Minidoka Dam

Minidoka Dam

Minidoka Dam and Lake Walcott
Location of Minidoka Dam in Idaho
Location Cassia / Minidoka counties, Idaho, USA
Coordinates 42°40′10″N 113°29′01″W / 42.66944°N 113.48361°W / 42.66944; -113.48361Coordinates: 42°40′10″N 113°29′01″W / 42.66944°N 113.48361°W / 42.66944; -113.48361
Construction began 1904
Opening date 1906
Operator(s) U.S. Bureau of Reclamation
Dam and spillways
Impounds Snake River
Height 86 feet (26 m)
Length 4,475 feet (1,364 m)
Spillway type Gated and flashboard section
Spillway capacity 40,800 cu ft/s (1,160 m3/s)
Reservoir
Creates Lake Walcott
Total capacity 210,200 acre feet (0.2593 km3)
Catchment area 2,231 sq mi (5,780 km2)
Surface area 4,245 feet (1,294 m)
Power station
Hydraulic head 74 ft (23 m)
Turbines 2X10 MW Kaplan horizontal turbines (Units 8, 9) 3 and 5.5 MW Francis turbines (Units 6 and 7), Units 1-5 retired
Installed capacity 28 MW
Minidoka Dam and Power Plant
Area 640 acres (260 ha)
Built 1904
NRHP Reference #

74000746

[1]
Added to NRHP October 29, 1974

The Minidoka Dam is an earthfill dam on the Snake River in south central Idaho. The dam, originally completed in 1906, is east of Rupert on county highway 400; it is 86 feet (26 m) high and nearly a mile (1.6 km) in length, with a 2,400-foot (730 m) wide overflow spillway section.[2] The dam and power plant were listed on the National Register of Historic Places in 1974.[1] Walcott Park, close to the dam, is a popular summertime picnic area. Lake Walcott State Park and the headquarters for the Minidoka National Wildlife Refuge are adjacent to the dam.

History

Minidoka Project (1904)
Regional map

The Minidoka dam was the first Reclamation Service project in Idaho, part of the Minidoka Project of dams, reservoirs and canals. Construction began in 1904 and by 1906 most of the dam's canals and laterals were finished. By 1909, Minidoka Dam's power plant, the first federal power plant in the northwest, was completed.[3] By its completion, the total cost of the dam was $5.8 million, which exceeded estimates. The Minidoka project brought water into the southeastern areas of Idaho near the cities of Rupert and Burley. The project was successful, as what was once an uninhabited sagebrush desert is now bountiful farmland. The powerplant installation was significant as a precursor of much larger projects on the Columbia River, including Bonneville Dam.[2]

A study examining the possibility of raising the crest of the dam by 5 feet (1.5 m) was conducted from 2000 to 2009, but with costs ranging from $150 million to $205 million the project has not been pursued.[4] A $50 million spillway repair project is expected to go ahead.[5]

Power plant

The Minidoka Dam was initially designed and constructed without power generation facilities, but the Minidoka power plant was soon added in 1909-1910. It was designed to generate electricity for pumping operations to support irrigation on the south bank of the Snake River. While irrigation water could flow by gravity to the north bank, water for the south bank had to be raised to a higher elevation. Units 1-5 generated power using propellor-style units., but did not efficiently use the water volume passing through the dam. Unit 6, a 3MW unit with a Francis turbine, was added in 1927, with the 5.5 MW Unit 7 added in 1942. Units 1 - 5 were retired in 1995, before the construction of the Allen E. Inman Powerplant in 1997. The new plant houses Unit 8 and 9, each with a 10MW Kaplan horizontal unit. The original plant housing Units 1 -5 has been preserved and is listed on the National Register of Historic Places.[6]

Excess power from the original powerplant was sold to local farmers, making the Minidoka area one of the first rural areas to have an electric power distribution system.[7]

Statistics

See also

References

  1. 1 2 Staff (2009-03-13). "National Register Information System". National Register of Historic Places. National Park Service.
  2. 1 2 Jackson, Donald C. (1988). Great American Bridges and Dams. The Preservation Press. pp. 289–290. ISBN 0-89133-129-8.
  3. "Minidoka Project". U.S. Bureau of Reclamation. Retrieved 3 May 2011.
  4. Lundquist, Laura (August 19, 2010). "Government finalizes study of Minidoka Dam". Magic Valley Times. Retrieved 4 May 2011.
  5. Welch, Laurie (January 17, 2011). "Decade-long Minidoka Dam replacement effort hinges on federal money". Magic Valley Times. Retrieved 4 May 2011.
  6. "Minidoka Powerplant". U.S. Bureau of Reclamation. Retrieved 5 May 2011.
  7. "Minidoka Dam". Idaho Public TV. Retrieved 5 May 2011.

External links

Wikimedia Commons has media related to Minidoka Dam.
This article is issued from Wikipedia - version of the Saturday, September 19, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.