The Nosbonsing and Nipissing Railway (N&N) was a portage railway constructed by Ottawa lumber barron John Rudolphus Booth.[1] The 5.5 miles (8.9 km) line connected Lake Nippising with Lake Nosbonsing[2] to allow lumber to be portaged onto the Mattawa River, and from there to the Ottawa River.[3] It allowed timber from a wide area across central Ontario to be sent to Booth's mill in Ottawa, at that time the largest sawmill in the world.[4]
Nipissing is the lower of the two lakes, with the land between them otherwise fairly flat. A 150 foot (46 m) long jack ladder was built at Nipissing to haul logs up the 65 foot (20 m) bank into a large loading station, a roofed but otherwise open building 220 by 45 foot (67 m × 14 m). The ladder was powered by a 44 inches (1,100 mm) waterwheel in a large flume with water supplied from the adjacent Wasi River, which also drove a pump when needed for fire fighting or refilling the locomotive.[5]
The line was completed in August 1884 and initially operated as a private line. However, when the Northern and Pacific Junction Railway (N&PJ) began construction of their north-south line in the same area, Booth officially chartered the N&N in March 1886. The N&PJ had already secured crossing rights, but had to renegotiate them with the newly chartered N&N. The N&PJ, part of the Northern Railway of Canada, was not amused. Their negotiation position was to threaten to rip up the N&N tracks. Booth responded by purchasing a diamond intersection ands giving it to the Northern to install. However, the N&N retained the crossing rights, which allowed them to hold up Northern traffic at their leisure.[5]
Traffic on the line was initially very busy, with the single locomotive hauling a train of 22 flatbed cars back and forth between the two ends. When it arrived at the western end with the empty train, it would drop the empty cars off on a siding, then switch to the mainline to pull 11 filled cars out onto the line, drawing another 11 into the loading station. Once these were loaded the train left for the eastern end while the empty cars are pulled into the station by hand. At the eastern end the logs were simply rolled down into Nosbonsing, the entire operation taking two men only 2.5 minutes. Typically 10 trips were made per day, with a total of 4,000 logs.[3] The rate increased to 14 a day at one point, at which point the crews striked.[5]
This railway was abandoned in 1912 with the ending of major logging operations in the area. The charter of the N&N was transferred to Booth's Egan Estates Railway, near Madawaska. In 1914, the original N&N railbed was used as the basis for Booth Road. Today the route has a number of names, starting as Wasi Falls Road at the west end, becoming Route 654 until it crosses Ontario Highway 11 where it becomes Lake Nosbonsing Road, and finally becoming Booth Road again just short of the eastern end at Lake Nosbonsing in the town of Astorville.
See also
References
Citations
Bibliography
- Churcher, Colin. "The Nosbonsing and Nipissing Railway". Colin Churcher's Railway Pages.
- Mackey, Doug (10 November 2000). "Jackladder, railway great investments for Booth". Past Forward Heritage.