Overview
Locale Vantaa, Southern Finland
Termini Vantaankoski
Merges with Main line (local tracks)
between Hiekkaharju
and Koivukylä stations
Stations 5 (+ 3)
Operation
Opened 1 July 2015
Technical
Line length 18 km (11 mi)
No. of tracks Double track
Track gauge 1,524 mm (5 ft)
Electrification 25 kV @ 50 Hz
Operating speed 120 km/h (75 mph)
Route map

Legend
( Helsinki / Helsingfors )
Vantaankoski / Vandaforsen
Overpass Kehä III
Vehkala / Veckal
Petas (reservation)
( Klaukkala (planned) )
Underpass Valtatie 3
Kivistö
Vantaanjoki
Viinikkala / Vinikby (reservation)
Aviapolis
Airport / Lentoasema / Flygplatsen
Ruskeasanta / Rödsand (reservation)
Leinelä / Lejle
( Riihimäki )
Hiekkaharju / Sandkulla
Tikkurila / Dickursby
( Helsinki / Helsingfors )

Kehärata (the Ring Rail Line, previously Marjarata, Swedish: Ringbanan) is a railway route in the area of the city of Vantaa, in the Greater Helsinki Metropolitan Area of Finland. It connects Helsinki-Vantaa Airport and the adjacent Aviapolis business and retail district to the Helsinki commuter rail network. The line fills a gap between the existing Vantaankoski railway station and Tikkurila railway stations, travelling in tunnels underneath the airport.

The line started operating on 1 July 2015.

History

The founding stone of the line was laid on 3 March 2009,[1] and construction was started on 13 May 2009 with the excavation of service tunnels. The excavation of a 300 m long tunnel station under the airport was completed in March 2010, as the construction was proceeding on schedule.[2]

In February 2011, a video on the project's official website stated that the project would be open by June 2014. It announced various new details, including that the station at Tikkurila would be entirely rebuilt as an integrated travel centre, as well as details on the trains that would serve the airport.[3] In September 2012, the opening date was pushed back to July 2015, due to the unexpected need to re-design and reinforce the airport station tunnel to withstand the acidic products of glycol decay by bacteria within the ground.[4] The ground and bedrock at the airport are contaminated by decades of glycol use as an aircraft de-icing agent.

The Ring Rail Line started operating on 1 July 2015. The station at the Helsinki Airport opened later, with the Tietotie entrance opening on 10 July and the direct connection to the terminal opening later in the Autumn.[5]

Route

The new line creates a connection from the airport to Helsinki Central railway station, as well as the suburban areas on the route. The new railway leaves the mainline going north from Helsinki after Tikkurila station in the east, travel via the airport and into Vantaankoski station to the west, joining the existing the branch line for western Vantaa which was previously served by the "M" train. Five new stations were built, with space reserved for three more in the future.[4][6]

The line is served by the "P" and "I" trains which travel the ring clockwise and counterclockwise respectively. The journey time from the airport to Helsinki Central Railway Station is 27 minutes ("P" train) or 32 minutes ("I" train), whilst the time to Tikkurila, to connect with long-distance trains going north or east, is 8 minutes. Both trains operate every 10 minutes in the daytime.[7]

Stations

Leinelä, one of the new stations, in 2015.

In the first phase, five new stations were built at Vehkala, Kivistö, Aviapolis, Helsinki-Vantaa Airport and Leinelä. Out of these, the Aviapolis and Airport stations are located in a tunnel. Reservations have been made for three additional stations: Petas (surface), Viinikkala (tunnel) and Ruskeasanta (tunnel).

Cost

The projected cost of the construction is €655 million as of September 2012,[4] up from €605 million in March 2010.[2] The estimated cost of the project in December 2014 was €738.5 million.[8] The current estimated cost of the project is €773.8 million[8]

Future development

Separate proposals exist to extend the Helsinki Metro to the airport,[9] and to move long-distance services from the current main North-South corridor to a new railway between Pasila and Kerava, passing through the airport. This new route would travel in a long tunnel under the airport and allow direct access from long-distance trains, as well as free the rail capacity taken up by long-distance traffic in the current main corridor for the increasing local commuter traffic.[10]

See also

References

  1. "Laying of Ring Rail Linecornerstone in Vantaa today". Kehärata. 6 March 2009. Retrieved 6 February 2011.
  2. 1 2 "Vantaan Kehärata-projekti etenee kuin juna". YLE Helsinki. 17 March 2010. Retrieved 6 February 2011.
  3. "Kehärata". Retrieved 6 February 2011.
  4. 1 2 3 http://portal.liikennevirasto.fi/sivu/www/f/hankkeet/kaynnissa/keharata/ajankohtaista/tiedotteet/valmis%202015
  5. "Ring Rail Line opens to traffic on 1 July – travel to the airport via the Aviapolis station". HSL. 25 June 2015. Retrieved 1 July 2015.
  6. "Kehäradan reitti ja asemat". Kehärata. Retrieved 6 February 2011.
  7. "Ring Rail Line trains will stop at all stations". HSL. 14 April 2015. Retrieved 1 July 2015.
  8. 1 2 "Liikennevirasto: Kehärata". Liikennevirasto.
  9. "Lentokenttämetro, Toiminnalliset tarkastelut" (PDF). Helsinki Regional Transport Authority. 2006. p. 3. Retrieved 13 January 2016.
  10. "Lentoaseman kaukoliikennerata, Ratayhteysselvitys" (PDF). Finnish Transport Agency. 2010. p. 7. Retrieved 13 January 2016.

External links

Wikimedia Commons has media related to Vantaankoski–Tikkurila railway.

This article is issued from Wikipedia - version of the Saturday, January 23, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.