Leander-class frigate
HMS Apollo, 1976 | |
Class overview | |
---|---|
Name: | Leander class |
Operators: | |
Preceded by: | |
Succeeded by: | Type 21 frigate |
In commission: | 1963 - early 1990s |
Completed: | 26 |
Active: | 0 |
Lost: | 0 |
Retired: | 26 (3 as artificial reefs, 2 as targets) |
General characteristics | |
Type: | Frigate |
Displacement: |
|
Length: | 113.4 metres (372 ft) |
Beam: | 13.1 metres (43 ft) |
Draught: | 4.5 metres (15 ft) |
Propulsion: | 2 Babcock & Wilcox oil-fired boilers, geared steam turbines, 22,370 kilowatts (30,000 hp), 2 shafts |
Speed: | 27 knots (50 km/h; 31 mph) |
Range: | 7,400 kilometres (4,600 mi; 4,000 nmi) at 15 knots (28 km/h; 17 mph) |
Complement: | 260 |
Sensors and processing systems: |
|
Armament: |
|
Aircraft carried: |
|
The Leander-class, or Type 12I frigates,[1] comprising twenty-six vessels, was among the most numerous and long-lived classes of frigate in the Royal Navy's modern history. The class was built in three batches between 1959 and 1973. It had an unusually high public profile, due to the popular BBC television drama series Warship. The Leander silhouette became synonymous with the Royal Navy through the 1960s until the 1980s. Only two Leander Class Frigates survive today, serving in the Ecuadorian Navy as of February 2015.
The Leander design or derivatives of it were built for other navies:
- Royal New Zealand Navy as the Leander class
- Chilean Navy: Condell class
- Royal Australian Navy: River class
- Indian Navy: Nilgiri class
- Royal Netherlands Navy: Van Speijk class
Design
On 7 March 1960, the Civil Lord of the Admiralty C. Ian Orr-Ewing stated that the "Type 12 Whitby-class anti-submarine frigates are proving particularly successful ... and we have decided to exploit their good qualities in an improved and more versatile ship. This improved Type 12 will be known as the Leander class. The hull and steam turbine machinery will be substantially the same as for the Whitbys. The main new features planned are a long-range air warning radar, the Seacat anti-aircraft guided missile, improved anti-submarine detection equipment and a light-weight helicopter armed with homing torpedoes. We shall also introduce air conditioning and better living conditions."[2] The 1963 edition of Jane's Fighting Ships described it as a "mainly anti-submarine but flexible and all purpose type".[3]
"The Leander class have the same hull and substantially the same steam turbine machinery as the Whitby class, but are a revised and advanced design and will fulfil a composite anti-submarine, anti-aircraft and air direction role. The 40mm guns will eventually be replaced by Seacat ship-to-air launchers. The ships are equipped with VDS (Variable Depth Sonar), formerly known as dipping asdic."[3]
The Y160 boiler variant used on the Batch 3 Leanders (such as Jupiter) also incorporated steam atomisation equipment on the fuel supply so the diesel fuel entering the boilers via the three main burners was atomised into a fine spray for better flame efficiency. Some ships with Y100 Boilers were also converted to steam atomisation, HMS Cleopatra being one of them. The superheat temperature of the Y160 was controlled manually by the boiler room petty officer of the watch between 750–850 °F (399–454 °C) and the steam supplied to the main turbines was at a pressure of 550 psi (3,800 kPa). The Leander-class frigates did have Babcock & Wilcox boilers but of a more conventional two-drum design, one water drum and one steam drum, much like a Yarrow boiler without the second water drum. The water drum was offset to one side and below the furnace and steam drum. The two boilers fitted were 'handed' with the water drum inboard on both. Many Leanders had six burner furnaces (known as Five and a Half Boilers) and the output was varied by altering the number of burners in use.
