Operational Requirement

An Operational Requirement or (OR) was a UK Air Ministry document setting out the required characteristics for a future (i.e., as-yet unbuilt) military aircraft or weapon system.

The OR would describe what intended role the aircraft would be used for, e.g., bomber, fighter, etc., or what type of weapon was required, e.g., gun armament, bomb type, etc.

In conjunction with any official specification, manufacturers would then choose whether to design an aircraft or weapon for this particular requirement.

Operational Requirements were carried-over with the dissolution of the Air Ministry and the creation of the Ministry of Defence.

Other requirements

An Experimental Requirement (ER) was for an aircraft for research purposes, e.g. ER.100 in support of development of the English Electric Lightning.

See also


This article is issued from Wikipedia - version of the Friday, June 28, 2013. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.