Mont Blanc Tunnel
Mont Blanc Tunnel | |
Overview | |
---|---|
Location | Europe: western Alps |
Coordinates | 45°51′14″N 6°54′50″E / 45.854°N 6.914°ECoordinates: 45°51′14″N 6°54′50″E / 45.854°N 6.914°E |
Status | Open 24 hrs/day |
Route |
RN205 Traforo T1 European route E25 |
Start | Chamonix, Haute-Savoie, France |
End | Courmayeur, Aosta Valley, Italy |
Operation | |
Work begun | May 1959 (1946) |
Opened | 19 July 1965 |
Operator |
MBT-EEIG, controlled by both ATMB and SITMB |
Traffic | Automotive |
Character | Passenger & freight |
Toll |
€41 (one-way), 2013 passenger vehicle over €300 (one-way), three or more axles |
Technical | |
Construction | 1959–1965 (1946) |
Length | 11.611 km (7.215 mi) |
Number of lanes | 2 |
Operating speed | 50–70 km/h (31–43 mph) |
Highest elevation |
1,395 m (4,577 ft) center |
Lowest elevation |
1,274 m (4,180 ft) France (NW) |
Tunnel clearance | 4.35 m (14.3 ft) |
Width | 8.6 m (28 ft) |
The Mont Blanc Tunnel is a highway tunnel in Europe, under the Mont Blanc mountain in the Alps. It links Chamonix, Haute-Savoie, France with Courmayeur, Aosta Valley, Italy, via European route E25. The passageway is one of the major trans-Alpine transport routes, particularly for Italy, which relies on the tunnel for transporting as much as one-third of its freight to northern Europe. It reduces the route from France to Turin by 50 kilometres (30 miles) and to Milan by 100 km (60 mi). Northeast of Mont Blanc's summit, the tunnel is about 15 km (10 mi) southwest of the tripoint with Switzerland, near Mont Dolent.
Begun in 1957 and completed in 1965, the tunnel is 11.611 km (7.215 mi) in length, 8.6 m (28 ft) in width, and 4.35 m (14.3 ft) in height. The passageway is not horizontal, but in a slightly inverted "V", which assists ventilation. The entrance elevation on the French side (45°54′05″N 006°51′39″E / 45.90139°N 6.86083°E) is 1,274 m (4,180 ft) and 1,381 m (4,531 ft) in Italy (45°49′04″N 006°57′07″E / 45.81778°N 6.95194°E), with a maximum of 1,395 m (4,577 ft) near the center, a maximum difference of 121 m (397 ft). The tunnel consists of a single gallery with a two-lane dual direction road. At the time of its construction, it tripled the length of any existing highway tunnel.[1]
The tunnel passes almost exactly under the summit of the Aiguille du Midi. At this spot, it lies 2480m beneath the surface, making it the world's deepest operational tunnel.[2] The Gotthard Base Tunnel will be slightly deeper when it opens to traffic in 2016.
Plans to widen the tunnel were never implemented because of lack of financing and fierce opposition of local residents who objected to the harmful effects of increased heavy traffic.
The Mont Blanc Tunnel was originally managed by two public companies, each managing half of the tunnel:
- French side: ATMB (Autoroutes et tunnels du Mont-Blanc),[3] founded 30 April 1958
- Italian side: SITMB (Società italiana per azioni per il Traforo del Monte Bianco),[3] founded 1 September 1957
After the 1999 fire, which showed how lack of coordination could hamper the safety of the tunnel, all the operations are managed by a single entity: MBT-EEIG, controlled by both ATMB and SITMB together, through a 50–50 shares distribution.[4]
Construction statistics
- Workforce: five engineers and 350 workmen worked an estimated grand total of 4.6 million man-hours to complete the project
- Explosives: 711 tonnes (700 long tons; 784 short tons) of explosives were used to blast 555,000 m3 (19,600,000 cu ft) of rock
- Energy: 37 million kiloWatt-hour and 2,700,000 litres (590,000 imp gal; 710,000 US gal) of fuel for trucks and engines
- Other facts: 771,240 bolts, 6,900 drill rods, and 300 tonnes (300 long tons; 330 short tons) of iron were used to support the vault, 5,000 m3 (180,000 cu ft) of formwork for 60,000 tonnes (59,000 long tons; 66,000 short tons) of cement (mixed with 280,000 m3 (9,900,000 cu ft) of aggregates)
History until 1999
- 1946: A hundred metres (330 ft) are drilled on the Italian side, marking the project start.