Construction programme
- Royal Navy
Pennant | Name | (a) Hull builder (b) Main machinery manufacturers |
Laid down | Launched | Accepted into service | Commissioned | Estimated building cost[4] | |
---|---|---|---|---|---|---|---|---|
First 10, Y-100 machinery [5] | ||||||||
F109 | Leander | (a) & (b) Harland & Wolff Ltd, Belfast.[6] | 10 April 1959 [3] | 28 June 1961 [3] | March 1963 [6] | 27 March 1963 [3] | £4,630,000 [6] | |
F104 | Dido | (a) & (b) Yarrow & Co Ltd, Glasgow.[7] | 2 December 1959 [3] | 22 December 1961 [3] | September 1963 [7] | 18 September 1963 [3] | £4,600,000 [7] | |
F127 | Penelope | (a) Vickers-Armstrongs (Shipbuilders) Ltd, Newcastle (b) Vickers-Armstrongs (Engineers) Ltd, Barrow-in-Furness [7] |
14 March 1961 [3] | 17 August 1962 [3] | November 1963 [7] | 31 October 1963 [3] | £4,600,000 [7] | |
F114 | Ajax | (a) & (b) Cammell Laird & Co (Shipbuilders and Engineers) Ltd, Birkenhead.[7] | 19 October 1959 [3] | 16 August 1962 [3] | December 1963 [7] | 10 December 1963 [3] | £4,800,000 [7] | |
F10 | Aurora | (a) & (b) John Brown & Co Ltd, Clydebank[7][8] | 1 June 1961 [3] | 28 November 1962 [3] | April 1964 [8] | 9 April 1964 [5] | £4,650,000 [7][8] | |
F18 | Galatea | (a) Swan, Hunter & Wigham Richardson Ltd, Wallsend-on-Tyne (b) The Wallsend Slipway & Engineering Co Ltd, Wallsend-on-Tyne (steam turbines) (b) Parsons Marine Turbines Co Ltd, Wallsend-on-Tyne (gearing).[7][8] |
29 December 1961 [3] | 23 May 1963 [3] | April 1964 [8] | 25 April 1964 [5] | £4,500,000 [7][8] | |
F15 | Euryalus | (a) Scotts Shipbuilding & Engineering Co Ltd, Greenock (b) Scotts Shipbuilding & Engineering Co Ltd (steam turbines) (b) Fairfield Shipbuilding & Engineering Co Ltd, Glasgow (gearing).[8] |
2 November 1961 [3] | 6 June 1963 [3] | September 1964 [8] | 16 September 1964 [5] | £4,350,000 [8] | |
F39 | Naiad | (a) Yarrow & Co Ltd, Glasgow (b) Yarrow & Co Ltd, Glasgow (steam turbines) (b) Parsons Marine Turbines Co Ltd, Wallsend-on-Tyne (gearing).[8] |
30 October 1962 [3] | 4 November 1963 [5] | March 1965 [8] | 15 March 1965 [5] | £4,750,000 [8] | |
F38 | Arethusa | (a) JS White & Co Ltd, Cowes, Isle of Wight (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) Parsons Marine Turbines Co Ltd, Wallsend-on-Tyne (gearing).[9] |
7 September 1962 [10] | 5 November 1963 [5] | November 1965 [9] | 24 November 1965 [5] | £4,850,000 [9] | |
F28 | Cleopatra | (a) HM Dockyard, Devonport (b) Cammell Laird & Co (Shipbuilders & Engineers) Ltd, Birkenhead (turbines) (b) John Brown & Co Ltd, Clydebank (gearing).[9] |
19 June 1963 [5] | 25 March 1964 [5] | February 1966 [9] | 4 January 1966 [5] | £5,300,000 [9] | |
Second 6, Y-136 machinery [5] | ||||||||
F42 | Phoebe | (a) Alexander Stephen & Sons Ltd, Linthouse, Glasgow (b) Alexander Stephen & Sons Ltd, Linthouse, Glasgow (steam turbines) (b) David Brown & Co Ltd, Huddersfield (gearing).[11] |
3 June 1963 [5] | 8 July 1964 [5] | April 1966 [11] | 15 April 1966 [5] | £4,750,000 [11] | |
F45 | Minerva | (a) Vickers Ltd, Shipbuilding Group, Newcastle (b) Alexander Stephen & Sons Ltd, Linthouse, Glasgow (steam turbines) (b) David Brown & Co Ltd, Huddersfield (gearing).[11] |
26 July 1963 [3] | 19 December 1964 [5] | May 1966 [11] | 14 May 1966 [5] | £4,700,000 [11] | |
F40 | Sirius | (a) HM Dockyard, Portsmouth (b) JS White & Co Ltd, Cowes, Isle of Wight (turbines) (b) David Brown & Co Ltd, Huddersfield (gearing).[11] |
9 August 1963 [5] | 22 September 1964 [5] | June 1966 [11] | 15 June 1966 [5] | £5,600,000 [11] | |
F52 | Juno | (a) JI Thornycroft Ltd, Southampton (b) JI Thornycroft Ltd, Southampton (steam turbines) (b) David Brown & Co Ltd, Huddersfield (gearing)[12] |
16 July 1964 [5] | 24 November 1965 [5] | July 1967 [12] | 18 July 1967 [5] | £5,020,000 [12] | |
