Pen-y-Mount Junction railway station

Pen-y-Mount

Pen-y-Mount Junction
Location
Place Porthmadog
Area Gwynedd
Coordinates 52°56′03″N 4°07′26″W / 52.93415°N 4.12392°W / 52.93415; -4.12392Coordinates: 52°56′03″N 4°07′26″W / 52.93415°N 4.12392°W / 52.93415; -4.12392
Grid reference SH573395
Operations
Managed by Welsh Highland Heritage Railway
Owned by WHR Ltd
Platforms 2
History
1980 Opened
2007 Line north opened to Traeth Mawr
Stations on heritage railways in the United Kingdom
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
UK Railways portal

Pen-y-Mount Junction station is the northern terminus of the Welsh Highland Heritage Railway (WHHR) in Porthmadog, Wales. It opened on 2 August 1980 at which time it consisted of a single platform with a run round loop and was intended to be a temporary terminus.

In 1990, a siding was laid into the yard for works trains. After the Festiniog Railway Company gained the authority to rebuild the original Welsh Highland Railway (WHR), it was decided to turn Pen-y-Mount station into a representation of a typical WHR station.

In 1996, a replica WHR corrugated iron station building was constructed. Its design was based upon the original Nantmor railway station. Subsequently, genuine WHR fencing, including a kissing gate, was erected along the back of the platform.

In 2000, the WHHR began construction of the WHR main line, under the terms of their 1998 agreement with the Festiniog Railway Company. This included clearing, preparing the track bed, tracklaying and ballasting. The northern end of the WHHR line was also re-modelled and, in 2002, the existing headshunt was replaced with a full crossover so it could connect with the FR owned WHR main line. A new headshunt loading spur was also constructed.[1] They also helped construct the mainline between Pen-y-Mount and the Porthmadog Cross Town Link.

The WHHR finished construction work in 2007. Under the terms of the 1998 agreement, they were allowed to use the new line and retain all revenue from it until the FR had finished constructing the remainder of the WHR. During 2007 and 2008, WHHR trains terminated at Traeth Mawr Loop rather than Pen-y-Mount. In 2008, the Traeth Mawr loop was removed and WHHR trains used push-pull operation.

In 2008, the Welsh Highland Construction Company (an FR Co. subsidiary) connected the two ends of the Welsh Highland Railway and took possession of the line from Traeth Mawr to Pen-y-Mount and, since 2009, WHHR trains have terminated at Pen-y-Mount. It is hoped that in future the WHHR will have running rights over the FR-owned WHR mainline and that the station will become an interchange between the two railways. The two companies, however, are still in discussion over these issues and have yet to reach an agreement. It is intended that Pen-y-Mount Junction will have three platforms, with lines to Beddgelert and both Porthmadog Termini.

References

  1. "Pont Croesor Extension project".

External links

See also

Preceding station   Heritage railways Following station
Terminus   Welsh Highland Heritage Railway   Gelert's Farm halt


This article is issued from Wikipedia - version of the Saturday, March 23, 2013. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.