MRT (Bangkok)

Metropolitan Rapid Transit
Overview
Native name รถไฟฟ้ามหานคร
Owner Mass Rapid Transit Authority of Thailand
Locale Bangkok Metropolitan Region
Transit type Heavy rail
(and monorail (planned))
Number of lines 1 in operation
3 under construction
(4 planned)
Number of stations 18[1]
Daily ridership 253,255 (Year 2014)[2]
Annual ridership 92.4 million (Year 2014)[2]
Operation
Began operation 3 July 2004
Operator(s) Bangkok Expressway and Metro Public Company Limited (SET: BEM)
Number of vehicles 19
Technical
System length 20 km (12 mi)[1]
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification Third rail
Top speed 80 km/h (50 mph)

The Metropolitan Rapid Transit or MRT is a rapid transit system serving the Bangkok Metropolitan Region in Thailand. The first section of the Blue Line between Hua Lamphong and Bang Sue opened in 2004 as Bangkok's second public transit system. The MRT is operated by the Bangkok Expressway and Metro Public Company Limited (BEM) under a concession granted by the Mass Rapid Transit Authority of Thailand (MRTA). Along with the Bangkok Mass Transit System (BTS, also called the Skytrain), and the Airport Rail Link (ARL), the MRT is part of Bangkok's rail transportation infrastructure.

The MRT serves more than 240,000 passengers each day. It has 18 operational stations along 20 kilometers (12 mi)[1] of underground route. The Blue Line, officially the Chaloem Ratchamongkhon Line, is the only line currently in operation. As of 2011, two extensions of the Blue Line are under construction. When completed, the Blue Line will become a loop line around the centre of Bangkok, with an extension to Bang Khae on its western side. The MRT Purple Line is also under construction. It will connect Bang Sue with Nonthaburi in the north-west, and will be the first public transit line outside the Bangkok Metropolitan Administration.

The MRT line is officially known in Thai as rotfaifa mahanakhon (รถไฟฟ้ามหานคร) or "metropolitan electric train", but it is more commonly called rotfai taidin (รถไฟใต้ดิน), literally, "underground train". The metro has a fleet of 19 trains; the 19th train entered service in October 2007 after a major accident.

History

The entrance to Huai Khwang MRT Station
Platform screen door at all stations
Inside of the train
Bangkok Metro map.

The MRT was constructed under a concession concept. For the first MRT line, officially known as Chaloem Ratchamongkhon or informally as the "Blue Line", most civil infrastructure were provided by the government sector, Mass Rapid Transit Authority of Thailand (MRTA), and handed over to their concessionaire under a 25-year concession agreement. Bangkok Expressway and Metro Public Company Limited (Formally known as Bangkok Metro Company Limited) is the only private sector company that won a bid in MRTA's concession contract for the blue line. As MRTA's concessionaire, BEM provides M&E equipment, including electrical trains, signalling systems, SCADA, communication, PSD, etc. for the subway project and fully operates the system. To maintain the system, BEM has subcontracted in 10 years to Siemens which was the M&E system supplier since system opening and 7 years maintenance contract to two local maintenance services for north and south line.

The construction of the first Bangkok Metro line, officially known as Chaloem Ratchamongkhon (Thai สายเฉลิมรัชมงคล) "Celebration of Royal Auspice" or informally as the "Blue Line", began on 19 November 1996. The project suffered multiple delays not only because of the 1997 economic crisis, but also due to challenging civil engineering works of constructing massive underground structures deep in the water-logged soil upon which the city is built.

The Blue Line was opened for a limited public trial period of several weeks starting on 13 April 2004. On 3 July 2004 the line was officially opened at 19:19 local time by HM King Bhumibol and Queen Sirikit, who were accompanied by other members of the royal family. Within 30 minutes of its opening, sightseers filled the system to its maximum capacity, but after the initial rush ridership has settled down to around 180,000 riders daily considerably lower than projections of over 400,000, despite fares being slashed in half from 12-38 baht to 10-15 baht per trip. From 2006 until 2008, fares ranged between 14-36 baht per trip. The fare was raised to 16-41 Baht on 1 January 2009. Current daily ridership (2014) stands at about 253,000.[2]

Operation

The 20-kilometre, 18-station Blue line[1] presently runs from Bang Sue to Hua Lamphong via Phra Ram 9 and has a carrying capacity of 40,000 people in each direction per hour. Similar to the Skytrain, the Metro uses trains supplied by Siemens which travel up to 80 km/h. Passengers can conveniently connect to the Skytrain at Si Lom, Sukhumvit and Chatuchak Park stations. The metro has a large depot in Huai Khwang district, which is located between Phra Ram 9 and Thailand Cultural Centre stations.