F56 | Argonaut | (a) Hawthorn Leslie, Hebburn (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) David Brown & Co Ltd, Huddersfield (gearing).[12] |
27 November 1964 [5] | 8 February 1966 [5] | September 1967 [12] | 17 August 1967 [5] | £5,000,000 [12] | |
F47 | Danae | (a) HM Dockyard, Devonport (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) Fairfields (Glasgow) Ltd (gearing).[12] |
16 December 1964 [5] | 31 October 1965 [5] | October 1967 [12] | 7 September 1967 [5] | £5,720,000 [12] | |
Broad-beamed Leander Y-160 machinery [5] | ||||||||
F75 | Charybdis | (a) Harland & Wolff Ltd, Belfast (b) Vickers Ltd, Engineering Group, Barrow-in-Furness.[13] |
27 January 1967 [5] | 28 February 1968 [5] | June 1969 [13] | 2 June 1969 [5] | £6,330,000 [13] | |
F58 | Hermione | (a) Yarrow & Co Ltd, Glasgow (b) Alex Stephen & Sons Ltd, Linthouse, Glasgow (steam turbines) (b) Vickers Ltd, Engineering Group, Barrow-in-Furness (gearing).[13] |
6 December 1965 [5] | 26 April 1967 [5] | July 1969 [13] | 11 July 1969 [5] | £6,400,000 [13] | |
F60 | Jupiter | (a) Yarrow & Co Ltd, Glasgow (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) Vickers Ltd, Engineering Group, Barrow-in-Furness (gearing).[13] |
3 October 1966 [5] | 4 September 1967 [5] | August 1969 [13] | 9 August 1969 [5] | £6,100,000 [13] | |
F69 | Bacchante | (a) Vickers Ltd, Shipbuilding Group, Newcastle (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) Vickers Ltd, Engineering Group, Barrow-in-Furness (gearing).[13] |
27 October 1966 [5] | 29 February 1968 [5] | October 1969 [13] | 17 October 1969 [5] | £6,200,000 [13] | |
F57 | Andromeda | (a) HM Dockyard, Portsmouth (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) David Brown & Co Ltd, Huddersfield (gearing).[14] |
25 May 1966 [5] | 24 May 1967 [5] | December 1969 [14] | 2 December 1968 [5] | £6,700,000 [14] | |
F71 | Scylla | (a) HM Dockyard, Devonport (b) JS White & Co Ltd (turbines) (b) David Brown & Co Ltd (gearing).[13] |
17 May 1967 [5] | 8 August 1968 [5] | February 1970 [13] | 12 February 1970 [5] | £6,600,000 [13] | |
F12 | Achilles | (a) Yarrow & Co Ltd, Glasgow (b) JS White & Co Ltd (turbines) (b) David Brown & Co Ltd (gearing).[15] |
1 December 1967 [5] | 21 November 1968 [5] | July 1970 [15] | 9 July 1970 [5] | £6,270,000 [15] | |
F16 | Diomede | (a) Yarrow & Co Ltd, Glasgow (b) JS White & Co Ltd (turbines) (b) David Brown & Co Ltd (gearing).[16] |
30 January 1968 [5] | 15 April 1969 [5] | April 1971 [16] | 2 April 1971 [5] | £5,980,000 [16] | |
F70 | Apollo | (a) Yarrow & Co Ltd, Glasgow (b) JS White & Co Ltd (turbines) (b) David Brown & Co Ltd (gearing).[17] |
1 May 1969 [5] | 15 October 1970 [5] | 10 June 1972 [17] | 28 May 1972 [5] | £6,573,000 [17] | |
F72 | Ariadne | (a) Yarrow & Co Ltd, Glasgow (b) JS White & Co Ltd (turbines) (b) David Brown & Co Ltd (gearing).[17] |
1 November 1969 [5] | 10 September 1971 [5] | 10 February 1973 [17] | 10 February 1973 [5] | £6,576,000 [17] |
Midlife major refits
The entire class was given a standard weapons fit when built, with a 4.5in gun mount, Seacat missile system and Limbo ASW mortar. However, advances in weapons systems led to a number of different conversions being undertaken on various members of the class. This saw the class grouped into four broad batches:
- Ikara - installation of the Ikara ASW missile system in place of the 4.5in gun mount.
- Exocet/Seacat - installation of Exocet anti-ship missile system in place of 4.5in gun mount, plus additional Seacat surface-to-air missile systems.
- Exocet/Seawolf - installation of Exocet anti-ship missile system in place of 4.5in gun mount; replacement of Seacat with single Seawolf surface-to-air missile system.
- Gun - retained 4.5in gun mount and Seacat missile system.
