Nanchang Metro

Nanchang Rail Transit
Overview
Locale Nanchang, Jiangxi, China
Transit type Rapid transit
Number of lines 1 (operational)
1 (under construction)
5 (planned)
Number of stations 24 (2015)
Operation
Operation will start December 26, 2015 (Line 1)[1]
Operator(s) Nanchang Rail Transit Group Co., Ltd.
Technical
System length 28.7 km (28.7 km) (2015)
162 km (162 km) (planned)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
System map

Nanchang Rail Transit
Simplified Chinese 南昌轨道交通
Traditional Chinese 南昌軌道交通
Nanchang Metro
Simplified Chinese 南昌地铁
Traditional Chinese 南昌地鐵

Nanchang Metro (also known as Nanchang Rail Transit in official documents) is a metro system in Nanchang, Jiangxi, China. Two lines are currently under construction with the first scheduled to be operational in 2015.[1]

The network is expected to exceed 122.2 km in length in 2020 after Phase 2 is finished.[2] Additional complementary lines are also being considered.[3] Five lines are planned with a total length of 163 km of network[4] (excluding the extension of Line 1 & Line 2 planned in the Phase 2).

History

Origins

The construction of a rail transit system in Nanchang was first proposed in the beginning of the 2000s:[5] In August 2005, Jiangxi Provincial Development & Reform Commission and Nanchang City Government replied to the proposal of building a metro system, and the City Government considered listing the proposal in the Eleventh Five-year plan.[6] In November, a plan of 4 metro and 1 light rail was drafted.[7][8] In 2006, the City officially started the research of building a rail transit system.[9] In the second half of 2007, the prophase research of the construction of the system was initiated.[5] On 30 July 2008, the construction of Nanchang Metro was formally included in the priority agenda.[10]

Plans

Initial Plan

The Xinhua Bookstore by Bayi Square was detonated to make space for Nanchang Metro Line 1

In 2008, Nanchang was approved to build a rail transit system by the State Council,[11] and Nanchang Rail Transit Group Co., Ltd. was incorporated on 16 October 2008 to construct and operate Nanchang Metro.[12] On 15 September, the planned 5 routes were notified to the public,[4][13][14][15] which was approved by the State Council in July 2009.[16][17] On 29 July 2009, the construction of Nanchang City Rapid Rail Transit officially began,[18][19] and also on the same day the detailed route and construction plan of the five lines was proclaimed at the press conference.[20]

In April 2013, the Government planned to acquire approval for all 5 lines by 2014, start constructing all planned lines from 2015, and plan Line 6 to Line 10 to complement the existing network.[21][22]

Phase 2

On 31 May 2013, Nanchang Government submitted three candidate plans for the Phase 2 construction (2014-2020) to the expert panel,[23][24] which chose the compromising Plan 2.[25][26] According to the plan, Line 2 will be extended to both directions from 2014,Line 1 from 2016; the construction of Line 3 will start as soon as September 2014, and Line 4 will be constructed as soon as September 2015.[25][27]

Construction

Construction of Line 1 has started on 29 July 2009,[18] and the line is planned to be operational by Q4 2015. As of August 2013, the construction of Line 2 is also started.

