Purple Line (Namma Metro)

Purple Line

A Purple Line metro train waiting at Halasuru Metro Station.
Overview
Type Metro
System Namma Metro
Locale Bangalore, Karnataka, India
Termini Baiyyapanahalli (Phase I), Whitefield (Phase II)
Mysore Road (Phase I), Kengeri (Phase II)
Stations 17 (Phase I)
35 (Phase II)
Daily ridership 25,000 (November 2015)[1]
Operation
Opened 20 October 2011
Owner Bangalore Metro Rail Corporation Limited (BMRCL)
Character Elevated and underground
Depot(s) Baiyappanahalli
Technical
Line length 18.22 km (Phase I)
34.30 km (Phase II)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 V DC third rail
Operating speed 32 km/h (20 mph)
Route map
Legend
Whitefield
Ujwala Vidyalaya
Kadugodi
International Tech Park
Satyasai Medical Institute
Vaidehi Hospital
Kundalahalli
Visvesvaraya Industrial Estate
Doddanakundi
Garudacharpalya
Mahadevapura
Narayanapura
KR Puram

Jyothipuram
BaiyappanahalliParking
Swami Vivekananda RoadParking
Indiranagar
Halasuru
Trinity
Mahatma Gandhi Road
Gottigere - Nagavara line

Cubbon Park

Vidhana Soudha
Sir M. Visveshwarya

KempegowdaGreen Line (Namma Metro) Green Line

City railway stationMainline rail interchange

Magadi Road
Hosahalli
Vijayanagar
Attiguppe
Deepanjali Nagar
Mysore Road

Nayandahalli
Rajarajeshwari Nagar
Bangalore University
R.V. College of Engineering
Kengeri

The Purple Line of the Namma Metro is part of the metro rail system for the city of Bangalore, India. Under Phase I, there will be 17 stations, totalling a distance of 18.22 km on this line. Once finished under Phase II, it will consist of 36 stations from Whitefield in the east to Kengeri in the west. The line will measure 40.10 km and will be mostly elevated, with some stations underground. Currently, a 13.32 km stretch between Baiyyappanahalli and M. G. Road and between Mysore Road to Magadi Road is operational. The line connects the eastern, central and western areas of Bangalore. The Phase I extension, from Mysore Road to Baiyyappanahalli is expected commence operations by March 2016, thereby completing the entire Purple Line stretch.

History

The following dates represent the dates the section opened to the public, not the private inauguration.

History
Section Extension date Termini Length Stations
Reach 1 20 October 2011BaiyappanahalliM.G. Road6.70 kilometers (4.16 mi)6
Reach 2 16 November 2015 Mysore Road Magadi Road 6.52 kilometers (4.05 mi)6
UG 1 March 2016 Vidhana Soudha Magadi Road 4.90 kilometers (3.04 mi) 5
Phase II Extensions WhitefieldBaiyappanahalli15.50 kilometers (9.63 mi)13
Mysore RoadKengeri4.88 kilometers (3.03 mi)5
Total WhitefieldKengeri40.10 kilometers (24.92 mi)35

The detailed project report (DPR) for Phase I, comprising the Purple and Green Lines, of the Namma Metro project was prepared by the Delhi Metro Rail Corporation (DMRC) and submitted to the BMRCL in May 2003. The final approval on a scheme that incorporated the expertise of DMRC and RITES Limited did not come until April 2006.[2] The DPR prepared by DMRC envisaged a 33 km (21 mi) elevated and underground rail network with 32 stations for Phase I of the project. The proposed gauge was standard gauge unlike the broad gauge on the Delhi Metro network. The rationale for the metro includes reduced journey times, cutting fuel use, accident reduction and lower pollution.

Construction work for Phase I of the Namma Metro project was scheduled to start in 2005 but was delayed by a February 2006, due to change of government in Karnataka and continued debate over whether the project was financially feasible and appropriate for the city. Finally, on 25 April 2006, the Indian Cabinet approved the project, which was then budgeted at more than 54 billion (US$790 million).[3] The cost escalated to 116.09 billion (US$1.7 billion) as various problems delayed the completion.[4] BMRCL received 7 billion (US$100 million) from Housing and Urban Development Corporation (HUDCO), 250 million (US$3.7 million) from the Asian Development Bank (ADB), 23% from the Central Government, 33% from the State Government and the rest as a 49.05 billion (US$720 million) loan from the Japan International Cooperation Agency (JICA).[5][6] Navayuga Engineering was awarded the contract to construct Reach 1 of the Purple Line in 2006.[7] The foundation stone for the Phase I construction was laid by Prime Minister Manmohan Singh on 24 June 2006,[8] and civil construction on Reach I of the line, between M.G. Road and Baiyyappanahalli, commenced on 15 April 2007.[9] The underground work commenced in May 2011. Each corridor consists of two tunnels which are the first underground tunnels built for trains in South India. The tunnels, dug using tunnel boring machines (TBM), are located approximately 60 feet below ground level, have a diameter of 5.5 metres and are 5 metres apart. Four TBMs, nicknamed Helen (TBM 1), Margarita (TBM 2), Kaveri (TBM 3) and Krishna, were used for tunnelling work on the Purple Line.[10][11][12][13][14][15]