Batch 1, Ikara conversion
Eight of the first ten Leanders were given the so-called "Batch 1" or "Ikara" conversion,[18] which saw the Ikara anti-submarine warfare missile installed in place of the 4.5in gun, plus an additional Seacat system.[19]
Pennant | Name | Place undertaken | Started | Completed | Cost[20] |
---|---|---|---|---|---|
Batch 1A | |||||
F109 | Leander | Devonport [21][18] | 8 June 1970 [21][22] | 12 January 1973 [18][19][21] | £7,587,000 [21] |
F114 | Ajax | Devonport [18][21] | 19 October 1970 [21][22] | 7 February 1974 [18][19][21] | £8,269,000 [21] |
F18 | Galatea | Devonport [18][21] | 4 October 1971 [21][22] | 6 September 1974 [18][19][21] | £9,217,000 [21] |
Batch 1B | |||||
F10 | Aurora | Chatham [18][21] | 4 December 1974 [21][22] | 27 February 1976 [18][19][21] | £15,580,000 [21] |
F39 | Naiad | Devonport [18][21] | 15 January 1973 [21][22] | 20 June 1975 [18][19][21] | £10,410,000 [21] |
F15 | Euryalus | Devonport [18][21] | 7 May 1973 [21][22] | 12 March 1976 [18][19][21] | £12,127,000 [21] |
F38 | Arethusa | Portsmouth [18][21] | 10 September 1973 [21][22] | 7 April 1977 [18][19] | £16,585,000 [21] |
F104 | Dido | Devonport [18][21] | 7 July 1975 [21][22] | 27 October 1978 [18][19][21] | £23,006,000 [21] |
Batch 2, Seacat/Exocet conversion
Two of the Leanders with Y-100 machinery, and five out of the six with Y-136 machinery, were given the so-called "Batch 2" or "Exocet" conversion.[23] This conversion gave them Exocet anti-shipping missiles in place of the 4.5in gun mount, 2 additional Seacat systems, and the ability to operate the Lynx helicopter.[19]
Pennant | Name | Commissioned | Place undertaken | Started | Completed | Cost ("Outturn")[20] | |
---|---|---|---|---|---|---|---|
Batch 2A | |||||||
F28 | Cleopatra | 4 January 1966 [5] | Devonport [21][23] | 23 July 1973 [21][22] | 19 December 1975 [19][21][23] | £13,820,000 [21] | |
F42 | Phoebe | 15 April 1966 [5] | Devonport [21][23] | 5 August 1974 [21][22] | 28 April 1977 [19][21][23] | £18,204,000 [21] | |
F40 | Sirius | 15 June 1966 [5] | Devonport [21][23] | 10 March 1975 [22] | 10 February 1978 [19][21][23] | £21,598,000 [21] | |
F45 | Minerva | 14 May 1966 [5] | Chatham [21][23] | 1 December 1975 [21][22] | 11 April 1979 [19][21][23] | £31,575,000 [21] | |
Batch 2B | |||||||
F56 | Argonaut | 17 August 1967 [5] | Devonport [21][23] | 23 February 1976 [21][22] | 28 March 1980 [19][21][23] | £30,262,000 [21] | |
F47 | Danae | 7 September 1967 [5] | Devonport [21][23] | 1 August 1977 [21][22] | 8 April 1981 [19][21][23] | £39,279,000 [21] | |
F127 | Penelope | 31 October 1963 [3] | Devonport [19][21][23] | November 1981 [19][21] | 15 January 1982 [21][23] | £47,687,000 [21] | |
F52 | Juno | 18 July 1967 [5] | Exocet conversion cancelled.[23] | ||||
Batch 2, navigational training ship conversion
Juno, commissioned 18 July 1967 was converted to serve as a navigational training ship.[21] Work at Rosyth[21] began in January 1982 and completed in February 1985.[24]
Batch 3, Seawolf/Exocet conversion
The Seawolf conversion gave the broad-beamed Leanders Exocet anti-shipping missiles in place of the 4.5in mounting, a Seawolf missile system in place of Seacat, Sonar 2016, and the ability to operate the Lynx helicopter.[19] Only five of the broad-beamed Leanders were converted to carry Seawolf due to costs (£70 million for each refit) and, as a lesser consideration, to retain some ships capable of naval gunfire support.[25]
Ship | Commissioned | Place undertaken | Started | Planned completion | Actual completion | Cost[20] |
---|---|---|---|---|---|---|
Andromeda F57 | 2 December 1968 [5] | Devonport [21][25] | 3 January 1978 [21][22][26] | 6 February 1981 [19][21][25] | £59,990,000 [21] | |
Charybdis F75 | 2 June 1969 [5] | Devonport [19][21][25] | 25 June 1979 [21][22][27] | June 1982 [27] | 16 July 1982 [21][25] | £61,581,000 [21] |
Jupiter F60 | 9 August 1969 [5] | Devonport [19][21][25] | 28 January 1980 [21][22][27] | July 1983 [27] | 14 October 1983 [21][25] | †£68,348,000 [21] |
Hermione F58 | 11 July 1969 [5] | Chatham/Devonport [19][21][28] | 14 January 1980 [21][22][27] | January 1983 [27] | 8 December 1983 [21][25] | †£79,692,000 [21] |
Scylla F71 | 12 February 1970 [5] | Devonport [19][21][25] | 10 November 1980 [21][22][27] | September 1983 [27] | December 1984 [25] | †£79,278,000 [21] |
† = Latest estimate as at 14 December 1983.[21]