Considering that Bangkok is a low-lying plain which is prone to flooding, all of the Metro's station entrances are raised about one metre above the ground level and are equipped with built-in floodgates in order to avoid water inundating the system. Lifts and ramps are found at all stations, providing easy access for passengers in wheelchairs. Stations have multiple passageways (generally four) which allow passengers to connect to any corner of the adjacent surface intersection. Passageways between exits are very spacious and some are beginning to open as malls. Maps depicting the local area and exit points are posted on the walls on the way out.

Due to safety considerations, platform screen doors are installed. Uniformed security personnel and security cameras are present at each and every platform. Currently 19 three-car metro trains, of the Siemens Modular Metro type, are used. Each metro train consists of two motor cars and a centre trailer car.[3]

Ticketing

Round black token

The ticketing system uses RFID contactless technology with round black tokens issued for single trips and contactless stored value cards for frequent travellers. In the near future, a joint ticketing system will be set up so that passengers can use a single ticket on the Metro as well as on the Skytrain. Multi-storey park & ride facilities are provided at Lat Phrao and Thailand Cultural Centre. Motorists who park their cars at these premises will be issued with additional contactless smartcards and they need to have them electronically stamped at their destination station. The turnstiles accept cards or paid for tokens, both available from a booth or ticket machines, which do take notes. All luggage must be lifted above them when going through otherwise they sense the luggage going first as the paid for passenger and then the person carrying it is blocked.

Apart from the tokens, smart cards are also available:

Children whose age is not over 14 or whose height does not exceed 90 cm enjoy free rides. Reduced fares for children and elderly also apply when buying a token at the booth.

Lines

The only line currently in service is the Blue Line, opened on 3 July 2004. It runs eastward from Bang Sue Station in Chatuchak District along Kamphaeng Phet, Phahon Yothin and Lat Phrao Roads, then turns south following Ratchadaphisek Road, then west following Rama IV Road to Hua Lamphong Station in Pathum Wan District. A second line, the Purple Line, is under construction.

Line Opened Terminal Length /km Stations
 Blue Line 
(Heavy rail)
2004 Hua Lamphong Bang Sue 20 km (12 mi)[1] 18[1]

Blue Line

Main article: MRT Blue Line

The first line, 20-kilometer, 18-station Blue line[1] presently runs from Bang Sue to Hua Lamphong via Phra Ram 9 and has a carrying capacity of 40,000 people in each direction per hour. Similar to the Skytrain, the Metro uses trains supplied by Siemens which travel up to 80 km/h. Passengers can conveniently connect to the Skytrain at Si Lom, Sukhumvit and Chatuchak Park stations. The metro has a large depot in Huai Khwang district, which is located between Phra Ram 9 and Thailand Cultural Centre stations.

Expansion plans

Line Date proposed opening Terminal Length /km Stations Status
 Blue Line  extension
(Heavy rail)
2017 Bang Sue Tha Phra 13 km (8.1 mi) 7 Under construction
2017 Hua Lamphong Lak Song 14 km (8.7 mi) 10 Under construction
2029 Lak Song Phutthamonthon Sai 4 8 km (5.0 mi) 5 Planned
 Sukhumvit Line  extension
(Heavy rail; owns with BMA)
2017 Bearing Kheha Samut Prakan 12.6 km (7.8 mi) 7 Under construction
2029 Kheha Samut Prakan Bang Pu 7 km (4.3 mi) 4 Planned
2019 Mo Chit Khu Khot 19 km (12 mi) 16 Under construction
2029 Khu Khot Eastern Outer Ring 9 km (5.6 mi) 4 Planned
 Purple Line 
(Heavy rail)
August 12, 2016 Khlong Bang Phai Tao Pun 23 km (14 mi) 16 Finished, in limited trial service
2020+(?) Tao Pun Phra Pradaeng 20 km (12 mi) 17 Planned
 Orange Line 
(Heavy rail)
2019/20 Bang Khun Non Suvinthawong 37.5 km (23.3 mi) 29 Approved
 Pink Line 
(Monorail)
2019 Nonthaburi Civic Center Min Buri 35 km (22 mi) 30 Approved
 Yellow Line 
(Monorail)
2019 (Phase 1) Lat Phrao Samrong 30.4 km (18.9 mi) 23 Approved
 Brown Line 
(Monorail)
2025(?) Nonthaburi Civic Center Sammakon 22 km (14 mi) 23 Planned

Various expansion plans of the Metro have been proposed. As of 2011, the MRT Purple Line and the two extension lines of the blue line are also under construction. It is planned that, eventually, the combined route distance of the Metro alone will total 91 km with 3 Metro lines covering all of the major areas of Bangkok. The Blue line, once completely extended, will form a lariat-shaped loop encircling the city.