Infrastructure

Lines

Planned network of Nanchang Metro
Name No. of Sta. Length (km) Route
Line 1 24[† 1][28] 28.7[† 1] Lehua—Jiaoqiao—Fenghe Bei Dadao—Fenghe 2 Lu—Shimao Lu—Zhongshan Xi Lu—Zhongshan Lu—Bayi Square—Beijing Lu—Yaohu Dadao
Line 2 21[† 1] 23.3[† 1] Jiulonghu—CR Nanchang West Railway Station—Xizhan Dajie—Guoti Dadao—Fenghe Dadao—Fenghuang 1 Lu—Yangming Lu—Bayi Dadao—Luoyang Lu—CR Nanchang Station—Shunwai Lu—Shanghai Lu—Guangzhou Lu—Luojia Town
Line 3 22 27.2 Yaohu North—Minfeng Lu—Danxia Lu—Qingshan Lu—Bayi Dadao—Dieshan Lu—Xiangshan Bei Lu—Xiangshan Nan Lu—Shenjinta Jie—Shizi Jie—Jingshan Bei Lu—Yingbin Dadao—Liantang
Line 4 25 35.2 Wangcheng—CR Nanchang West Station—Xizhan Dajie—Chaoyangzhou South—Fusheng Lu—Hongcheng Lu—Hongdu Dadao—Nanjing Dong Lu—Shanghai Lu—Guowei Lu—Huoju Dadao
Line 5 25 34 Xialuo—Changleng Dadao—Xuefu Dadao—Honggu Nan Dadao—Xuefu Dadao—Chaoyang Dadao—Jiangling Xi Lu—Gaoxin Dadao

Rolling Stock

Nanchang Metro planned to operate with Model-B rolling stock, whose cars are 2.8 m in width, 3.8 m in height and 3.8m in length, providing the system with maximum capacity of 30 000 to 55 000 passenger per hour per direction.[29]

Ticketing

Single ticket will be available as plastic packaged RFID coin like many other cities in China.[30] Existing pre-payment smart cards such as local Hongcheng Tong (Chinese: 洪城通) are also expected to used in Nanchang Metro.

Notes

  1. 1 2 3 4 The data of station numbers and length of Line 1 & Line 2 are only applicable to Phase I

References

Wikimedia Commons has media related to Nanchang Metro.
  1. 1 2 南昌地铁1号线推迟至2015年底通车 明确11个建设节点
  2. 黄培红 (2013-06-01). "南昌第二轮地铁建设规划94.1公里". 信息日报. Retrieved 2013-08-10.
  3. 袁思东 (2013-04-11). "南昌考虑再建五条地铁线 拟规划到十号线形成半小时经济圈". 信息日报. Retrieved 2013-08-10.
  4. 1 2 南昌地铁远景规划征询民意 将有5条地铁线路
  5. 1 2 南昌地铁建设备忘录--大江专题
  6. “南昌建地铁”提案获答复
  7. 南昌初步规划4条地铁 并将建设一条轻轨线
  8. 南昌4条地铁布局初定
  9. 南昌将启动轨道交通研究 红谷隧道工程设计年内完成
  10. 南昌地铁建设列入政府重要议程
  11. 审批权下放 南昌建地铁有望加速
  12. 南昌轨道交通有限公司 - 社会日常生活 - 百科全书 - 价值中国网
  13. 南昌市城市快速轨道交通线网及建设规划公众征询意见
  14. 南昌地铁远景规划征询民意(图)
  15. 南昌地铁公司挂牌 远景规划5条地铁线
  16. 国务院同意南昌建设地铁 1号线有望年内动工
  17. 南昌市城市轨道交通近期建设规划(2009-2016年)通过批准
  18. 1 2 南昌城市快速轨道交通工程开工奠基
  19. 地铁,一个城市梦想如花绽放(图)
  20. 南昌地铁线路站点公布 1号线2014年通车
  21. 南昌考虑再建五条地铁线 拟规划到十号线形成半小时经济圈
  22. 南昌市市长陈俊卿:2015年五条地铁全部开建
  23. 南昌未来7年有望建成3至4条地铁
  24. 专家把脉南昌地铁第二轮建设规划 三套方案备选
  25. 1 2 地铁3号线一期工程明年下半年或开工
  26. 信息日报. "南昌第二轮地铁建设规划94.1公里". 大江网. Retrieved 2013-08-10.
  27. 南昌地铁三四号线拟建19.7公里高架 1号线北延至昌北机场
  28. 南昌市轨道交通1号线一期工程可行性研究报告获批准
  29. 南昌地铁拟采用B型车 单向每小时载乘客5.5万人次
  30. 南昌地铁单程票采用筹码式车票
This article is issued from Wikipedia - version of the Wednesday, January 27, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.