Raipur-Bhilai-Durg Expressway
Raipur-Bhilai-Durg Expressway | |
---|---|
Route information | |
Length: | 26.6 km (16.5 mi) |
History: | Completed in 2006[1] |
Major junctions | |
From: | Raipur |
To: | Durg |
Location | |
States: | Chhattisgarh |
Highway system | |
Raipur-Bhilai-Durg Expressway is a 26.6-kilometre-long (16.5 mi) high-speed urban expressway which links Raipur- Bhilai and Durg on National Highway 6 (NH-6) in the state of Chhattisgarh. The expressway also connects Chhattisgarh with Visakhapatnam, one of the most important ports of India.[2] The expressway has two toll stations installed, one at Kharun - at the entry point of the expressway from Raipur and the other at Kosanala - at the exit point of the expressway towards Durg.
The construction work of Raipur-Durg Expressway Project, worth Rs 95 crore was awarded by the National Highways Authority of India to DS Constructions Ltd (DSC).[3] The expressway has been constructed on a Build-Operate-Transfer (BOT) basis with a concession period of 11 years 9 months, including the construction period of the project.[4] The work included four laning of the existing two-lane carriageway on the Raipur-Durg section of NH-6 in Chhattisgarh.[5] This has reduced the travel time between Raipur and Durg.[6]
References
- ↑ Completion of Raipur-Durg Expressway project
- ↑ Delhi firm bags Rs 190 cr NHAI road contract
- ↑ The Hindu Business Line : DS Constructions completes expressway. Thehindubusinessline.in (2006-06-19). Retrieved on 2013-12-06.
- ↑ Delhi firm bags Rs 190 cr NHAI road contract. Business Standard (2006-01-11). Retrieved on 2013-12-06.
- ↑ DS Constructions completes Raipur-Durg Expressway Project
- ↑ Raipur Durg : Latest News on Raipur Durg , Raipur Durg Updates, Raipur Durg Videos, Photos, Wiki, Topic. Moneycontrol.com. Retrieved on 2013-12-06.