As per the BMCL's annual report, earning of profit from operation is still far away and BMCL is still subsidized by main share holder which is CH Karnchang.

Blue Line extension

MRT Blue Line extension under construction in December 2013
Main article: MRT Blue Line
  1. Bang Sue Bang Phlat Tha Phra (under construction, operational in 2016). It starts from Bang Sue Station, passing along Pracharat Sai 2 Road. It crosses Chao Phraya River and turns left along Charansanitwong Road until it reaches Tha Phra at Petch Kasem and Charansanitwong intersection. The length is 13.1 km with 7 elevated stations.
  2. Hua Lamphong Tha Phra Lak Song (under construction, operational in 2016). From Hua Lamphong Station it goes along Charoen Krung Road, passes Wat Mangkon Kamalawat Station, Wang Burapha Station, and then turns left at Wat Pho before crossing under the Chao Phraya River at Pak Khlong Talart. Passing through Issaraphap, it finally enters Petch Kasem Road and ends at Lak Song. The 4 underground stations end at Tha Phra before turning to be elevated for 6 stations. The length is 13.9 km. with 8.9 km elevated station and 4.8 km underground stations.
  3. Lak Song Phutthamonthon Sai 4 (planned operational in 2025).

Green Line (Sukhumvit Line)

Main article: Sukhumvit Line

Preliminary construction started in April 2012 for a 12.6 km, 7 station extension from Bearing (E14) to Samut Prakhan (E23). The extension is planned to open in 2017. 2 further planned stations will be built at a later date. In April 2013, the MRTA awarded Ch Karnchang the contract for track laying and electrical systems.[4]

North- An 11.4 km, 11 station northern extension from Mo Chit (N8) to Saphan Mai (N20) in Don Mueang District has been planned since the Sukhumvit line opened. Originally, this extension was scheduled to be completed by 2008. A further 16.5 km, 9 station extension from Saphan Mai (N20)to Lam Lukka (N29) was also planned once the extension to Saphan Mai had been completed. This was subsequently split into two extensions. A 7.5 km, 4 station extension to Khu Khot and a 9 km, 4 stations extension along Lam Lukka rd to the Outer Eastern Ring Rd.

Due to the significant delay in the northern extension plans, both extensions are now planned to be tendered at the same time. A tender was finally released in January 2014 [5] with an April deadline before being delayed until late May 2014 due to concerns from bidders. A military coup in late May suspended the bidding process whilst the military administration reviewed all major projects. In late June, the military administration affirmed the tender which will proceed before the end of 2014. As of 11 October 2015, the tender around the phaholyothin road is about to take place. The tender specifies a construction period of 1350 days.

South A further 7 km, 4 station extension from Samut Prahkan (E23) to Bang Pu (E27) is planned. It may be tendered by 2015/16 for completion by 2019/20.

Purple Line

MRT Purple Line under construction in December 2013
Main article: MRT Purple Line

The Purple Line is aimed to serve travel demand between the northwestern suburb of Bangkok in Nonthaburi Province and southern area of Thonburi in Phra Pradaeng District, Samut Prakan Province. It also runs through downtown along Samsen Road, passing Rattanakosin old quarter and many historical places in Dusit and Phra Nakhon District like the national library, Thewet market, Bang Lamphu, the Democracy Monument, the Golden Mount, Phahurat, the Memorial Bridge and Wongwian Yai roundabout, and also intends to serve the new Thai parliament construction site at Kiak Kai intersection.

This Line is divided into two sections, Tao Pun - Khlong Bang Phai 23 km, which is under construction, and Tao Pun - Phra Pradaeng, 19.8 km. The section from Tao Pun - Khlong Bang Phai was scheduled to be completed in 2014,[5] but is now due to open in 2016.