- 1947: Franco-Italian Agreement signed for the planning of a tunnel under Mont Blanc.
- 1953: Signature of a national charter for the tunnel construction, ratified by the parliaments of France (in 1954, by 544 votes against 32) and Italy (in 1957).
- 1957: Formation of the STMB (Société du tunnel du Mont Blanc), which became ATMB (Autoroutes et Tunnel du Mont Blanc) in 1996.
- 1959: In May, the French and Italian Public Works Ministers officially launch the drilling work. On 30 May in Chamonix, a ceremony is held for the start of the drilling work for the Mont Blanc Tunnel in the presence of the Public Minister for Labour. It is announced that a giant 75-tonne (74-long-ton; 83-short-ton) tunnel boring machine will make it possible to bore the tunnel in less than 30 months.
- 1962: Meeting of the French and Italian drilling teams on 4 August. The opening was successful, the axis variation was less than 13 centimetres (5 inches).
- 1965: Inauguration of the tunnel by the French president, Charles de Gaulle, and the Italian President, Giuseppe Saragat on 16 July. Tunnel opens to traffic on 19 July.
- 1973: Opening of the first section of the Autoroute Blanche.
- 1978: A network of surveillance cameras is installed every 300 m (980 ft) and the total capacity of fresh air supply is increased to 900 m3/s (32,000 cu ft/s).
- 1980: An additional air shaft, 7 m (23 ft) in diameter, is built to avoid the build-up of foul air at the French end of the tunnel.
- 1990: Part of a multi-year modernization plan, the following work is done:
- The installation of third generation video surveillance cameras with fibre-optic data transmission.
- The construction of 18 pressurized emergency shelters, every 600 m (2,000 ft), and safety recesses every 100 m (330 ft).
- The installation of a pressurized sprinkler system .
- The replacement of safety features: phone terminals, fire extinguishers, power generators.
- 1997: The start of a fire detection system and the start of a study for automatic incident detection, centralized safety equipment management, and new variable message signs.[5]
An alternative route for road traffic between France to Italy is the Fréjus Road Tunnel. Road traffic grew steadily until 1994, even with the opening of the Fréjus tunnel. Since then, the combined traffic volume of the former has remained roughly constant.
The 1999 fire
On the morning of 24 March 1999, 38 people died[6] when a Belgian transport truck carrying flour and margarine caught fire in the tunnel.[3] After several kilometres, the driver realized something was wrong as cars coming in the opposite direction flashed their headlights at him; a glance in his mirrors showed white smoke coming out from under his cabin. This was not yet a fire emergency; there had been 16 other truck fires in the tunnel over the previous 35 years, always extinguished on the spot by the drivers.
At 10:53 CET, the driver of the vehicle, Gilbert Degrave, stopped in the middle of the tunnel to attempt to fight the fire but he was suddenly forced back by flames from his cabin.[3]
At 10:55, the tunnel employees triggered the fire alarm and stopped any further traffic from entering. At this point there were at least 10 cars/vans and 18 trucks in the tunnel that had entered from the French side. A few vehicles from the Italian side passed the Volvo truck without stopping. Some of the cars from the French side managed to turn around in the narrow two-lane tunnel to retreat back to France, but negotiating the road in the dense smoke that had rapidly filled the tunnel quickly made this impossible. The larger trucks did not have the space to turn around, and reversing out was not an option.
Most drivers rolled up their windows and waited for rescue. The ventilation system in the tunnel drove toxic smoke back down the tunnel faster than anyone could run to safety. These fumes quickly filled the tunnel and caused vehicle engines to stall because of lack of oxygen. This included fire engines which, once affected, had to be abandoned by the firefighters. Many drivers near the blaze who attempted to leave their cars and seek refuge points were quickly overcome.
