Visakhapatnam–Vijayawada section

Visakhapatnam–Vijayawada section

Ratnachal Express is one of the fastest and Prestigious trains on Visakhapatnam–Vijayawada section
Overview
Status Operational
Locale Andhra Pradesh
Termini Visakhapatnam
Vijayawada
Operation
Opened 1897
Owner Indian Railway
Operator(s) South Central Railway
Technical
Track length 350 km (217 mi)
No. of tracks 2
Track gauge 1,676 mm (5 ft 6 in) Broad gauge
Operating speed up to 130 km/h (81 mph)

The Visakhapatnam–Vijayawada section (also known as Visakhaptnam-Vijayawada line) is a railway line connecting Visakhapatnam and Vijayawada both in the Indian state of Andhra Pradesh. The main line is part of the Howrah-Chennai main line. The track from Visakhapatnam to Thadi is under the administrative jurisdiction of East Coast Railway, and the rest of the line from Anakapalle to Vijayawada is under the administrative jurisdiction of South Central Railway.

Visakhapatnam Port at the mouth of the Meghadrigedda was opened in 1933. It was initially developed by Bengal Nagpur Railway.

History

Some years before passenger railways started functioning in India railway lines were laid for carrying construction materials. Amongst these were a line used for construction of the Solani aqueduct over the Ganges Canal near Roorkee in the 1830s, the Red Hill Railroad in 1837 used for construction of a canal near Chennai, and the Godavari Dam Construction Railway used for transporting materials for the construction of the Dowlaisweram Anicut at Rajahmundry around 1845. The project was completed in 1852 and the railway was closed down.[1]

The Red Hill Railroad near Chennai, used in 1837 for transporting granite, is considered by many as the first operational railway in India. Madras Railway was incorporated in 1853 the Great Southern Railway of India was formed in 1858.[2] The Great Southern Railway of India was merged with the Carnatic Railway in 1872 and renamed South Indian Railways in 1874. The main eastward route of Southern Mahratta Railway connected with other routes till Vijayawada (then known as Bezwada) in 1888. The mainline of Nizam's Guaranteed State Railway was extended to Vijayawada in 1889.[3]

During the period 1893 to 1896, 1,287 km (800 mi) of the East Coast State Railway, from Vijayawada to Cuttack was built and opened to traffic.[4][5] The construction of the Old Godavari Bridge in 1897[3][6] and construction of the Vijayawada-Madras link in 1899 enabled the through running of trains.[3]

The southern part of the East Coast State Railway (from Waltair to Vijayawada) was taken over by Madras Railway in 1901.[7]

Railway reorganization

In the early 1950s legislation was passed authorizing the central government to take over independent railway systems that were there. On 14 April 1951 the Madras and Southern Mahratta Railway, the South Indian Railway Company and Mysore State Railway were merged to form Southern Railway. Subsequently, Nizam's Guaranteed State Railway was also merged into Southern Railway. On 2 October 1966, the Secunderabad, Solapur, Hubli and Vijayawada Divisions, covering the former territories of Nizam’s Guaranteed State Railway and certain portions of Madras and Southern Mahratta Railway were separated from Southern Railway to form the South Central Railway . In 1977, Guntakal division of Southern Railway was transferred to South Central Railway and the Solapur division transferred to Central Railway. Amongst the seven new zones created in 2010 was South Western Railway, which was carved out of Southern Railway.[8]

Electrification

Howrah-Chennai Mail was the first train in South Eastern Railway to be hauled by a diesel engine (WDM-1) in 1965.[9]

Speed limits

The entire Kharagpur-Visakhapatnam-Vijayawada main line is classified as a "Group B" line which can take speeds up to 130 km/h. On the branch lines the speed limit is 100 km/hr.[10]

Passenger movement

Visakhapatnam, Rajahmundry and Vijayawada, on this line, are amongst the top hundred booking stations of Indian Railway.[11]

References

  1. Darvill, Simon. "India’s first railways". Godavari Dam Construction Railway. IRFCA. Retrieved 2013-01-19.
  2. "IR History – Early days". 1832-1869. IRFCA. Retrieved 2013-01-19.
  3. 1 2 3 "IR History:Early days II". 1870-1899. IRFCA. Retrieved 2013-01-19.
  4. "Major Events in the Formation of S.E. Railway". South Eastern Railway. Retrieved 2013-01-02.
  5. "History of Waltair Division". Mannanna.com. Retrieved 2013-01-02.
  6. Address Resolution Protocol  Earthling . "Godavari River". En.academic.ru. Retrieved 2012-07-30.
  7. "IR History: Part III (1900-1947)". IRFCA. Retrieved 2013-01-19.
  8. "Geography – Railway Zones". IRFCA. Retrieved 2013-01-23.
  9. "IR History: Part - IV (1947 - 1970)". IRFCA. Retrieved 2012-11-21.
  10. "Chapter II – The Maintenance of Permanent Way". Retrieved 2013-01-02.
  11. "Indian Railways Passenger Reservation Enquiry". Availability in trains for Top 100 Booking Stations of Indian Railways. IRFCA. Retrieved 2012-12-30.

External links

This article is issued from Wikipedia - version of the Friday, January 22, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.