Pobeda Solar Park

Pobeda Solar Park
Location of Pobeda Solar Park in Bulgaria
Country Bulgaria
Location Pleven Province
Coordinates 43°31′16″N 24°32′30″E / 43.52111°N 24.54167°E / 43.52111; 24.54167Coordinates: 43°31′16″N 24°32′30″E / 43.52111°N 24.54167°E / 43.52111; 24.54167
Status Operational
Commission date 2012
Owner(s) Hareon Solar
Operator(s) ABB
Solar farm
Type Flat-panel PV
Power generation
Nameplate capacity 50.6 MW

Pobeda Solar Park is a 50.6 MW photovoltaic (PV) plant in Pobeda, in the Pleven Province of Northern Bulgaria.

The power plant is monitored from a control center in Sofia, along with three other photovoltaic power plants totaling 85 MW, expected to produce a combined total of 95 GWh/year.[1][2][3]

This projects was funded through the E.U and is one more step that Bulgaria is making to modernize and join their fellow E.U. countries with efforts to expand clean energy.

On July 2, 2012 the control module and transformer were damaged by a rocket-propelled grenade, shortly before the power plant was connected to the grid.[4]

See also