Oakland Coliseum Station
Oakland Coliseum Station | ||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Amtrak station BART rapid transit station | ||||||||||||||||||||||||||||||||||
BART station platform | ||||||||||||||||||||||||||||||||||
Location |
700 73rd Avenue Oakland, CA 94621 (Amtrak) 7200 San Leandro Street Oakland, CA 94621 (BART) | |||||||||||||||||||||||||||||||||
Coordinates | 37°45′13″N 122°11′49″W / 37.75361°N 122.19694°WCoordinates: 37°45′13″N 122°11′49″W / 37.75361°N 122.19694°W | |||||||||||||||||||||||||||||||||
Owned by | Amtrak, Bay Area Rapid Transit | |||||||||||||||||||||||||||||||||
Line(s) |
Amtrak BART | |||||||||||||||||||||||||||||||||
Platforms |
1 side platform (Amtrak) 1 island platform (BART) 1 side platform (BART to OAK) | |||||||||||||||||||||||||||||||||
Tracks |
3 (Amtrak) 2 (BART) 1 (BART to OAK) | |||||||||||||||||||||||||||||||||
Connections |
AC Transit: Routes 45, 46*, 73, 98 (local); 805 (All Nighter) * - Route operates weekdays only Pedestrian walkway to Amtrak Station, O.co Coliseum and Oracle Arena | |||||||||||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||||||||||
Parking |
35 spaces (Amtrak); 1013 spaces - Monthly Reserved, Daily ($1), Extended Weekend (free)[1] | |||||||||||||||||||||||||||||||||
Bicycle facilities | Two lockers | |||||||||||||||||||||||||||||||||
Disabled access | Yes | |||||||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||||||
Station code | OAC (Amtrak) | |||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||
Opened |
September 11, 1972 (BART) May 25, 2005 (Amtrak) November 22, 2014 (BART to OAK Airport) | |||||||||||||||||||||||||||||||||
Traffic | ||||||||||||||||||||||||||||||||||
Passengers (2015) | 57,491 annual[2] 9.1% (Amtrak) | |||||||||||||||||||||||||||||||||
Passengers (FY2014) | 7,819 weekday[3] 0.1% (BART) | |||||||||||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||||||||||
|
Oakland Coliseum is a complex of three stations of two public transit providers that are within 600 feet (180 m) of each other: Amtrak Capitol Corridor's Oakland Coliseum station, Bay Area Rapid Transit (BART)'s Coliseum station, and the BART to Oakland International Airport automated guideway transit (AGT) terminal.[4] They are located in East Oakland, and are connected to each other, and to the O.co Coliseum and the Oracle Arena by pedestrian bridges. BART and Capitol Corridor Joint Powers Authority (CCJPA), Capitol Corridor's administration agency, will sometimes refer to these separate stations as one station.
In addition to the Coliseum–Oakland International Airport AGT line, AC Transit bus routes 73 (73rd Avenue) and 805 (All-Nighter) also provide service between the BART station and Oakland International Airport.
BART's Coliseum station consists of an elevated island platform with the concourse mezzanine at ground level. The BART to OAK Airport station has a single track and side platform.
Capitol Corridor's Oakland Coliseum station, the newest Capitol Corridor station, consists of a side platform on a side track. It is unstaffed, but has an electronic ticketing system.
History
Originally known as the Coliseum/Oakland Airport station, it opened as part of BART's initial service on September 11, 1972,[5] connecting the Oakland-Alameda County Coliseum and the Coliseum Arena via a pedestrian bridge going above then-existing railroad tracks which were later used by Capitol Corridor, beginning with the service's inception in 1991.
In 2002, CCJPA, in conjunction with Caltrans and the City of Oakland, decided to build a Capitol Corridor station there. The new station, officially named "Oakland Coliseum" station, opened on May 25, 2005, and included a new connection to the original BART-Oakland Coliseum pedestrian bridge, thus enabling transfers between the two services.
In October 2009, Oakland City Council voted its approval for a 3.2-mile (5.1 km) extension of BART to Oakland International Airport.[6] Preliminary construction began in late 2010; the service began on November 22, 2014.[7] Fares for the BART to OAK Airport service are $6.[8]
After the Coliseum–Oakland International Airport line opened in November 2014, the official name for the BART station, previously "Coliseum/Oakland Airport Station", became "Coliseum Station", freeing the BART to OAK terminus station at the airport to be named "Oakland International Airport Station".[9]
Ridership
Of the 44 BART stations, Coliseum station was the 16th-busiest in FY2014, detraining an average of 7,819 passengers each weekday.[3]
Oakland Coliseum served an average of approximately 157 Amtrak passengers daily in 2015.[2]
Platforms and tracks
Track and platform layout | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
BART
Northbound/Westbound | ■ Richmond–Fremont | toward Richmond (Fruitvale) |
■ Fremont–Daly City | toward Daly City (Frutivale) | |
■ Dublin/Pleasanton–Daly City | toward Daly City (Fruitvale) | |
Southbound/Eastbound | ■ Richmond–Fremont | toward Fremont (San Leandro) |
■ Fremont–Daly City | toward Fremont (San Leandro) | |
■ Dublin/Pleasanton–Daly City | toward Dublin / Pleasanton (San Leandro) | |
Westbound | ■ Coliseum–Oakland International Airport | toward Oakland International Airport (Terminus) |
Amtrak
Side track | ■ Capitol Corridor | toward Auburn (Oakland – Jack London Square) |
■ Capitol Corridor | toward San Jose (Hayward) | |
Mainline tracks | ■ Coast Starlight | No stops |
See also
References
- ↑ "Parking". Bay Area Rapid Transit (BART). Retrieved 2014-12-20.
- 1 2 "Amtrak Fact Sheet, Fiscal Year 2015 State of California" (pdf). Amtrak. November 2015. Retrieved 2015-01-23.
- 1 2 "BART Fiscal Year Weekday Average Exits" (xlsx). Bay Area Rapid Transit (BART). 2014. Retrieved 2014-12-20.
- ↑ "Schedules By Line (with map)". Bay Area Rapid Transit (BART). 2014. Retrieved 2014-12-20.
- ↑ "Celebrating 40 Years of Service 1972 • 2012 Forty BART Achievements Over the Years" (PDF). Bay Area Rapid Transit (BART). 2012. Retrieved 2013-11-30.
- ↑ Jones, Carolyn (October 8, 2009). "Oakland unexpectedly OKs BART airport extension". San Francisco Chronicle.
- ↑ "New BART service to Oakland International Airport now open". Bay Area Rapid Transit (BART). November 21, 2014. Retrieved 2014-12-02.
- ↑ Cabanatuan, Michael (June 13, 2014). "$6 rides for BART's Oakland Airport Connector". San Francisco Chronicle. Retrieved 2014-12-20.
- ↑ "BART's Oakland Airport Connector one year away from completion". RT&S. Retrieved 2013-10-28.
External links
Media related to Oakland Coliseum (Amtrak/BART station) at Wikimedia Commons
|