Reach 1 was originally scheduled to begin operations in March 2010.[16] Reach 2, the remaining elevated section of Purple Line was scheduled to be completed by December 2012. But it will open fully by February 2016.[17] After the deadline was missed, the Bangalore Metro Rail Corporation Ltd (BMRCL) shifted the deadline to 31 December 2010. It was again changed to 4 April 2011 and then the date of inauguration was set at 15 September 2011. The next deadline set was 26 September 2011 which was also missed. The metro was finally opened to the public on 20 October 2011 at 4 pm IST by Union Urban Development Minister Kamal Nath.[16] There was an overwhelming response to the metro at the commencement of operations. As per BMRCL sources within first three days of operations, 169,019 people used this mass transit system.[18] At the end of 4th day about 200,000 passengers had already commuted in Namma Metro. Namma Metro's first 12-day cumulative revenue was 10 million (US$150,000).[19] During the first month, since the opening of Reach I, about 1,325,000 people travelled by the metro.[20] On average, 41,390 people took the train every day, while the average daily revenue was 667,262. The BMRC earned a revenue of 21 million (US$310,000) in its first month of operation.[21] In the first six months of operation, average ridership went down to 24,900. The BMRC earned a total of 66 million (US$970,000) during the same period.[22] Namma Metro posted a profit of 4.1 million (US$60,000) after almost one year of operating Reach I. BMRCL estimates that nearly 8 million passengers travelled on the system, in its first year of operations.[23]

Stations

Initially, there were no toilets at Namma Metro stations, despite demand from commuters. BMRCL countered the demand by arguing that constructing toilets was not part of the metro construction plan, and that building toilets in the city was the responsibility of the Bruhat Bengaluru Mahanagara Palike (BBMP). They also justified the decision by saying that commuters spent "hardly five minutes" at stations, so restrooms were not required, and also that none of the Bangalore Metropolitan Transport Corporation (BMTC) bus stops in the city had toilets for passengers. However, BMRCL eventually heeded public demand, and the metro's first toilets were opened at Baiyappanahalli and Indiranagar stations on 21 June 2013.[24]

In September 2015, it was announced that the proposed Narayanapura metro station would be removed from the network, and the proposed Krishnarajapuram metro station would be shifted by 295 metres to the west, due to difficulty in acquiring land in the area.[25]

Yellow tactile tiles are used at all stations to guide the visually impaired. The tiles start at the ramp and lead to the staircases and lifts.[26]

Purple Line
# Station Name Opening Connections Layout
1Whitefield None
2Ujwala Vidyalaya None
3Kadugodi None
4ITPL None
5Satyasai Medical Institute None
6Vydehi Hospital None
7Kundalahalli None
8Visvesvaraya Industrial Estate None
9Doddanakundi None
10Garudacharapalya None
11Mahadevapura None
12KR Puram None
13Jyothipuram None
14Baiyappanahalli 20 October 2011 NoneElevated
15Swami Vivekananda Road 20 October 2011 NoneElevated
16Indiranagar 20 October 2011 NoneElevated
17Halasuru 20 October 2011 NoneElevated
18Trinity 20 October 2011 NoneElevated
19Mahatma Gandhi Road 20 October 2011 Gottigere - Nagawara LineElevated
20Cubbon Park March 2016 NoneUnderground
21Vidhana Soudha March 2016 NoneUnderground
22Sir M. Visveshwaraya March 2016 NoneUnderground
23Majestic March 2016      Green LineAt Grade
24City Railway Station March 2016 NoneUnderground
25Magadi Road 16 November 2015 NoneElevated
26Hosahalli 16 November 2015 NoneElevated
27Vijayanagar 16 November 2015 NoneElevated
28Attiguppe 16 November 2015 NoneElevated
29Deepanjali Nagar 16 November 2015 NoneElevated
30Mysore Road 16 November 2015 NoneElevated
31Nayandahalli None
32Rajarajeshwari Nagar None
33Bangalore University None
34R.V. College of Engineering None
35Kengeri None
Interior of the Metro coach
Interior of the Metro coach on inauguration day
MG Road Station at night