This will be the first Bangkok metro line into an adjacent province (Nonthaburi). The section links Tao Pun Station in Bang Sue, Bangkok, to Khlong Bang Phai Station in Bang Bua Thong, Nonthaburi Province. The MRT Blue Line extension between the existing Bang Sue terminus and Tao Pun is constructed as part of contract 1 to provide an interchange between both lines. The Purple Line will be operated Tao Pun - Khlong Bang Phai, comprising 16 stations along an elevated route. The first stage of construction commenced in early 2010.

The line is indicated by the colour purple on network maps.

Orange Line

Main article: MRT Orange Line

The Orange Line will start from Min Buri as elevated structure on Ramkhamhaeng Road (former Suka Phiban III Road) from eastern suburb in Min Buri District and goes underground near Lam Sali intersection in Bang Kapi District, also transfers to MRT Yellow Line. It continues southwest along Ramkhamhaeng Road, passing Hua Mak Stadium and Ramkhamhaeng University. Then it turns to the west and crosses Pradit Manutham Road to the current MRT depot. Then it goes to Thailand Cultural Centre Station, the alignment crosses over and transfers to the current MRT Blue Line. It continues via Din Daeng housing estates and Bangkok City Hall 2 to Vibhavadi Rangsit Road, Sam Liam Din Daeng Junction. Then turn left into Ratchaprarop Road towards Pratunam and turn right into Phetchaburi Road then interchange with BTS Sukhumvit Line at Ratchathewi Station. It continues along Larn Luang Road and Ratchadamnoen Road. Then crosses the Chao Phraya River near Phra Pinklao Bridge, passes Siriraj Hospital and goes along Bangkok Noi Rail line and terminates at Bang Khun Non Station, interchanges with MRT Blue Line again. The total length is 37.5 km.

This Line is divided into 3 sections

The section from Bang Khun Non to Bang Kapi is scheduled to be completed in 2019/20. However, the planned tender date of late 2013 has been delayed by at least 15 months until 2015 due to political turmoil in late 2013 until May 2014.

When fully completed, the line will be 37.5-km long, mostly underground, with 29 stations (7 elevated stations and other 22 underground stations, including the current Thailand Cultural Centre Station of MRT Blue Line).

The line is indicated by the colour orange on the map.

Pink Line

Main article: MRT Pink Line

The 35.5 km long Pink line will have 30 stations and will be a monorail line. It will run in the northern part of the city from east Bangkok in Minburi District (also transfers to MRT Orange Line) along Ram Inthra Road to west Bangkok (Pak Kret district, Nonthaburi Province) Chaeng Watthana Road and Tiwanon Road ending at The Nonthaburi Civic Center which transfer to the MRT Purple Line.

The line will also transfer with the SRT Dark Red Line which is under construction, the planned BTS Sukhumvit Line extension to Lam Lukka, and the planned MRT Grey Line in the future.

The Pink line was due to be tendered in the 3rd quarter of 2013 with construction due to commence in early 2014.[6] However, delays in preparation of the tender in relation to the selection of monorail rolling stock and subsequent political protests resulting in a snap national election in early Feb 2014, further delayed the Pink Line tender.[7] A subsequent coup in May 2014 resulted in a new military administration and the tender being deferred for 2014. More likely, the tender will not be ready until mid 2015 according to the MRTA.

Yellow Line

Main article: MRT Yellow Line

The 30.4 km long Yellow line will have 20 stations. It was originally proposed to be an underground and elevated heavy rail line. However, it is now planned to be built as an elevated monorail line. The line will be built in two phases and with Phase 1 planned to be completed by 2019.

In Dec 2011, the MRTA was instructed by the MOT to divide the Yellow Line into two Phases for tender and construction purposes and to control land appropriation costs.[8] In June 2012, the MRTA contracted consultants to undertake detailed designs of the Yellow Line. In Feb 2013, OTP stated that the tender for the Yellow line should be ready by late 2013 for tender in early 2014 [9] However, similar to the Pink Line, delays in finalising the technical requirements of the tender in relation to the selection of monorail rolling stock which determines the type of track to be constructed resulted in a significant delay. The subsequent political turmoil of 2014 caused further delay. Thereafter, the coup of May 2014 resulted in a new military administration and the tender being deferred for 2014. The Yellow Line tender will proceed after the Pink and Orange Lines have been tendered according to the MRTA.

Once the Yellow Line is complete, a future extension may eventually be built from Samrong across the Chao Praya River to link with the MRT Purple Line at Rat Burana.

