Semarang–Solo Toll Road
Route information | |
---|---|
Part of | |
Existed: | 2009 – present |
Major junctions | |
From: | Semarang |
Interchange Tembalang Interchange Ungaran Interchange Bawen | |
To: | Surakarta |
Location | |
Major cities: |
Semarang Surakarta |
Highway system |
Semarang–Solo Toll Road is a part of Trans-Java toll road that connects Semarang, capital city of Central Java and Surakarta (Solo) via Salatiga. This toll road is 75.7 kilometers length which is directly connected with Semarang Toll Road in Tembalang Interchange.
Land acquisition at the end of 2011, Section Ungaran-Bawen was 93 percent, wether Section Bawen-Solo is still under feasibility studies, so land acquisition for all Semarang–Solo Toll Road at early February 2012 was only 26.84 percent. Although all of land acquisitions not yet finished, the road construction has been commenced, due to construction is follows land acquisition. It will be operated by PT Trans Marga Jateng, a subsidiary of state-owned toll road developer and operator PT Jasa Marga (IDX:JSMR) Tbk.[1][2]
Road Section
This toll road has been decided into 5 sections :[3]
1 | Section 1 (Tembalang - Ungaran) | 16.3 km | |
2 | Section 2 (Ungaran - Bawen) | 11.3 km | |
3 | Section 3 (Bawen - Salatiga) | 18.2 km | |
4 | Section 4 (Salatiga - Boyolali) | 22.4 km | |
5 | Section 5 (Boyolali - Karanganyar) | 11.1 km |
Bridges
This toll road has few long bridge, which crosses over both the river and the valley :
Section I (TEMBALANG-UNGARAN)
- Banyumanik 1 (170 m)
- Banyumanik 2 (384 m)
- Gedawang (470 m)
- Susukan (470 m)
- Penggaron (400 m)
Section 2 (UNGARAN-BAWEN)
- Tinalun (335 m)
- Lemah Ireng I (879 m)
- Lemah Ireng II (300 m)
Route
Km | Junction/Interchange | Origin/Direction | Marks | ||
---|---|---|---|---|---|
0.0 | Tembalang Interchange | Semarang Toll Road Section C NORTH Semarang Toll Road Jatingaleh/Krapyak Kaligawe/Tanjung Emas Port Jakarta Demak/Surabaya | Half Trumpet Interchange | ||
SEMARANG CITY TOLL ROAD Operation Border by PT. Jasa Marga, Tbk. Toll Road End/Begin | |||||
SEMARANG-SOLO TOLL ROAD Operation Border by PT. Trans Marga Jateng Toll Road End/Begin | |||||
- | Ramp Jalan Tirto Agung | Jalan Tirto Agung NORTH Tembalang Diponegoro University SOUTH Banyumanik/Jatingaleh Ungaran/Bawen | |||
BANYUMANIK TOLL PLAZA Close Tolled System | |||||
Semarang City and Semarang Regency Border | |||||
- | Ungaran Interchange | UNGARAN TOLL PLAZA Kota Ungaran NORTH Banyumanik/Semarang SOUTH Bawen/Ambarawa Magelang/Yogyakarta Salatiga/Solo | Trumpet Interchange | ||
- | Bawen Interchange | BAWEN TOLL PLAZA EAST Salatiga/Solo WEST Bawen Junction
| Trumpet Interchange | ||
End of Section 2 Semarang–Solo Toll Road Next Plan : Section 3 | |||||
References
|