Parking

Currently parking facilities are available only in Baiyyappanahalli and Swami Vivekananda Road stations. But after the completion of Phase I by mid-2016, more stations would be having parking lots. The BMRCL awarded the contract to Central Parking Services (CPS) for an annual license fee of 2.5 million (US$37,000).[27] An average of 4,764 cars and 5,721 two-wheelers use parking facilities at Baiyappanahalli and SV Road stations daily.[23]

References

  1. Kulkarni, Tanu (5 April 2014). "Byappanahalli-M.G. Road metro stretch more popular". The Hindu.
  2. "Bangalore Metro Rail Project Phase 2" (PDF). Bangalore Metro Rail Corporation Limited.
  3. "Cabinet approves Bangalore metro". Online Edition of The Economic Times. 28 April 2006.
  4. "It's official: Namma Metro Phase-1 not before 2014". Deccan Chronicle. 21 December 2011. Retrieved 3 January 2012.
  5. "Namma Metro Phase II requires Rs. 25,000 crore – southindia – Hyderabad – ibnlive". Ibnlive.in.com. Retrieved 21 October 2011.
  6. "Metro rail projects: Four new metromen and their challenges – Economic Times". The Economic Times. 18 December 2011. Retrieved 3 January 2012.
  7. "Award of contract" (PDF). Official webpage of B.M.R.C. Retrieved 2 October 2011.
  8. "PM lays foundation stone for Metro project". PM office website.
  9. "Bangalore Metro Rail Work to begin on Feb 3, 2007". The Times of India. 21 January 2007. Retrieved 16 October 2007.
  10. Rohith B R, Bangalore, 14 Oct 2012, DHNS: (14 October 2012). "Automation helps precise work on metro tunnels". Deccan Herald. Retrieved 4 March 2013.
  11. RohithB R, Bangalore, 13 Oct 2012, DHNS : (13 October 2012). "Metro makes steady inroads". Deccan Herald. Retrieved 4 March 2013.
  12. Special Correspondent (28 September 2012). "A smoother passage for Margarita". The Hindu (Chennai, India). Retrieved 4 March 2013.
  13. Bangalore, 23 Sep 2012, DHNS : (23 September 2012). "Tunnelling along north-south corridor to begin soon". Deccan Herald. Retrieved 4 March 2013.
  14. Update : 06:47 pm IST (18 December 2012). "Metro rushes to meet deadline". Deccan Chronicle. Retrieved 4 March 2013.
  15. Bangalore, 21 Feb 2013, DHNS (21 February 2013). "After Helen, Margarita, it's Krishna and Kaveri". Deccan Herald. Retrieved 4 March 2013.
  16. 1 2 "Metro comes to Bangalore finally". The Times of India. 20 October 2011.
  17. "metro-phase-i-to-be-fully-ready-by-march-2015" (Press release). The Hindu. 29 August 2011. Retrieved 19 October 2013.
  18. "Revenue Services Report" (PDF).
  19. Madhumathi D.S. "Business Line : Industry & Economy / Logistics : Namma Metro rides on 'gawk' power". Business Line. Retrieved 3 January 2012.
  20. "13.25 lakh rode the Metro – The Times of India". The Times of India. 25 November 2011.
  21. "Namma Metro gains momentum – southindia – Bangalore – ibnlive". Ibnlive.in.com. Retrieved 3 January 2012.
  22. "Joyrides in Bangalore Metro are over – Bangalore – DNA". Daily News and Analysis. Retrieved 25 July 2012.
  23. 1 2 "Bangalore Metro posts Rs 41 lakh profit in first year – Bangalore – DNA". Daily News and Analysis. 18 October 2012. Retrieved 18 October 2012.
  24. "At Metro, wanna pee? Pay Rs 3 - Bangalore - DNA". Dnaindia.com. Retrieved 2013-09-28.
  25. Lalitha, S. (25 September 2015). "Namma Metro Phase II to be Realigned at 2 Stations". New Indian Express.
  26. G. Ananthakrishnan (14 January 2013). "Linking modes of commute". The Hindu (Chennai, India). Retrieved 4 March 2013.
  27. "Park car, pay more at metro". The Hindu (Chennai, India). 30 March 2012.
This article is issued from Wikipedia - version of the Saturday, February 13, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.