Batch 2 TA & Batch 1B - towed array conversions
In 1981 the Admiralty said that they intended to devote "substantial resources to improving the effectiveness of the sensors and anti-submarine weapons ... This includes the new passive towed array system that we hope to introduce into service next year."[29]
The former destroyer Matapan and the frigate Lowestoft were used for testing prototypes in 1978–81.[30] It was planned to install them on Rothesay conversions, but this was not possible due to industrial strikes.[30] Scheduling then made it easier to fit them on board four of the Batch II Leanders. "Compensation for the additional 70 tons of top weight included lowering the Exocet launchers. This interesting quartet was to have been followed by five Batch III Leanders, but the latter fell foul of the Nott cancellations. A fifth Leander, the Ikara-carrying HMS Arethusa, was fitted with a towed array in 1985, the year the towed-array trials ship Lowestoft was withdrawn from service."[30]
Admiral Sir Julian Oswald said to the Defence Committee in 1989, "in order to capitalise on the really very exciting and important development of towed arrays, we had to get them to sea as soon as we could. The only sensible, cost-effective option open to us was to take some relatively older ships - the Leanders - and convert them quickly to the towed array. We have done that with great success, and the peacetime patrols have achieved some remarkable results, but there has been a price to pay because of the age of those ships."[31]
In general, "as a ship gets older it tends to get noisier - the hull and also the propulsion system".[32] At the same Defence Committee meeting, Oswald spoke "to counter the presumption that older ships get noisier. That is not necessarily true and it is not true, in my experience, in the case of the Leanders because understanding of ship generated noise is improving all the time and our techniques for countering it are improving - our noise monitoring and so on - so, despite the fact that these ships are getting older, they are in many cases managing to improve their performance with regard to ship noise."[33] Captain Geoffrey Biggs said "the Leanders are remarkably quiet in operation and our experience has been that they have made excellent towed-array platforms despite the rather short notice of actually getting the towed-array programme together to start with. They actually perform very well."[33]
Five ships were converted to use Waverley Type 2031(I) towed array (passive search very low frequency). They were as follows:[34]
Pennant | Name | Commissioned | Refit when towed array fitted | ||||
---|---|---|---|---|---|---|---|
Started | Completed | ||||||
Batch 2A Exocet Leander (Batch 2TA) | |||||||
F42 | Phoebe | 15 April 1966 [5] | February 1981 [35] | July 1982 [35] | |||
F28 | Cleopatra | 4 January 1966 [5] | January 1982 [35] | April 1983 [35] | |||
F56 | Argonaut | 17 August 1967 [5] | August 1982 [35] | November 1983 [35] | |||
F40 | Sirius | 15 June 1966 [5] | April 1985 [35] | December 1985 [35] | |||
Batch 1B Ikara Leander | |||||||
F38 | Arethusa | 24 November 1965 [5] | May 1985 [35] | February 1986 [35] | |||
Royal Navy service
The ships performed excellently in Royal Navy service, with relatively low noise levels giving the 2031(I) towed sonar mounted during the 1970s a range of more than 100 miles, better than that of the more advanced 2031(Z) sonar when fitted in the Type 22 class. However, all Leanders in Royal Navy service were decommissioned by the early 1990s due to the ships' aging design and the high number of crew. Scylla was sunk 27 March 2004 as an artificial reef off Cornwall, ten years after her decommissioning in 1994.
Running costs
Period | Running cost | What is included |
---|---|---|
1972–73 | £250,000[36] | Average annual maintenance cost per vessel for Leander-class frigates |
1980–81 | £6 million[37] | Average current cost for a normal refit of a Leander class frigate. |
1981–82 | £6.8 million [38] | "at average 1981–82 prices and including associated aircraft costs but excluding the costs of major refits." |
1985–86 | £6.5 million[39] | The average cost of running and maintaining a Leander-class frigate for one year. |
1987–88 | £3.8 million[40] | The average annual operating costs, at financial year 1987–88 prices of a Leander-class frigate.
