Interstate 76 (Ohio–New Jersey)

For the Interstate 76 in Colorado and Nebraska, see Interstate 76 (Colorado–Nebraska). For the 1997 video game, see Interstate '76.

Interstate 76 marker

Interstate 76
Route information
Length: 434.87 mi[1] (699.86 km)
Existed: 1964[2] – present
Major junctions
West end: I-71 / US 224 near Westfield Center, OH
  I-77 in Akron, OH
I-80 near Youngstown, OH
I-79 in Cranberry, PA
I-70 in New Stanton, PA
I-99 in Bedford, PA
I-70 in Breezewood, PA
I-81 near Carlisle, PA
I-83 near Harrisburg, PA
I-95 in Philadelphia, PA
East end: I295 / Route 42 near Camden, NJ
Highway system
PA 75PAPA 76
Route 75NJRoute 76
Route 7676CRoute 77

Interstate 76 (I-76) is an Interstate Highway in the United States, running 435 miles (700 km) from an interchange with Interstate 71 west of Akron, Ohio, east to Interstate 295 in Bellmawr, New Jersey.

Just west of Youngstown, I-76 joins the Ohio Turnpike and heads around the south side of Youngstown. In Pennsylvania, I-76 runs across most of the state on the Pennsylvania Turnpike, passing near Pittsburgh and Harrisburg before leaving the Turnpike to enter Philadelphia on the Schuylkill Expressway, crossing the Walt Whitman Bridge into New Jersey. After Interstate 76 reaches its eastern terminus, the freeway continues as Route 42 and the Atlantic City Expressway to Atlantic City.

Route description

Lengths
  mikm
OH 82.12 132.16
PA 349.67 562.74
NJ 3.08 4.96
Total 434.87 699.86

Ohio

Main article: Interstate 76 in Ohio

Lodi to Youngstown

I-76 begins at Interstate 71 at exit 209, east of Lodi, Ohio; U.S. Route 224 continues west from the end of I-76. The interchange was previously a double trumpet, but was reconstructed in 2010.[3]) Officially, I-76 begins at the beginning of the ramp from I-71 north; it merges with US 224 at mile 0.61. After passing through rural Medina County, I-76 enters Summit County and soon crosses State Route 21 (old US 21), once the main northsouth route through the area until Interstate 77 replaced it, at a cloverleaf interchange. I-76 then passes Barberton and enters Akron; this section of road was built as US 224.

Soon after entering Akron, I-76 exits the main freeway, which continues east as Interstate 277, onto the short Kenmore Expressway; U.S. Route 224 leaves I-76 there and continues east as a surface road after I-277 ends at Interstate 77. Shortly after heading north from the I-277 interchange, I-76 meets I-77 and again turns east, joining southbound I-77 through downtown Akron on the West Expressway. A partial interchange provides access to State Route 59, the Innerbelt, and then I-76 crosses through the Central Interchange, where I-77 goes south (on the South Expressway) and State Route 8 begins to the north (on the North Expressway); I-76 switches from the West Expressway to the East Expressway.

The interchange with Interstate 80 west of Youngstown

Leaving the Akron area, I-76 again heads through rural areas, crossing Portage County and entering Mahoning County. West of Youngstown, the freeway crosses the Ohio Turnpike. Officially I-76 transfers to the Turnpike at the overpass, with a similar change happening with Interstate 80 (east on the freeway to Youngstown and west on the Turnpike). In reality, access between the roads is via a double trumpet connection in the northeast corner of the crossing, along which I-76 traffic and I-80 traffic run in opposite directions.

Youngstown area and east

Main article: Ohio Turnpike

The Ohio Turnpike carries I-76 starting from around Youngstown, Ohio until the Pennsylvania border.

Pennsylvania

Pennsylvania Turnpike

Westbound I-76 Pennsylvania Turnpike approaching the Pittsburgh exit 57 (I-376/US 22).
Main article: Pennsylvania Turnpike

From the Ohio border, the Pennsylvania Turnpike carries I-76 into and across most of Pennsylvania, bypassing Youngstown to the south and Pittsburgh to the north. From the Ohio border until Warrendale, the turnpike uses a non-ticketing toll system while east of Warrendale, the ticketing system begins. There is a free interchange with U.S. 19 and I-79 near Wexford. At one point, I-76 used to be routed through Pittsburgh on a route that is now signed as Interstate 376, around the 1970s.

I-76 at the Allegheny Mountain Tunnel

From New Stanton to Breezewood, I-76 is concurrent with I-70. In this section are the bypass (built in the 1960s) of the Laurel Hill Tunnel, then the still-in-use Allegheny Mountain Tunnel in a relatively unpopulated section of south central Pennsylvania, and then an indirect connection with I-99 in Bedford. The highway also passes through a wind farm in Somerset County[4] and is the closest interstate highway to the 9/11 Flight 93 National Memorial in Shanksville.

