Mont Blanc Tunnel

Mont Blanc Tunnel
Mont Blanc Tunnel
Location in the western Alps of Europe
Overview
Location Europe: western Alps
Coordinates 45°51′14″N 6°54′50″E / 45.854°N 6.914°E / 45.854; 6.914Coordinates: 45°51′14″N 6°54′50″E / 45.854°N 6.914°E / 45.854; 6.914
Status Open 24 hrs/day
Route RN205
Traforo T1
European route E25
Start Chamonix, Haute-Savoie, France
End Courmayeur, Aosta Valley, Italy
Operation
Work begun May 1959 (1946)
Opened 19 July 1965
Operator MBT-EEIG, controlled
by both ATMB and SITMB
Traffic Automotive
Character Passenger & freight
Toll 41 (one-way), 2013
passenger vehicle
over €300 (one-way),
three or more axles
Technical
Construction 19591965 (1946)
Length 11.611 km (7.215 mi)
Number of lanes 2
Operating speed 50–70 km/h (31–43 mph)
Highest elevation 1,395 m (4,577 ft)
center
Lowest elevation 1,274 m (4,180 ft)
France (NW)
Tunnel clearance 4.35 m (14.3 ft)
Width 8.6 m (28 ft)
Mont Blanc Tunnel in Italy
Mont Blanc Tunnel in France
Mont Blanc Tunnel in 2008

The Mont Blanc Tunnel is a highway tunnel in Europe, under the Mont Blanc mountain in the Alps. It links Chamonix, Haute-Savoie, France with Courmayeur, Aosta Valley, Italy, via European route E25. The passageway is one of the major trans-Alpine transport routes, particularly for Italy, which relies on the tunnel for transporting as much as one-third of its freight to northern Europe. It reduces the route from France to Turin by 50 kilometres (30 miles) and to Milan by 100 km (60 mi). Northeast of Mont Blanc's summit, the tunnel is about 15 km (10 mi) southwest of the tripoint with Switzerland, near Mont Dolent.

Begun in 1957 and completed in 1965, the tunnel is 11.611 km (7.215 mi) in length, 8.6 m (28 ft) in width, and 4.35 m (14.3 ft) in height. The passageway is not horizontal, but in a slightly inverted "V", which assists ventilation. The entrance elevation on the French side (45°54′05″N 006°51′39″E / 45.90139°N 6.86083°E / 45.90139; 6.86083) is 1,274 m (4,180 ft) and 1,381 m (4,531 ft) in Italy (45°49′04″N 006°57′07″E / 45.81778°N 6.95194°E / 45.81778; 6.95194), with a maximum of 1,395 m (4,577 ft) near the center, a maximum difference of 121 m (397 ft). The tunnel consists of a single gallery with a two-lane dual direction road. At the time of its construction, it tripled the length of any existing highway tunnel.[1]

The tunnel passes almost exactly under the summit of the Aiguille du Midi. At this spot, it lies 2480m beneath the surface, making it the world's deepest operational tunnel.[2] The Gotthard Base Tunnel will be slightly deeper when it opens to traffic in 2016.

Plans to widen the tunnel were never implemented because of lack of financing and fierce opposition of local residents who objected to the harmful effects of increased heavy traffic.

The Mont Blanc Tunnel was originally managed by two public companies, each managing half of the tunnel:

After the 1999 fire, which showed how lack of coordination could hamper the safety of the tunnel, all the operations are managed by a single entity: MBT-EEIG, controlled by both ATMB and SITMB together, through a 50–50 shares distribution.[4]

Construction statistics

History until 1999

Inaugural Plaque, French side
Traffic Statistics - Mont Blanc and Fréjus road tunnels

An alternative route for road traffic between France to Italy is the Fréjus Road Tunnel. Road traffic grew steadily until 1994, even with the opening of the Fréjus tunnel. Since then, the combined traffic volume of the former has remained roughly constant.

The 1999 fire

A commemorative plaque on the French side of the tunnel, remembering those who were killed in the fire.

On the morning of 24 March 1999, 38 people died[6] when a Belgian transport truck carrying flour and margarine caught fire in the tunnel.[3] After several kilometres, the driver realized something was wrong as cars coming in the opposite direction flashed their headlights at him; a glance in his mirrors showed white smoke coming out from under his cabin. This was not yet a fire emergency; there had been 16 other truck fires in the tunnel over the previous 35 years, always extinguished on the spot by the drivers.

At 10:53 CET, the driver of the vehicle, Gilbert Degrave, stopped in the middle of the tunnel to attempt to fight the fire but he was suddenly forced back by flames from his cabin.[3]

At 10:55, the tunnel employees triggered the fire alarm and stopped any further traffic from entering. At this point there were at least 10 cars/vans and 18 trucks in the tunnel that had entered from the French side. A few vehicles from the Italian side passed the Volvo truck without stopping. Some of the cars from the French side managed to turn around in the narrow two-lane tunnel to retreat back to France, but negotiating the road in the dense smoke that had rapidly filled the tunnel quickly made this impossible. The larger trucks did not have the space to turn around, and reversing out was not an option.

Most drivers rolled up their windows and waited for rescue. The ventilation system in the tunnel drove toxic smoke back down the tunnel faster than anyone could run to safety. These fumes quickly filled the tunnel and caused vehicle engines to stall because of lack of oxygen. This included fire engines which, once affected, had to be abandoned by the firefighters. Many drivers near the blaze who attempted to leave their cars and seek refuge points were quickly overcome.

