Tabriz Metro
Overview | |||
---|---|---|---|
Native name |
Tabriz Urban and Suburban Railway قطار شهری تبریز و حومه | ||
Owner | Tabriz Municipality | ||
Locale | Tabriz | ||
Transit type | Rapid transit | ||
Website | Urban Railway Organization | ||
Operation | |||
Began operation | August 27, 2015 | ||
Operator(s) | Tabriz Urban and Suburban Railway Organization | ||
Technical | |||
System length | Line 1 phase 1: 7 km | ||
Track gauge |
1,435 mm (4 ft 8 1⁄2 in) (standard gauge) | ||
|
Tabriz Metro is a metro system serving the city of Tabriz, Iran. The first line opened on 28 August 2015 with 7 km length and 6 stations.[1] There is also one regional commuter line planned to Sahand
Lines
Line 1
Line 1 of Tabriz metro is currently under construction. Its first phase opened on 27 August 2015.The 7 km route runs northwest from El Goli to Ostad Shahryar with four intermediate stations, including three in a tunnel excavated using TBMs.Services are operated with coupled pairs of five-car trainsets. There will be free-of-charge services from 11:00 to 13:00 for 3 months starting from Saturday 29 August 2015.[2] The first phase is 7 km long and has 6 stations from El Goli Station to Ostad Shahriar Station. The frequency of the services right now is every 20 min.[3] Its second phase will be opened some time in summer 2016 and will be from Ostad Shahriar Station and Meydan-e Sa'at Station. When complete, the east-west Line 1 will run for 17·2 km from El Goli to Nur with 18 stations.
Line 2
Line 2 of Tabriz metro is currently under construction
Line 3
Tabriz Urban Train (subway) Line No 3 Genera view of project
Tabriz Urban Train (subway) includes unique features in North-south route
1- Connecting main passenger nods such as Airport, North Terminal ,central park, Bazaar District , Stadium military medical, Academia centers, Yadgar-e-Emam Stadium, South Terminal 2- Foreseeing crossing crowded Slum districts and obtaining the majority of trips ( mare than other lines) 3- Intersection with other Lines, in order to exchange commuter and facilities in 4 points for facilitating trips and organizing inter city commutes
General Characteristics of Tabriz 3rd Line
Route Length: 14.7 km stationg: 14 stops Route start: tabriz international airports(regarding future development) Route End: south Terminal, next at kasaei highway
Implementation Criteria 1- Investor organizes the process of tunnel and stating implantation and regarding municipality provision , cost spent ,the agreements a would be achieved 2- Fleet provision would be on organizations part 3- on inventors request about establishing commercial units next to stations , municipality would help investor interims of construction permit 4- commercial units in station 5, line 1 are considerer das organizations provision in order to supply implement costs 5- Evaluating commercial units would be on agreement of both sides
by: Dr. hossein shahbazi/ public relation of Tabriz Urban Railway Organization (TURO)
Line 4
Line 4 of Tabriz metro will encircle the old city centre and intersect with all the other 3 lines.