Nunobiki Plateau Wind Farm
The Nunobiki Highlands Wind Farm (郡山布引高原風力発電所 Kōriyama Nunobiki Fūryoku-hatsudensho) is a wind farm operated by the electric utility company J-Power alongside Lake Inawashiro in Kōriyama, Fukushima, Japan. It is approximately 1,080 meters above sea level.
The wind farm produces 65.98 megawatts of power using a total of 33 type Enercon E-70, wind turbines, and generates enough power for approximately 35,000 houses.[1]
The facility began operating in February 2007. Each wind turbine is about 100 meters high, and each turbine blade is about 30 meters long.
See also
References
- ↑ "Japan taps into ocean winds for power - ABC News (Australian Broadcasting Corporation)". Retrieved 2008-05-07.
External links
- Official website (Japanese)
37°24′15″N 140°04′06″E / 37.40417°N 140.06833°ECoordinates: 37°24′15″N 140°04′06″E / 37.40417°N 140.06833°E
This article is issued from Wikipedia - version of the Friday, October 10, 2014. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.