Line 19, Shanghai Metro

Line 19, Shanghai Metro
Line 19
十九号线
Overview
Type Rapid transit
System Shanghai Metro
Status Planned
Locale Shanghai, China
Technical
Track gauge 1,435 mm (4 ft 8 12 in)

Line 19 is a line on the Shanghai Metro that is part of the 2010-2020 Shanghai Metro plan. It is planned to enter operation by 2020. It used to be treated as the last phase for Line 9,

Line 19 starts from Chuanqiao Road in Pudong, via the Shanghai Yangtze River Tunnel and the Shanghai Yangtze River Bridge to Chongming Island, Chongming County, and it will have a branch line from Changxing Island to Hengsha Island. This line can interchange with Lines 9, 12 and 14. [1]

Planned stations


Construction plan

References

This article is issued from Wikipedia - version of the Monday, January 25, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.