An abandoned portion of I-76 near mile marker 161 in Breezewood, Pennsylvania

At Breezewood, I-70 exits the turnpike (making use of a short stretch of the old alignment of the PA Turnpike), while I-76 bypasses the Rays Hill and Sideling Hill Tunnels along a new alignment built in the 1960s. The speed limit on the I-76 has been increased recently from 65 mph to 70 mph, from mile marker 201 to mile marker 298. I-76 also bypasses Harrisburg and Reading both to the south. The major features of this section are more mountains with the Tuscarora Mountain Tunnel and then a double tunnel (Kittatinny/Blue Mountain) prior to PA 75 near Shippensburg. I-76 intersects I-81 in Carlisle, Pennsylvania, then I-83 and I-283 near Harrisburg. At Valley Forge, I-76 diverges towards Philadelphia, but the turnpike (as I-276) bypasses it to the north. The Susquehanna River Bridge is a new six lane bridge that was constructed in 2003 using precast segments that replaced an older bridge across the Susquehanna River.[5]

Schuylkill Expressway

At Valley Forge, northwest of Philadelphia, I-76 leaves the Turnpike to run into Philadelphia on the Schuylkill Expressway (while the Turnpike continues east as Interstate 276). Immediately after exiting the Turnpike, I-76 interchanges with the U.S. Route 202 and U.S. Route 422 freeways near King Of Prussia, crosses Interstate 476 near Conshohocken, and begins running along the southwest shore of the Schuylkill River. I-76 then enters the city/county limits of Philadelphia where Interchanges provide access to the Roosevelt Expressway (U.S. Route 1) and Vine Street Expressway (Interstate 676); the latter runs through downtown Philadelphia while I-76 bypasses to the south.

The last interchange before the Walt Whitman Bridge over the Delaware River into New Jersey is with Interstate 95. Some of the ramps involve traffic signals, as the ramps to I-95 were retrofitted into an existing interchange when I-95 was built, and the toll booth for the bridge lies west of the crossing of the two roads.

New Jersey

Walt Whitman Bridge

Just after crossing the Delaware River on the Walt Whitman Bridge, I-76 turns south and becomes the North-South Freeway, which carries Interstate 676 north to downtown Camden; the unsigned Route 76C connector runs east to U.S. Route 130 and Route 168. The exit numbers in New Jersey are backwards, running from east to west. Though signed eastbound towards Atlantic City, the route ends near Gloucester City in western Camden County at an interchange with Interstate 295.

Eastbound I-76 past exit for southbound US 130 in Gloucester City, New Jersey.

From the I-676 interchange to the end, I-76 originally had local and express lanes in both directions, but the eastbound barrier has since been removed, and now the separation is westbound only; however, the westbound barrier might also be removed in the future due to plans to rebuild the I-295, I-76, and Route 42 interchange. I-76 ends at an interchange with Interstate 295 on the Mount Ephraim/Bellmawr town line, where the local/express split begins heading westbound. The road becomes Route 42, continuing south on the North-South Freeway and then feeding into the Atlantic City Expressway to Atlantic City. While the South Jersey Transportation Authority (which owns the ACE) is not against the idea of making Route 42 (expressway part) and the ACE an eastern extension of I-76, they feel that making the change without a compelling reason would only add to motorists' confusion in southern New Jersey.

History

The majority of I-76, along the Pennsylvania Turnpike, includes the first long-distance rural freeway in the U.S.; the Ohio Turnpike and Schuylkill Expressway are also pre-Interstate freeways. By 1955, the section of that route from west of Youngstown to downtown Philadelphia was included in the planned Interstate Highway System, as was present I-76 from west of Youngstown to Akron. (Some early plans called for a new freeway along State Route 14 to the Pennsylvania state line; it is unclear when the proposed route was shifted to the Turnpikes.)

In 1957 the route from Cleveland east to Harrisburg, running roughly along the State Route 14 corridor in Ohio and the Turnpike in Pennsylvania, was labeled Interstate 80, and the rest of the route from Harrisburg to Philadelphia was assigned Interstate 80S. (Interstate 80N would have run from Harrisburg to New York City.) Interstate 78 was assigned to a route from Norwalk, Ohio, paralleling State Route 18 through Akron to Youngstown, and turning south there to end at the planned I-80.

Current and once-planned Interstates near Cleveland; I-80 would have run via Akron, using what is now I-76 east of Akron.

However, the 1957 numbering was drawn on a map from 1947, which did not include several changes that had been approved, specifically the Keystone Shortway across Pennsylvania. (The route in that corridor ran further north, along U.S. Route 6, and was numbered Interstate 84.) Thus, the final numbering, approved in 1958, assigned I-80 to the Norwalk-Youngstown route to reach the Keystone Shortway. The former alignment through Cleveland became Interstate 80N; the Turnpike was still not assigned a number from near Elyria (where I-80N and I-90 would split from it) to west of Youngstown. The route from west of Youngstown to Philadelphia was assigned Interstate 80S, and extended east to I-295 in New Jersey when the three-digit Interstates were assigned in 1959. (The planned I-80N in Pennsylvania became I-78.) Initial spurs of I-80S were I-180 (now I-176), I-280 (now I-276), I-480 (now I-476) and I-680 (now I-676, though it swapped with I-76 in 1972).