These costs include personnel, fuel, spares and so on, and administrative support services, but exclude new construction, capital equipment, and refit-repair costs. |
Overseas service
Leander-class frigates were also successfully exported to serve in the Royal New Zealand Navy and Chilean Navy; in the latter they were designated as the Condell class. Further frigates were modelled on the Leander-class frigates and were built under licence in Australia as the River class for the Royal Australian Navy, India as the Nilgiri class and the Netherlands as the Van Speijk class. Royal Navy ships were sold to the navies of Chile, Ecuador, New Zealand (Bacchante becoming HMNZS Wellington and Dido becoming HMNZS Southland), India and Pakistan.
Indonesia ex-Van Speijk class are still in service. Pakistan decommissioned the last of its Leander-class frigates, Zulfiqar, in January 2007,[41] India decommissioned her last Leander on 24 May 2012.[42]
HMNZS Canterbury, the last steam-turbine driven Leander-class frigate in the Royal New Zealand Navy, was decommissioned in Auckland on 31 March 2005 after 33 years operational service. In 2006 it was announced that the ship was to be sunk as a dive attraction in the Bay of Islands, and this was carried out on 3 November 2007 at Deep Water Cove.
Fate
- Royal Navy
Pennant | Name | Commissioned | Major refits | Fate | ||||
---|---|---|---|---|---|---|---|---|
Batch 1 (Ikara conversion) | ||||||||
F109 | Leander | 27 March 1963 [3] | Sunk as target 1989 | |||||
F104 | Dido | 18 September 1963 [3] | To New Zealand as HMNZS Southland 1983, paid off 1995 and sold for scrap. Towed to the Philippines to have her boilers removed for a rubber plantation. Then towed to Goa Beach, India, for scrapping. | |||||
F114 | Ajax | 10 December 1963 [3] | Scrapped 1988 | |||||
F10 | Aurora | 9 April 1964 [5] | Scrapped 1990 | |||||
F18 | Galatea | 25 April 1964 [5] | Sunk as target 1988 | |||||
F15 | Euryalus | 16 September 1964 [5] | Sold for scrap 1990 | |||||
F39 | Naiad | 15 March 1965 [5] | Sunk as target 1990 | |||||
F38 | Arethusa | 24 November 1965 [5] | Sunk as target 1991 | |||||
Batch 2 (Exocet conversion) | ||||||||
F127 | Penelope | 31 October 1963 [3] | To Ecuador 1991 as Presidente Eloy Alfaro and subsequently scrapped. | |||||
F28 | Cleopatra | 4 January 1966 [5] | Sold for scrap 1993 | |||||
F42 | Phoebe | 15 April 1966 [5] | Sold for scrap 1992 | |||||
F45 | Minerva | 14 May 1966 [5] | Sold for scrap 1993 | |||||
F40 | Sirius | 15 June 1966 [5] | Sunk as target 1998 | |||||
F56 | Argonaut | 17 August 1967 [5] | Sold for scrap 1995 | |||||
F47 | Danae | 7 September 1967 [5] | To Ecuador 1991 as Morán Valverde.[43] She was decommissioned in 2008, and put up for sale in December 2009 and scrapped 2010/11 in Andec Dock, Ecuador.[43] | |||||
Batch 2 | ||||||||
F52 | Juno | 18 July 1967 [5] | Sold for scrap 1994 | |||||
Batch 3A / broad-beamed Leander (Sea Wolf conversion) | ||||||||
F75 | Charybdis | 2 June 1969 [5] | Sunk as target 1993 | |||||
F58 | Hermione | 11 July 1969 [5] | Sold for scrap 1997 | |||||
F60 | Jupiter | 9 August 1969 [5] | Sold for scrap 1997 | |||||
F57 | Andromeda | 2 December 1968 [5] | To India 1995 as training ship, Krishna. Decommissioned 24 May 2012.[42] | |||||
F71 | Scylla | 12 February 1970 [5] | Sunk as artificial reef off Whitsand Bay 2004 | |||||
Batch 3B / broad-beamed Leander | ||||||||
F69 | Bacchante | 17 October 1969 [5] | To New Zealand 1982 as Wellington, sunk as artificial reef in Cook Strait 2005 | |||||
F12 | Achilles | 9 July 1970 [5] | To Chile 1990 as Ministro Zenteno, in reserve from 2006. Washed out to sea by a tsunami and scuttled, 2010 | |||||
F16 | Diomede | 2 April 1971 [5] | Extensive refit between 1991 and 1993.[41] | To Pakistan 1988 as Shamsher, retired pre-2007 to salvage spare parts for Zulfiqar.[44] | ||||
F70 | Apollo | 28 May 1972 [5] | Extensive refit between 1991 and 1993.[41] | To Pakistan 1988 as Zulfiquar, retired from Pakistani service 4 January 2007.[41] Sunk as target 12 March 2010 | ||||
F72 | Ariadne | 10 February 1973 [5] | To Chile 1992 as General Baquedano, sunk as target 2004 |
In Media
The 1988 novel Medusa by Hammond Innes features a fictional Leander class frigate, HMS Medusa which is used to foil a Soviet takeover of Majorca.
