleared the project on 15 January 2014.[10] Some observers felt that the move was an attempt to keep Nationalist Congress Party (NCP) happy prior to the 2014 Lok Sabha elections, as this project and the Pune Ring Road project which was also approved the sub-committee, would be undertaken by the MSRDC, which was then headed by the NCP.[5][11] The project had been pending for approval for the past three years.[12] The fate of the sealink had been uncertain after Chavan said that coastal roads were less expensive to build. Chavan stated that he also favoured coastal roads because they had less environmental hurdles than a sealink. BMC officials stated that the government had not clarified the future of the coastal road project, after approving the BVSL.[13]

The MSRDC invited request for qualification (RFQ) from companies interested in constructing the BVSL on 2 March 2014. The agency conducted a pre-bid conference for potential bidders on 28 March. The last date for the submission of technical bids was fixed as 30 May, and the MSRDC plans to open technical bids on 31 May, as per the tender notice. The MSRDC estimated that the project concession period to be 35 years in the absence of any viability gap funding (the state's financial contribution in a PPP project). However, after some members of the infrastructure sub-committee expressed reservations about the long concession period, the corporation decided to seek 20% from the Union government, which the MSRDC estimates will reduce the concession period to about 28–30 years.[14]

History

In its report, submitted in January 2012, the Joint Technical Committee advised the government to build a 35.6 km coastal freeway from Manora MLA Hostel at Nariman Point to Kandivali. The project is estimated to cost 10,000 crore.[15]

Coastal Regulation Zone (CRZ) norms in India disallow reclamation of land. Construction of the coastal freeway would require a relaxation of the CRZ norms, as certain sections are proposed on reclaimed land.[16] The change in norms can only be done through an amendment to the law by the Central Government. During a meeting between Prithviraj Chavan and Union environment minister Jayanthi Natarajan on 20 June 2013, Natarajan expressed concerns about the implications of relaxing CRZ norms, on creeks and mangroves. However, the minister stated that she would "put the state's proposal at the next meeting [24 June 2013] of the National Coastal Zone Management Authority".[17] However, despite specific assurance from the minister, the National Coastal Zone Management Authority (NCZMA) decided not to include the coastal road plan in their next meeting's agenda.[16]

Coastal Freeway

The Coastal Freeway is a proposed alternative to the Western Freeway. The proposed 35.6 km road will begin near Manora (MLA Hostel), with entry and exit points at Jagannath Bhosale Marg, and will move along Marine Drive and lead into a tunnel that will go under Malabar Hill and exit on the other side of Priyadarshini Park. This stretch is proposed to be built on reclaimed portions up to Haji Ali, and then to Lala Lajpatrai Road in Worli. The coastal freeway will then be connected to the Worli arm of the Bandra-Worli Sea Link by a bridge. On the Bandra side, the coastal road skirting the fort will connect the coastal freeway up to Chimbai village, where a bridge is proposed. A road by reclamation of mangroves, further north, or a road on stilts, and an elevated road between Oshiwara and Malad is also proposed. The coastal freeway will have 18 entry and exit points along its route.[18] The project is estimated to cost 8,000-10,000 crore, and take 5 years to complete.[19]

History

In 2011, Chief Minister Prithviraj Chavan asked the MSRDC to think of building coastal roads instead of capital intensive sea links. He appointed a Joint Technical Committee, comprising experts and officials, in 2012 under the then Municipal commissioner Subodh Kumar to study the plan to build a coastal road. In its report, submitted in January 2012, the committee advised the government to build a 35.6 km coastal freeway from Manora MLA Hostel at Nariman Point to Kandivali to ease traffic congestion. The project is estimated to cost 10,000 crore and would consist of roads built on reclaimed land as well as stilts, bridges and tunnels. The committee was against building any more sea links and pointed out that the coastal road would help save 120 billion of public money.[20] Critics of the freeway are against it due to the reclamation required and they have also cited possible environmental degradation along the coast.[17][21]