Within minutes, two fire trucks from Chamonix responded to the unfolding disaster. The fire had melted the wiring and plunged the tunnel into darkness; in the smoke and with abandoned and wrecked vehicles blocking their path, the fire engines were unable to proceed. The fire crews instead abandoned their vehicles and took refuge in two of the emergency fire cubicles (fire-door sealed small rooms set into the walls every 600 metres). As they huddled behind the fire doors, they could hear burning fuel roll down the road surface, causing tires to pop and fuel tanks to explode. They were rescued five hours later from a third fire crew that responded and reached them via a ventilation duct; of the 15 firefighters that had been trapped, 14 were in serious condition and one (their commanding officer) died in the hospital.

Some victims escaped to the fire cubicles. The original fire doors on the cubicles were rated to survive for two hours. Some had been upgraded in the 34 years since the tunnel was built to survive for four hours. The fire burned for 53 hours and reached temperatures of 1,000 °C (1,830 °F), mainly because of the margarine load in the trailer, equivalent to a 23,000-litre (5,100 imp gal; 6,100 US gal) oil tanker, which spread to other cargo vehicles nearby that also carried combustible loads. The fire trapped around 40 vehicles in dense and poisonous smoke (containing carbon monoxide and cyanide). Due to weather conditions at the time, airflow through the tunnel was from the Italian side to the French side.[7] Authorities compounded the effect by pumping in further fresh air from the Italian side, feeding the fire and forcing poisonous black smoke through the length of the tunnel. Only vehicles below the fire on the French side of the tunnel were trapped, while cars on the Italian side of the fire were mostly unaffected. There were 27 deaths in vehicles, and 10 more died trying to escape on foot. Of the initial 50 people trapped by the fire, 12 survived.[3] It was more than five days before the tunnel cooled sufficiently to start repairs.

Pierlucio Tinazzi

Main article: Pierlucio Tinazzi

Pierlucio Tinazzi, an Italian security guard employed by the SITMB, is credited with saving at least 10 of the 12 survivors.[3] Tinazzi died while helping victims out of the fire. He was on the French side at the time emergency services had given up. He donned breathing equipment and drove into the tunnel on his BMW K75 motorcycle. He was in radio contact with the Italian side for over an hour before succumbing to the intense heat. His motorcycle melted into the pavement after he dragged an unconscious truck driver behind a fire door. A commemorative plaque at the Italian entrance honours him.[8]

Aftermath

Thermographic inspection station on the Italian side

The tunnel underwent major changes in the three years it remained closed after the fire.[9] Renovations include computerised detection equipment, extra security bays, a parallel escape shaft and a fire station in the middle of the tunnel complete with double cabbed fire trucks. The safety shafts also have clean air flowing through them via vents. Any people in the security bays now have video contact with the control centre, so they can communicate with the people trapped inside and inform them about what is happening in the tunnel more clearly.

A remote site for cargo safety inspection was created on each side: Aosta (I) and Passy-Le Fayet (F). Here all trucks are inspected well before the tunnel entrance. The same areas are also used as staging areas, to smooth the peaks of commercial traffic.

The experience gained from the investigation into the fire was one of the principal factors that led to the creation of the French Land Transport Accident Investigation Bureau (Bureau d'Enquêtes sur les Accidents de Transport Terrestre).[10]

TV documentaries were also made concerning the disaster, all distributed worldwide and focussing on either safety aspects or the circumstances that turned what should have been a serious, but controllable incident into a disaster. The first, Seconds from Disaster – Tunnel Inferno (aired 2004), was a reconstruction of the events leading up to and during the disaster and the conclusions of the investigation that followed. The second, Into the Flames – Fire Underground (aired 2006), revisited the circumstances and showed how new technology in the form of a new type of fire extinguisher could have reduced the scale of the disaster and enabled the fire service to reach and remain in the vicinity to fight the fire.

Manslaughter trial

In Grenoble, France, 16 people and companies were tried on 31 January 2005 for manslaughter. Defendants in the trial included:

The cause of the fire is disputed. Different accounts report it to be a cigarette stub carelessly thrown at the truck, and it supposedly entered the engine induction snorkel above the cabin, setting the paper air filter on fire, a mechanical or electrical fault, or poor maintenance of the truck's engine. The closest smoke detector was out of order and French emergency services did not use the same radio frequency as those inside the tunnel. The Italian company responsible for operating the tunnel, SITMB, paid €13.5 million ($17.5 million US) to a fund for the families of the victims. Édouard Balladur, former president of the French company operating the tunnel (from 1968 to 1980), then later Prime Minister of France, underwent a witnesses examination. He was asked about the security measures that he ordered to or did not order to. Balladur claimed that the catastrophe could be deduced to the fact the tunnel had been divided into two sections operated by two companies (one in France, the other in Italy), who failed to coordinate the situation. On 27 July 2005, thirteen defendants were found guilty, and handed sentences ranging from fines to suspended prison sentences, to 6 months in jail.

See also

References

External links

Wikimedia Commons has media related to Mont Blanc Tunnel.
Records
Preceded by
Great St Bernard Tunnel
5.80 km (3.60 mi)
World's longest road tunnel
1965–1978
Succeeded by
Arlberg Road Tunnel
13.98 km (8.69 mi)
This article is issued from Wikipedia - version of the Thursday, February 04, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.