USS DuPage (APB-51)
History | |
---|---|
United States | |
Name: | USS DuPage |
Builder: | Oregon Shipbuilding Co. |
Laid down: | 9 December 1942, as SS John W. Weeks |
Launched: | 2 January 1943 |
Commissioned: | 1951 (U.S. Navy) |
Decommissioned: | 1959 |
Fate: | scrapped in 1959 |
General characteristics | |
Type: | EC2-S-C1 |
Displacement: | 4,023 t. Long tons 11,565 t.full load |
Length: | 441 ft 6 in (134.57 m) |
Beam: | 56 ft 11 in (17.35 m) |
Draft: | 28 ft 4 in (8.64 m) |
Propulsion: | reciprocating steam engine, single shaft, 1,950shp |
Speed: | 12 knots |
Complement: | 151 |
Armament: | None |
Notes: | Troop Accommodations for up to 990 |
For other ships of the same name, see USS DuPage.
USS DuPage , a self propelled barracks ship was laid down on December 9, 1942 as S.S. John W. Weeks, and launched on January 2, 1943. It was delivered to the War Shipping Administration for operation under contract to the U.S. Army Transportation Service. During 1951 the ship was acquired by the U.S. Navy and placed in service as the USS DuPage (APB – 51). Later it was placed out of service (date unknown) and returned to the Maritime Administration for disposal. The ship was scrapped during 1959.
Awards
- National Defense Service Medal
References
- This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.
- NavSource, APB-51
This article is issued from Wikipedia - version of the Thursday, October 29, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.