Coastal Regulation Zone (CRZ) norms in India disallow reclamation of land. Construction of the coastal freeway would require a relaxation of the CRZ norms, as certain sections are proposed on reclaimed land.[16] The change in norms can only be done through an amendment to the law by the Central Government. After discussing the project on 10 April 2013, the Maharashtra coastal zone management authority (MCZMA), the state's apex environment body, urged the Centre to amend the CRZ notification to permit "reclamation for roads". The MCZMA stated that reclamation should not be permitted for any other development activity and that the high tide line must not be altered. The MCZMA also argued that the ring road would serve as a protection wall from inland flooding, besides being a vital road link for decongesting traffic.[18] During a meeting between Prithviraj Chavan and Union environment minister Jayanthi Natarajan on 20 June 2013, Natarajan expressed concerns about the implications of relaxing CRZ norms, on creeks and mangroves. However, the minister stated that she would "put the state's proposal at the next meeting [24 June 2013] of the National Coastal Zone Management Authority".[17] However, despite specific assurance from the minister, the National Coastal Zone Management Authority (NCZMA) decided not to include the coastal road plan in their next meeting's agenda.[16]

During the 2014 assembly elections, the BJP promised to implement the project if elected. On 6 June 2015, the State Government signed an MoU with the Dutch Government for technical co-operation in implementing the project. The Netherlands is known for its environment-friendly reclamation and the use of the sea. On 8 June 2015, the coastal road project received clearance from the Union Ministry of Environment and Forests.[22][23]

References

  1. "Civic body to amend budget for ambitious coastal freeway plan". Hindustan Times. 23 March 2012.
  2. "Nariman Pt sea link, BRTS projects scrapped". The Times of India. TNN. 17 April 2013. Retrieved 26 June 2013.
  3. "Worli-Haji Ali sea link stuck in cabinet sub-committee". The Indian Express. 18 April 2013. Retrieved 26 June 2013.
  4. "Haji Ali-Nariman Point sealink impractical: CM". Dnaindia.com. 17 April 2013. Retrieved 26 June 2013.
  5. 1 2 3 Eye on polls, Prithviraj Chavan clears two mega projects | Latest News & Updates at DNAIndia.com
  6. 1 2 Bandra-Worli sea link may extend to Versova - The Times of India
  7. 1 2 City roundup - Free Press Journal
  8. http://www.business-standard.com/article/economy-policy/maharashtra-invites-bids-for-versova-bandra-sea-link-project-114030200388_1.html
  9. http://www.dnaindia.com/mumbai/report-global-bids-floated-for-versova-bandra-sea-link-by-msrdc-1966295
  10. After a year’s wait, Bandra-Versova sea link project back on table | The Indian Express
  11. A bridge that widens the gap | Latest News & Updates at DNAIndia.com
  12. Bandra-Versova sea link project gets Cabinet nod
  13. Mumbai: Go-ahead to sea link extension makes coastal road plan hazy | Latest News & Updates at DNAIndia.com
  14. http://indianexpress.com/article/cities/mumbai/msrdc-invites-pre-qualification-bids-for-bandra-versova-sea-link/
  15. "CM roots for coastal road, says sea links impractical". The Indian Express. 17 April 2013. Retrieved 26 June 2013.
  16. 1 2 3 4 Sandeep Ashar (26 June 2013). "Mumbai coastal road plan not on Centre's 'agenda' yet". The Times of India. TNN. Retrieved 26 June 2013.
  17. 1 2 3 "Hunt resumes for consultant for Rs 8,000-cr western freeway". The Times of India. 21 April 2013. Retrieved 26 June 2013.
  18. 1 2 "Coastal road inches closer to reality". The Indian Express. 14 June 2013. Retrieved 26 June 2013.
  19. http://www.mid-day.com/articles/mumbai-coastal-road-from-kandivli-to-nariman-point-gets-the-thumbs-up/16275152
  20. "CM roots for coastal road, says sea links impractical". The Indian Express. 17 April 2013. Retrieved 26 June 2013.
  21. "Even Uttarakhand tragedy will not stop reckless development". Dnaindia.com. 8 April 2013. Retrieved 26 June 2013.
  22. http://www.mid-day.com/articles/mumbai-coastal-road-from-kandivli-to-nariman-point-gets-the-thumbs-up/16275152
  23. http://www.siliconindia.com/news/business/Netherlands-To-Offer-Help-For-Mumbai-Metro-Coastal-Road-nid-183500-cid-3.html

External links

This article is issued from Wikipedia - version of the Tuesday, June 16, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.