Within minutes, two fire trucks from Chamonix responded to the unfolding disaster. The fire had melted the wiring and plunged the tunnel into darkness; in the smoke and with abandoned and wrecked vehicles blocking their path, the fire engines were unable to proceed. The fire crews instead abandoned their vehicles and took refuge in two of the emergency fire cubicles (fire-door sealed small rooms set into the walls every 600 metres). As they huddled behind the fire doors, they could hear burning fuel roll down the road surface, causing tires to pop and fuel tanks to explode. They were rescued five hours later from a third fire crew that responded and reached them via a ventilation duct; of the 15 firefighters that had been trapped, 14 were in serious condition and one (their commanding officer) died in the hospital.
Some victims escaped to the fire cubicles. The original fire doors on the cubicles were rated to survive for two hours. Some had been upgraded in the 34 years since the tunnel was built to survive for four hours. The fire burned for 53 hours and reached temperatures of 1,000 °C (1,830 °F), mainly because of the margarine load in the trailer, equivalent to a 23,000-litre (5,100 imp gal; 6,100 US gal) oil tanker, which spread to other cargo vehicles nearby that also carried combustible loads. The fire trapped around 40 vehicles in dense and poisonous smoke (containing carbon monoxide and cyanide). Due to weather conditions at the time, airflow through the tunnel was from the Italian side to the French side.[7] Authorities compounded the effect by pumping in further fresh air from the Italian side, feeding the fire and forcing poisonous black smoke through the length of the tunnel. Only vehicles below the fire on the French side of the tunnel were trapped, while cars on the Italian side of the fire were mostly unaffected. There were 27 deaths in vehicles, and 10 more died trying to escape on foot. Of the initial 50 people trapped by the fire, 12 survived.[3] It was more than five days before the tunnel cooled sufficiently to start repairs.
Pierlucio Tinazzi
Pierlucio Tinazzi, an Italian security guard employed by the SITMB, is credited with saving at least 10 of the 12 survivors.[3] Tinazzi died while helping victims out of the fire. He was on the French side at the time emergency services had given up. He donned breathing equipment and drove into the tunnel on his BMW K75 motorcycle. He was in radio contact with the Italian side for over an hour before succumbing to the intense heat. His motorcycle melted into the pavement after he dragged an unconscious truck driver behind a fire door. A commemorative plaque at the Italian entrance honours him.[8]
Aftermath
The tunnel underwent major changes in the three years it remained closed after the fire.[9] Renovations include computerised detection equipment, extra security bays, a parallel escape shaft and a fire station in the middle of the tunnel complete with double cabbed fire trucks. The safety shafts also have clean air flowing through them via vents. Any people in the security bays now have video contact with the control centre, so they can communicate with the people trapped inside and inform them about what is happening in the tunnel more clearly.
A remote site for cargo safety inspection was created on each side: Aosta (I) and Passy-Le Fayet (F). Here all trucks are inspected well before the tunnel entrance. The same areas are also used as staging areas, to smooth the peaks of commercial traffic.
The experience gained from the investigation into the fire was one of the principal factors that led to the creation of the French Land Transport Accident Investigation Bureau (Bureau d'Enquêtes sur les Accidents de Transport Terrestre).[10]
TV documentaries were also made concerning the disaster, all distributed worldwide and focussing on either safety aspects or the circumstances that turned what should have been a serious, but controllable incident into a disaster. The first, Seconds from Disaster – Tunnel Inferno (aired 2004), was a reconstruction of the events leading up to and during the disaster and the conclusions of the investigation that followed. The second, Into the Flames – Fire Underground (aired 2006), revisited the circumstances and showed how new technology in the form of a new type of fire extinguisher could have reduced the scale of the disaster and enabled the fire service to reach and remain in the vicinity to fight the fire.
