Tabriz Metro

Tabriz Metro
مترو تبریز
Overview
Native name Tabriz Urban and Suburban Railway
قطار شهری تبریز و حومه
Owner Tabriz Municipality
Locale Tabriz
Transit type Rapid transit
Website Urban Railway Organization
Operation
Began operation August 27, 2015
Operator(s) Tabriz Urban and Suburban Railway Organization
Technical
System length Line 1 phase 1: 7 km
Track gauge 1,435 mm (4 ft 8 12 in)
(standard gauge)
System Map

Tabriz Urban Railway Organization (TURO), El-Gölü Station.

Tabriz Metro is a metro system serving the city of Tabriz, Iran. The first line opened on 28 August 2015 with 7 km length and 6 stations.[1] There is also one regional commuter line planned to Sahand

Lines

Line 1

Line 1 of Tabriz metro is currently under construction. Its first phase opened on 27 August 2015.The 7 km route runs northwest from El Goli to Ostad Shahryar with four intermediate stations, including three in a tunnel excavated using TBMs.Services are operated with coupled pairs of five-car trainsets. There will be free-of-charge services from 11:00 to 13:00 for 3 months starting from Saturday 29 August 2015.[2] The first phase is 7 km long and has 6 stations from El Goli Station to Ostad Shahriar Station. The frequency of the services right now is every 20 min.[3] Its second phase will be opened some time in summer 2016 and will be from Ostad Shahriar Station and Meydan-e Sa'at Station. When complete, the east-west Line 1 will run for 17·2 km from El Goli to Nur with 18 stations.

Line 2

Line 2 of Tabriz metro is currently under construction

Line 3

Tabriz Urban Train (subway) Line No 3 Genera view of project

Tabriz Urban Train (subway) includes unique features in North-south route

1- Connecting main passenger nods such as Airport, North Terminal ,central park, Bazaar District , Stadium military medical, Academia centers, Yadgar-e-Emam Stadium, South Terminal 2- Foreseeing crossing crowded Slum districts and obtaining the majority of trips ( mare than other lines) 3- Intersection with other Lines, in order to exchange commuter and facilities in 4 points for facilitating trips and organizing inter city commutes

General Characteristics of Tabriz 3rd Line

Route Length: 14.7 km stationg: 14 stops Route start: tabriz international airports(regarding future development) Route End: south Terminal, next at kasaei highway

Implementation Criteria 1- Investor organizes the process of tunnel and stating implantation and regarding municipality provision , cost spent ,the agreements a would be achieved 2- Fleet provision would be on organizations part 3- on inventors request about establishing commercial units next to stations , municipality would help investor interims of construction permit 4- commercial units in station 5, line 1 are considerer das organizations provision in order to supply implement costs 5- Evaluating commercial units would be on agreement of both sides


by: Dr. hossein shahbazi/ public relation of Tabriz Urban Railway Organization (TURO)

Line 4

Line 4 of Tabriz metro will encircle the old city centre and intersect with all the other 3 lines.