Brown Line

Main article: MRT Brown Line

The 20.5 km long Brown line is under study by the OTP. It is proposed to run from Khae Rai, Nonthaburi to Bueng Kum with 21 stations and be a monorail line.

The line was originally proposed as the Gold Line by the Pheu Thai party for the Bangkok Governors election held in March 2013. This was in response to objections by Kasetart University to long proposed Expressway extensions in the area. The line would essentially have replaced the need to build an elevated Expressway.[10] However, the Pheu Thai candidate did not win the Bangkok Governor election and the Gold Line was dropped with the Deputy Minister of Transport stating that land appropriation costs were too high.[11] Subsequently, OTP has reworked the Gold Line proposal into a new Brown Line following much the same route. As of June 2013 the route was under preliminary study by OTP.[12]

This line should not be confused with the original 2004 13 km MRT Brown Line proposal from Bang Kapi to Min Buri. This was subsequently merged in 2009 into an extended MRT Orange Line.

Major accident record

On 17 January 2005, just after 09:15, an empty train returning to the depot collided with a peak-hour train filled with passengers at the Thailand Cultural Centre MRT Station. 140 people were hurt, most of whom sustained only minor injuries, and the entire Metro network was shut down for two weeks.

After initial investigations, it was found that the empty train had run into problems shortly before the accident, grinding to a halt on a curve leading to the depot. The driver applied its brake and was waiting to be towed to the maintenance centre close to Thailand Cultural Centre station.

A rescue train was attempting to connect to the stalled train when the driver was told to release the brake while coupling had not yet been successful. It was then that the empty train began to roll backwards at a speed of ten metres per second, before smashing into the other train, which was carrying passengers. Therefore, it was believed that the incident was caused by negligence due to insufficient training of operation staff.[13] This accident also resulted in two damaged trains with heavily damaged areas limited to the two leading cars. The colliding speed was suspected to be about 60 km/h due to the appearance of damaged areas. However, one train, which was rebuilt from the repair of the minor-damaged cars, was already fitted for operation at the end of 2006 and the remaining one was still under heavy repair until mid of 2007; it was released into service in October, 2007. The cost resulting from the accident might be a much higher figure than BMCL quoted, and it was expected to be at least 400 million baht, which was totally insured by a local insurance company.

The Metro resumed full operation on 1 February 2005, and passenger numbers soon rose back to pre-crash levels, partly due to a temporary promotional fare scheme which allowed passengers to travel any distance on the MRT for only ten baht (~0.33 USD).

See also

References

  1. 1 2 3 4 5 6 7 "M.R.T. Chaloem Ratchamongkhon Line". Mass Rapid Transit Authority of Thailand (MRTA). Retrieved 2014-06-27.
  2. 1 2 3 "Bangkok Metro Public Corporation Annual Report 2014" (pdf). 2015. p. 6. Retrieved 2016-01-07.
  3. "Bangkok Metro, Thailand". Railway-Technology.com. Retrieved 2014-06-27.
  4. "Ch Karnchang gets Phase 2 of Bearing-Samut Prakan route". The Nation (www.nationmultimedia.com). 13 April 2013. Retrieved 2014-06-27.
  5. Mahitthirook, Amornrat (26 November 2012). "Mall links to boost MRT's bottom line". Bangkok Post. Retrieved 2012-11-26.
  6. "Cabinet to mull rail projects" Bangkok Post, 26 Feb 2013
  7. "http://www.thaipost.net/news/121213/83272"
  8. แจ้งเกิดรถไฟฟ้า2สาย สุกำพลเครื่องร้อน. ThanOnline (in Thai). 27 December 2011. Retrieved 2014-06-27.
  9. สนข.เร่งสร้างรถไฟฟ้า ฟุ้งปี56ได้ใช้ตั๋วร่วมแน่. Thaipost (in Thai). 11 February 2013. Retrieved 2014-06-27.
  10. "Kasetsart backs light rail move". Bangkok Post. 12 February 2013. Retrieved 2014-06-27.
  11. "City expressway plan redrawn to go north". Bangkok Post. 14 May 2013. Retrieved 2014-06-27.
  12. https://www.facebook.com/kucityfanpage/posts/381668901937571
  13. "Thai subway shut for safety probe". BBC News. 17 January 2005. Retrieved 2010-05-13.

External links

Wikimedia Commons has media related to Bangkok Metro.

Official sites

Unofficial sites

Downloads

This article is issued from Wikipedia - version of the Sunday, February 14, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.