See also
- Whitby-class frigate, the original Type 12 frigate.
- Rothesay-class frigate, the preceding Type 12M frigate.
- Warship, a BBC television drama series.
Notes
References
- ↑ Postwar Frigates
- ↑ Hansard HC Deb 07 March 1960 vol 619 cc39-200 Navy Estimates 1960–61, statement by the Civil Lord of the Admiralty (Mr. C. Ian Orr-Ewing), 7 March 1960.
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Blackman, Raymond VB, Jane's Fighting Ships, 1963–64, pub Sampson Low Marston & Co Ltd, 1963, page 270.
- ↑ "Unit cost, i.e. excluding cost of certain items (e.g. aircraft, First Outfits)."
Text from Defences Estimates - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 Moore, John E, Jane's Fighting Ships, 1975–76, pub Macdonald and Jane's, 1975, ISBN 0-354-00519-7 pages 35405.
- 1 2 3 Navy Estimates, 1963–64, page 71, Table 3 (Programme): List and particulars of new ships which have been accepted or are expected to be accepted into HM service during the Financial Year ended 31 March 1963
- 1 2 3 4 5 6 7 8 9 10 11 12 13 Defence Estimates, 1964–65, page 73, Table 3 (Programme): List and particulars of new ships which have been accepted or are expected to be accepted into HM service during the Financial Year ended 31 March 1964
- 1 2 3 4 5 6 7 8 9 10 11 12 Defence Estimates, 1965–66, page 75, Table 3 (Programme): List and particulars of new ships which have been accepted or are expected to be accepted into HM service during the Financial Year ended 31 March 1965
- 1 2 3 4 5 6 Defence Estimates, 1966–67, page 72, Table 3 (Programme): List and particulars of new ships which have been accepted or are expected to be accepted into HM service during the Financial Year ended 31 March 1966
- ↑ Jane's Fighting Ships 1963–64 edition said that Arethus was laid down on 17 September 1964, however the 1975–76 edition says that she was laid down on 7 September 1964.
- 1 2 3 4 5 6 7 8 9 Defence Estimates, 1967–68, page 75, Table 3 (Programme): List and particulars of new ships which have been accepted or are expected to be accepted into HM service during the Financial Year ended 31 March 1967
- 1 2 3 4 5 6 7 8 9 Defence Estimates, 1968–69, page 75, Table 3 (Programme): List and particulars of new ships which have been accepted or are expected to be accepted into HM service during the Financial Year ended 31 March 1968
Note that the costs quoted in the Defence Estimates are slightly different from costs quoted by the Minister of State (Mr. John Morris) - see Hansard HC Deb 26 March 1969 vol 780 c302W Question to the Secretary of State for Defence how the cost of Leander-class frigates built in the Royal Dockyards compares with that of those built in commercial shipyards.Danae £5,720,000 (Defence Estimates) £5,830,000 (Hansard 26 March 1969) Juno £5,020,000 (Defence Estimates) £5,000,000 (Hansard 26 March 1969) Argonaut £5,000,000 (Defence Estimates) £5,000,000 (Hansard 26 March 1969) - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Defence Estimates, 1970–71, page XII-81, Table V: List and particulars of new ships which have been accepted or are expected to be accepted into HM service during the Financial Year ended 31 March 1970
- 1 2 3 Defence Estimates, 1969–70, page 75, Table 3 (Programme): List and particulars of new ships which have been accepted or are expected to be accepted into HM service during the Financial Year ended 31 March 1969
- 1 2 3 Defence Estimates, 1971–72, page XII-81, Table V: List and particulars of new ships which have been accepted or are expected to be accepted into HM service during the Financial Year ended 31 March 1971
- 1 2 3 Defence Estimates, 1972–73, page XII-92, Table V: List and particulars of new ships which have been accepted or are expected to be accepted into HM service during the Financial Year ended 31 March 1972
- 1 2 3 4 5 6 Defence Estimates, 1973–74, page XII-96, Table V: List and particulars of new ships which have been accepted or are expected to be accepted into HM service during the Financial Year ended 31 March 1973
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Marriott, Leo, Royal Navy Frigates since 1945 second edition , pub Ian Allan Ltd, 1990, ISBN 0-7110-1915-0 page 87.