Manslaughter trial
In Grenoble, France, 16 people and companies were tried on 31 January 2005 for manslaughter. Defendants in the trial included:
- Gilbert Degrave, the Belgian driver of the truck that caused the fire
- Volvo, the truck's manufacturer
- French and Italian managers of the tunnel
- ATMB and SITMB
- Safety regulators
- Mayor of Chamonix
- A senior official of the French Ministry of Public Works
The cause of the fire is disputed. Different accounts report it to be a cigarette stub carelessly thrown at the truck, and it supposedly entered the engine induction snorkel above the cabin, setting the paper air filter on fire, a mechanical or electrical fault, or poor maintenance of the truck's engine. The closest smoke detector was out of order and French emergency services did not use the same radio frequency as those inside the tunnel. The Italian company responsible for operating the tunnel, SITMB, paid €13.5 million ($17.5 million US) to a fund for the families of the victims. Édouard Balladur, former president of the French company operating the tunnel (from 1968 to 1980), then later Prime Minister of France, underwent a witnesses examination. He was asked about the security measures that he ordered to or did not order to. Balladur claimed that the catastrophe could be deduced to the fact the tunnel had been divided into two sections operated by two companies (one in France, the other in Italy), who failed to coordinate the situation. On 27 July 2005, thirteen defendants were found guilty, and handed sentences ranging from fines to suspended prison sentences, to 6 months in jail.
- Gérard Roncoli, the head of security at the tunnel, was convicted to a six-month jail term plus an additional two-year suspended sentence, the heaviest sentence levied against any of the defendants. Sentence upheld on appeal.[11]
- Remy Chardon, former president of the French company operating the tunnel, was convicted a two-year suspended jail term and a fine of approximately US$18,000.
- Gilbert Degrave, the driver of the truck, received a four-month suspended sentence.
- Seven other people, including the tunnel's Italian security chief, were handed suspended terms and fines. Three companies were fined up to US$180,000 each. The prosecutor dropped the charges against Volvo.
See also
References
- ↑ Soule, Gardner (December 1959). "World's longest auto tunnel to pierce the Alps". Popular Science. pp. 121–123/236–238.
- ↑ "Today in Science History". Retrieved November 22, 2014.
- 1 2 3 4 5 6 "July 16, 1965: Mont Blanc Tunnel Opens". Wired. 15 July 2010. Retrieved 16 July 2010.
- ↑ http://www.atmb.com/atmb/en/tunnel/100/the-mont-blanc-tunnel/the-tunnel-today/a-french-italian-operator.html
- ↑ "History of the Tunnel". Autoroutes et Tunnel du Mont Blanc. Retrieved December 20, 2013.
- ↑ http://www.atmb.com/atmb/en/tunnel/25/the-mont-blanc-tunnel/the-history-of-the-tunnel/the-fire-of-1999.html
- ↑ "Case Studies: Historical Fires: Mont Blanc Tunnel Fire, Italy/France". University of Manchester.
- ↑ "Pierlucio Tinazzi". Find a Grave. Retrieved 8 January 2010.
- ↑ Bailey, Colin. "Infrastructural Fires: Mont Blanc Tunnel, Italy". www.mace.manchester.ac.uk. Retrieved 3 February 2016.
- ↑ "Land transport accident investigation bureau (BEA-TT)". French Land Transport Accident Investigation Bureau. Retrieved 24 July 2009.
- ↑ http://www.lemonde.fr/societe/article/2007/06/14/proces-du-mont-blanc-gerard-roncoli-condamne-en-appel-a-6-mois-de-prison-ferme_923593_3224.html
External links
Wikimedia Commons has media related to Mont Blanc Tunnel. |
- Official website
- "Traffic Tunnel to Pierce Mt Blanc." Popular Mechanics, April 1952, pp. 92–96. Detailed drawings of planned tunnel construction
- ATMB, Official Company Website
- ATMB, Official Company Website (French)
- ATMB, Official Company Website (Italian)
- Mont-Blanc Tunnel at Structurae
- Chamonix-Mont-Blanc Map
- BBC story on fire trial
Records | ||
---|---|---|
Preceded by Great St Bernard Tunnel 5.80 km (3.60 mi) |
World's longest road tunnel 1965–1978 |
Succeeded by Arlberg Road Tunnel 13.98 km (8.69 mi) |
|