Silverliner V
Silverliner V | |
---|---|
#701 on the Chestnut Hill West Line | |
Manufacturer | Hyundai Rotem[1] |
Built at | South Philadelphia, Pennsylvania |
Family name | Silverliner |
Replaced | 73 Silverliner II and Silverliner III's[1] (SEPTA) |
Constructed | 2009-present |
Entered service |
2010-present (SEPTA) 2016 (RTD) |
Number under construction | 62 |
Number built |
Total: 124 SEPTA: 120 RTD: 4 |
Number in service | 120 |
Fleet numbers |
SEPTA: 701-738, 801-882 RTD: 4000-4065 |
Capacity |
SEPTA: 107 Single Car 109 Married Pair Car RTD: 91 per car |
Operator(s) |
SEPTA Denver RTD |
Line(s) served |
SEPTA Regional Rail Denver RTD Commuter Rail |
Specifications | |
Car body construction | Stainless steel[2] |
Car length | 85 ft 0 in (25,908 mm)[2] |
Width | 10 ft 5 in (3,175 mm)[2] |
Height | 12 ft 7 in (3,835 mm)[2] |
Doors |
quarter point SEPTA: 3 per side, 2 with traps. RTD: 4 per side |
Maximum speed |
Design speed: 110 mph (180 km/h)[2] Operating speed: 100 mph (160 km/h)[2](SEPTA) 79 mph (127 km/h)(RTD) |
Weight | 146,600 lb (66,500 kg)[3] |
Traction system | Mitsubishi Electric AC Induction motor, VVVF inverter[2][4] |
Acceleration | 3 mph/s (4.8 km/(h·s)) up to 30 mph (48 km/h) |
Deceleration |
Service: 3 mph/s (4.8 km/(h·s)) up to 50 mph (80 km/h); 2 mph/s (3.2 km/(h·s)) @ 100 mph (160 km/h) Emergency: 3.2 mph/s (5.1 km/(h·s)) |
Electric system(s) |
SEPTA: 12.5 kV 25 Hz AC Catenary 12.5 kV 60 Hz AC Catenary SEPTA and RTD: 25 kV 60 Hz AC Catenary |
Current collection method | Pantograph |
AAR wheel arrangement | B-B |
Bogies | Bolsterless, GSI 70[2] |
Braking system(s) |
Pneumatic, one outboard disc, one tread per wheel.[2] Dynamic/Regenerative |
Coupling system | WABCO Model N-2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
The Silverliner V is an electric railcar designed and built by Hyundai Rotem for the SEPTA Regional Rail system and is now being offered to other commuter rail providers with Denver's RTD being the second purchaser. This is the fifth generation railcar in the Silverliner family of single level EMUs. 735, 736, 871-872 are specifically for use on the Wilmington/Newark line. 821-822 are reserved for use on the Warminster line.
SEPTA
The cars feature expanded interiors and windows, additional entrances and screens used to display information about the service.[5] They are all ADA compliant and meet Federal Railroad Administration safety requirements.[6]
SEPTA had ordered a total of 120 of the cars at a cost of $274 million;[5] the first cars arrived in the United States on 28 February 2010 from South Korea, where they were manufactured by Hyundai Rotem.[5][6] The cars are built in South Korea and final assembly takes place in South Philadelphia.[5] The cars entered revenue service on 29 October 2010 and all 120 were to be completed by the end of 2011.[7] However, due to delays that were reportedly to last until mid-2012, SEPTA is owed millions in fines for the overdue equipment.[8]
The last of the 120 cars arrived on property for testing in February, 2013.
Cars 735, 736, 871 and 872 are owned by Delaware for use on the Wilmington/Newark Line.
Cars 821, 822 are reserved for use on the Warminster line.
Denver Commuter Rail
In 2010 Denver's Regional Transportation District selected the Silverliner V for its new commuter rail line. A total of 66 cars were purchased in the married pair configuration for a total of $300 million. The first four cars were delivered to Denver on December 3, 2014 with service to start in 2016.[9]
Differences between the RTD and SEPTA cars include, support for only 25kv 60Hz AC electrification, four high level doors per side, less powerful traction motors, full-width cabs and bells.
Electromagnetic interference
Some users of audio equipment have found that the presence of tracks carrying Silverliner V cars have introduced detrimental electromagnetic interference to playback and recording of audio. This phenomenon also affects audio and PA electronics inside the cars, although Hyundai Rotem has fitted filters to lessen the effect on internal equipment.[10]
References
- 1 2 Nussbaum, Paul (September 15, 2010). "Test run for two of SEPTA's new Silverliner V train cars". The Philadelphia Inquirer. Retrieved December 17, 2010.
- 1 2 3 4 5 6 7 8 9 "US SEPTA Silverliner-V EMUs". Hyundai Rotem. Retrieved 3 November 2010.
- ↑ Merritt, Athena (October 29, 2010). "Blog: SEPTA’s future is here". Philadelphia Business Journal. Retrieved December 17, 2010.
- ↑ http://www.mbta.com/uploadedfiles/Business_Center/Bidding_and_Solicitations/Kawasaki%20Part%204%20-%20Tab%20I.1%20(Technical%20Approach).pdf Page 7
- 1 2 3 4 "SEPTA Unveils First Silverliner V Train". Progressive Railroading. 3 November 2010. Retrieved 3 November 2010.
- 1 2 "Silverliner V Pilot Cars Arrive". SEPTA. Retrieved 3 November 2010.
- ↑ "SEPTA's new railcar model makes inaugural trip". The Philadelphia Inquirer. 30 October 2010. Retrieved 3 November 2010.
- ↑ "SEPTA owed millions in fines for overdue Philadelphia railcars". newsworks.org. 14 December 2011.
- ↑ http://www.denverpost.com/news/ci_27054763/rtds-new-rail-cars-fastracks-system-unveiled-public
- ↑ "How SEPTA’s New Trains Drove a Recording Engineer Out of Town". Philadelphia Citypaper. 8 May 2013.
External links
Media related to Rotem Silverliner V at Wikimedia Commons
- Silverliner V RFP Technical Specification
- SEPTA Silverliner V Page
- Image of the operating cab
- RTD Variant Fact Sheet
Passenger rail cars and locomotives of SEPTA Regional Rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1960s | 1970s | 1980s | 1990s | 2000s | 2010s | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 | 76 | 77 | 78 | 79 | 80 | 81 | 82 | 83 | 84 | 85 | 86 | 87 | 88 | 89 | 90 | 91 | 92 | 93 | 94 | 95 | 96 | 97 | 98 | 99 | 00 | 01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 15 | |||||||||||||||||
Pioneer III | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Silverliner II | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Silverliner III | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Silverliner IV | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Silverliner V | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRR MP54 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Blueliner | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
EMD AEM-7 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ABB ALP-44 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Budd RDC | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
EMD FP7 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GE U34CH | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Comet I | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Comet II | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Comet III |