Solar power in the United Arab Emirates

Solar potential in the UAE

Solar power in the UAE (United Arab Emirates) has the potential to provide most of the country's electricity demand. While being a major oil producing country, the United Arab Emirates (UAE) has taken steps to introduce solar power on a large scale. The UAE was the 6th top carbon dioxide emitter per capita in the world in 2009: 40.31 tonnes per capita.[1] The UAE is planning to generate the vast majority of its electrical energy by 2050 from solar and nuclear sources.

Abu Dhabi

In 2013, the Shams solar power station, a 100-megawatt (MW) concentrated solar power (CSP) plant near Abu Dhabi became operational. The US$600 million Shams 1 is the largest CSP plant outside the United States and Spain and is expected to be followed by two more stations, Shams 2 and Shams 3.[2]

Masdar City in Abu Dhabi is designed to be the most environmentally sustainable city in the world. The city relies entirely on renewable energy. Power is generated by a 10 MW solar PV power plant located on site and 1 MW of rooftop solar panels. Originally planned to have all rooftop panels, it was found easier to clean the sand off ground mounted panels at a single location.[3]

Dubai

The Dubai Clean Energy Strategy aims to provide 7 per cent of Dubai’s energy from clean energy sources by 2020. It will increase this target to 25 per cent by 2030 and 75 per cent by 2050.[4]

The first phase of the proposed 1,000 MW Mohammed bin Rashid Al Maktoum Solar Park, in Seih Al-Dahal, about 50 kilometers south of the city of Dubai, was the 13-megawatt (DC) solar farm (DEWA 13) that had been constructed by First Solar in 2013.[5] It uses 152,880 FS-385 black CdTe modules and generates about 24 gigawatt-hours per year.[6][7] The second phase is a 200 MWAC (260 MWp[8]) photovoltaic plant to be built by ACWA Power, a Riyadh-based company, expected to be completed in April 2017.[9] The plant will also use First Solar's CdTe modules.[10] In April 2015, Dubai Electricity and Water Authority (DEWA) publicly announced the third phase of 800 MW, along with Dubai's revised target to increase the share of renewables on the energy mix to 7% by 2020.[11]

The Mohammed bin Rashid Al Maktoum Solar Park is one of the world's largest renewable project based on an independent power producer (IPP) model. Besides the three phases that consist of solar farms using PV technology, the long-term project will also include concentrating solar power (CSP). The total capacity of the entire project is planned to reach 3,000 MW.[11]

The 200-megawatt second phase of the project caused worldwide attention, as the winning bid of the tender set a new record-low traiff of only US ¢5.89 per kilowatt-hour. This is about 20% lower than any previous, unsubsidized power purchase agreement (PPA) the world has seen before. The PPA is set to a 25-year time frame.[8][12]

In parallel to the utility-scale projects of the Mohammed bin Rashid Al Maktoum Solar Park, in March 2015 DEWA also launched a net metering scheme to encourage companies and private individuals to install solar power on their roofs.[13] While the scheme is currently voluntary, solar panels are to be made mandatory for all buildings in Dubai by 2030.[14]