I-80 was realigned in Ohio by 1962, largely taking over former I-80N, which ran through Cleveland, joining the Turnpike southwest of Cleveland. However, while I-80N was planned to split from I-80 near Kent and run northwest to Cleveland along State Route 14, the new alignment of I-80 used the Turnpike between the crossing west of Youngstown and the crossing with State Route 14 at Streetsboro. The former I-80 from near Youngstown west to Akron became part of I-80S, as did a new alignment (already built as U.S. Route 224) from Akron west to I-71 east of Lodi; the rest of proposed I-80 west to near Norwalk (which would have crossed I-71 near Medina) was removed from the Interstate Highway System. Ca. 1971, I-80 was moved to the Turnpike between Streetsboro and southwest of Cleveland; the old route became I-480.

"To Turnpike 76" sign in Pennsylvania

On April 16, 1963, due in part to the extension of I-79 south from the Pittsburgh area, Pennsylvania proposed a partial renumbering. A new number, tentatively designated I-76, would run from downtown Pittsburgh east on what was then I-70 (I-70S bypassed Pittsburgh to the south on what is now I-70) to the Pennsylvania Turnpike at Monroeville, and then east along the remainder of I-80S to I-295. I-80S would remain on the section of turnpikes from west of Youngstown to Monroeville. This was approved February 26, 1964, and included the renumbering of all X80 spurs to X76.

On June 29, 1970, a renumbering was approved in the Pittsburgh area, with the main effect being rerouting I-79 to bypass Pittsburgh to the west on the former I-279. I-279 was moved to the former I-79 north of downtown, and the former I-79 from downtown southwest to new I-79 became a western extension of I-76. (It was then that I-876 was designated for former I-479.) A realignment and extension of I-76 into Ohio, taking over the rest of I-80S to I-71 east of Lodi, was approved January 11, 1972. The former I-76 from Monroeville west into downtown Pittsburgh became I-376, and I-279 was extended southwest from downtown along former I-76 to I-79. (I-876 was renumbered to I-579 then.) Signs in Ohio were changed September 1, 1972; the old I-80S signs remained for about a year.

On August 29, 1972, a swap of I-76 and I-676 in Philadelphia and Camden was approved. I-76 had been routed along the Vine Street Expressway and Ben Franklin Bridge (now I-676) through Center City Philadelphia, while I-676 used the Schuylkill Expressway and Walt Whitman Bridge to bypass downtown to the south. The switch was made because of delays in building the Vine Street Expressway, better interchange geometry at the splits, and that the Ben Franklin Bridge ends in city streets, rather than in expressway grade.

The renumbering of a Philadelphia Interstate to 76 in the years leading up to the Bicentennial Celebration of the 1776 signing in Philadelphia of the Declaration of Independence gives rise to the question of the highway number being an intentional tribute to the Spirit of '76. USDoT research into federal documentation of the I-76 renumbering found no evidence of this being intentional.[6]

Exit list

Ohio and Pennsylvania

In Ohio and Pennsylvania, the routes are composed mostly of turnpikes with the exceptions in east-central Ohio and eastern Pennsylvania. The exit numbers on the turnpike portions in Ohio follow the mileage markers for the Ohio Turnpike.

New Jersey

CountyLocationmi[7]kmExitDestinationsNotes
PhiladelphiaPhiladelphia3.084.96 I-76 west (Schuylkill Expressway) PhiladelphiaPennsylvania state line
Delaware River3.084.96Walt Whitman Bridge
CamdenCamden2.33.7354 US 130 north / Route 168 / I676 Camden, GloucesterEastbound exit and westbound entrance; connection to US 130 is NJ 76C; signed with PA exit number
2.213.562 I676 north Camden, Ben Franklin BridgeWestbound exit and eastbound entrance
Gloucester City1.151.851D US 130 north CollingswoodWestbound exit and eastbound entrance
1C US 130 south Brooklawn, WestvilleEastbound exit and westbound entrance
0.761.221C US 130 south to I295 / Route 42 Mount Ephraim, Gloucester CityWestbound exit and eastbound entrance (provides a U-turn for nonexistent movements at the I-295 interchange)
Mount Ephraim0.130.211B I295 north to N.J. Turnpike Trenton
Bellmawr0.000.001A I295 south Delaware Memorial BridgeEastbound exit and westbound entrance
Route 42 south Atlantic CityContinuation beyond I-295
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Auxiliary routes

See also

References

  1. ^ Gregory Pietsch, More I-76 and Atlantic City Expressway, misc.transport.road June 10, 2002 (message ID: zc9N8.56$b22.28752931@newssvr15.news.prodigy.com )

External links

Route map: Bing / Google

Wikimedia Commons has media related to Interstate 76 (OhioNew Jersey).
This article is issued from Wikipedia - version of the Friday, February 05, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.