USS Sand Lance (SSN-660)

For other ships of the same name, see USS Sand Lance.
USS Sand Lance (SSN-660) in Charleston Harbor off Charleston, South Carolina, with Fort Sumter in the background.
History
Name: USS Sand Lance (SSN-660)
Namesake: The sand lance
Ordered: 24 October 1963
Builder: Portsmouth Naval Shipyard, Kittery, Maine
Laid down: 15 January 1965
Launched: 11 November 1969
Sponsored by: Mrs. Thomas J. McIntyre
Commissioned: 25 September 1971
Decommissioned: 7 August 1998
Struck: 7 August 1998
Honours and
awards:
Awarded Navy Unit Commendation and Navy Expeditionary Medal in 1979 for Special Operations conducted that same year.
Fate: Scrapping via Ship and Submarine Recycling Program begun 1 April 1998, completed 30 August 1999
Badge:
General characteristics
Class & type: Sturgeon-class attack submarine
Displacement:
  • 4,031 long tons (4,096 t) light
  • 4,323 long tons (4,392 t) full
  • 292 long tons (297 t) dead
Length: 292 ft (89 m)
Beam: 31 ft (9.4 m)
Draft: 29 ft 10 in (9.09 m)
Installed power: 15,000 shaft horsepower (11.2 megawatts)
Propulsion: One S5W nuclear reactor, two steam turbines, one screw
Test depth: 1,300 ft (400 m)
Complement: 107 (12 officers, 95 enlisted men)
Armament: 4 × 21-inch (533 mm) torpedo tubes

USS Sand Lance (SSN-660), a Sturgeon-class attack submarine, was the second ship and the second submarine of the United States Navy to be named for the sand lance, a member of the ammodytidae family.

Construction and commissioning

Sand Lance under construction at Portsmouth Naval Shipyard at Kittery, Maine, with temporary safety railings rigged around her deck. The external fairing on the lower hull was temporary, designed to provide added buoyancy for her bow and avoid excessive strain on her hull during her launching.

The contract to build Sand Lance was awarded to Portsmouth Naval Shipyard at Kittery, Maine, on 24 October 1963 and her keel was laid down there on 15 January 1965. She was launched on 11 November 1969, sponsored by Mrs. Thomas J. McIntyre, and commissioned on 25 September 1971 with Commander William A. Kennington in command. Sand Lance was the last ship to be constructed for the Navy at Portsmouth Naval Shipyard.

Service history

On the day of her commissioning, Sand Lance's home port was changed from Portsmouth, New Hampshire, to Charleston, South Carolina. She spent the remainder of 1971 on shakedown. She operated in the Charleston area for the whole of 1972, then, in February 1973, stood out of Charleston for special operations. She returned to Charleston on 21 April 1973, remained in port until 11 June 1973, and then departed again on special operations. She completed these operations in August 1973 and put in at Faslane Naval Base, Scotland, on 13 August 1973. Sand Lance left Faslane on 20 August 1973 and arrived in Charleston on 5 September 1973. Sand Lance was sent to the Mediterranean to monitor shipping going through the Straits of Gibraltar during the October 1973 War (known in Israel as the Yom Kippur War). She then operated out of Charleston in the western Atlantic Ocean and Caribbean Sea through at least June 1974. She went through overhaul at the Norfolk Naval Shipyard in 1975 and 1976 (15 months).

In 1994 Sand Lance, while moored at Charleston, almost sank next to the pier ahead of one of her sister ships, the attack submarine USS Grayling (SSN-646), due to flooding in the engine room's lower level when a main seawater hull valve was being removed for maintenance. Plates, called blanks, had been placed over her hull penetrations by divers to avoid flooding during removal of the valve but had been placed over the wrong main seawater openings. The flooding was stopped, but not before most of the engine room's lower level was flooded.

In 1995, the Sand Lance left Charleston and relocated to a new homeport in Groton, Connecticut, where she became a member of Submarine Squadron 2.

In 1996, the Sand Lance was sent on a patrol to the Arctic Circle. While there, the submarine surfaced through the polar ice cap at the North Pole on 12 July.

Decommissioning and disposal

Sand Lance was decommissioned on 7 August 1998 and stricken from the Naval Vessel Register the same day. Her scrapping via the Nuclear-Powered Ship and Submarine Recycling Program at Puget Sound Naval Shipyard in Bremerton, Washington, began on 1 April 1998 and was completed on 30 August 1999.

References

This article is issued from Wikipedia - version of the Saturday, January 30, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.