Sprat and Winkle Line

Sprat and Winkle Line

Legend
Midland & South Western Jn Rly

West of England Main Line
Andover Junction

West of England Main Line
Andover Town
Clatford

Fullerton to Hurstbourne Line

Test Way Trail

Fullerton Junction

Stockbridge

Horsebridge

Mottisfont
Test Way Trail

Wessex Main Line
Kimbridge Junction
Romsey
Eastleigh to Romsey Line
Nursling

South Western Main Line
Redbridge
South Western Main Line

The Sprat and Winkle Line was the familiar name of a railway line which ran between Andover and Redbridge in Hampshire, UK. It was also known as the Andover to Redbridge Line.

Passenger services between Andover Junction and Romsey were withdrawn on 7 September 1964. The line between Andover Junction and Town was used for freight until 18 September 1967. The track remained for four years after the line was closed, but much of the route between Chilbolton and Kimbridge is now used by the Test Way long-distance footpath.

The line between Romsey and Redbridge is still operational although the intermediate station of Nursling closed in 1957.

Possible origins of the name

The name of the line has two main possible origins. The first is that the southern part of the line ran close to the mud flats of the River Test where the winkle may be found but it is unlikely that the sprat is found there.

The second possible origin of the name may be after the seafood that was carried from Southampton to Andover.

Route of Sprat and Winkle Line near Fullerton
Remains of Fullerton Junction

Operators

History

Construction

The Andover and Redbridge Canal defined the original route of the railway line. The canal was fully completed in 1794 and it provided the adequate transport of goods from Southampton to Andover for 63 years.

With the fast expansion of railways around the UK, the canal company decided to convert the canal into a railway to shorten the distance and increase the speed of the route. In 1857 the canal company changed its name to the Andover Canal & Railway Company, and in 1858 the Andover and Redbridge Railway Company obtained an act of parliament to build the line.

The work of converting the canal to a railway started 28 September 1859, with the serving British Prime Minister, the Rt. Hon. Lord Palmerston K.G, ceremonially cutting the first sod. The railway was built on the filled in canal and was opened for traffic on 6 March 1865. Because the line followed the path of the old canal some curves were very sharp and the line was upgraded and realigned when a new course was laid in 1885.

War

In both the First World War and the Second World War the railway line was invaluable moving troops and war supplies from nearby Salisbury Plain to Southampton on their way to France to fight.

Post War to 1967

The surrounding area of Redbridge to Andover is rural so the majority of passenger traffic was taking people to the beach during the summer. With the many horse racing stables around the Stockbridge area the railway line was also used to transport racehorses around the country.

With better road networks being built, and in spite of the expansion of Andover, the decision was made to close the line north of Romsey.

See also

Further reading

External links

This article is issued from Wikipedia - version of the Wednesday, October 28, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.