Note that Marriott gives slightly different dates than Hansard (6 July 1981) for the completion of the following refits:Leander Dec 1972 (Marriott) Jan 1973 (Hansard) Ajax Sep 1973 (Marriott) Feb 1974 (Hansard) Aurora Mar 1976 (Marriott) Feb 1976 (Hansard) Naiad Jul 1975 (Marriott) Jun 1975 (Hansard) - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hansard HC Deb 06 July 1981 vol 8 c47W Question to the Secretary of State for Defence which frigates are now undergoing major refits; at which dockyards; when they commenced; and when they are planned to be completed.
- 1 2 3 Hansard HC Deb 14 December 1983 vol 50 c473W The phrase used in Hansard was Outturn.
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 Hansard HC Deb 14 December 1983 vol 50 c473W] Refit dates and costs for Leander-class frigates, 14 December 1983.
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Royal Navy Postwar: Leander Class General Purpose Frigate (Type 12 Improved)
Note that this source says that Penelope started her Exocet conversion in January 1978, which agrees with Hansard (14 December 1983), which says 30 January 1978, but disagrees with Hansard (6 July 1981) recorded that Penelope started her conversion in June 1978. It also gives a different start date for Arethusa - October 1973, whereas Hansard (14 December 1983) quotes 10 September 1973 It gives a different start date for Andromeda - March 1978, whereas Hansard (14 December 1983) quotes 3 January 1978. - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Marriott, Leo, Royal Navy Frigates since 1945 second edition , pub Ian Allan Ltd, 1990, ISBN 0-7110-1915-0 page 90.
Note that Marriott gives slightly different dates than Hansard (6 July 1981) or Hansard 14 Dec 1983 for the completion of the following refits:
Cleopatra Nov 1975 (Marriott) Dec 1975 (Hansard 6 July 1981) Sirius Oct 1977 (Marriott) Feb 1978 (Hansard 6 July 1981) Minerva Mar 1979 (Marriott) Apr 1979 (Hansard 6 July 1981) Danae Sep 1980 (Marriott) Apr 1981 (Hansard 6 July 1981) Penelope Mar 1981 (Marriott) 15 January 1982 (Hansard 14 December 1983) - ↑ Hansard HC Deb 14 July 1987 vol 119 cc437-40W Question to the Secretary of State for Defence asking for a list by class the destroyers and frigates presently 438W serving in the Royal Navy showing for each vessel the current age and the dates between which they have undergone major refits, 14 July 1987.
- 1 2 3 4 5 6 7 8 9 10 Marriott, Leo, Royal Navy Frigates since 1945 second edition , pub Ian Allan Ltd, 1990, ISBN 0-7110-1915-0 page 92.
There are also some differences between Marriott and Hansard on the following completion dates:Andromeda December 1980 (Marriott) February 1981 (Hansard 6 July 1981) Charybdis August 1982 (Marriott) 16 July 1982 (Hansard 14 December 1983) Hermione June 1983 (Marriott) 8 December 1983 (Hansard 14 December 1983) - ↑ Marriott, Leo, Royal Navy Frigates since 1945 second edition , pub Ian Allan Ltd, 1990, ISBN 0-7110-1915-0 page 92 says that she paid off in January 1978.
- 1 2 3 4 5 6 7 8 Hansard HC Deb 06 July 1981 vol 8 c47W Question to the Secretary of State for Defence which frigates are now undergoing major refits; at which dockyards; when they commenced; and when they are planned to be completed.
Hansard HC Deb 30 November 1981 vol 14 c23W Question to the Secretary of State for Defence asking how many Leander-class frigates are undergoing modernising refits at an estimated unit cost equal to or exceeding the figure of £70 million, 30 November 1981.
The answers given on 6 July and 30 November 1981 for the start and forecast completion times for Jupiter, Scylla, Charybdis, and Hermione are identical, except that on 6 July 1981, it was stated that Charybdis was forecast to complete in June 1983, and on 30 November, it was stated that she was forecast to complete in June 1982. - ↑ Marriott puts Hermiones Seawolf conversion at Devonport, whereas 6 July 1981, Hansard puts it at Chatham.
- ↑ "Hansard HC Deb 22 July 1981 vol 9 cc326-409 Debate on the Royal Navy". 22 July 1981.
- 1 2 3 Friedman, Norman (2006). British Destroyers and Frigates, the Second World War and After. Seaforth. p. 302. ISBN 978-1-84832-015-4.
- ↑ Defence Committee, sixth report, The Royal Navy's Surface Fleet: Current Issues - report, together with the proceedings of the committee, minutes of evidence and memoranda, pub HMSO, 21 June 1989, minutes of evidence pages 12–13.
- ↑ Defence Committee, sixth report, The Royal Navy's Surface Fleet: Current Issues - report, together with the proceedings of the committee, minutes of evidence and memoranda, pub HMSO, 21 June 1989, minutes of evidence page 3, remarks by former naval officer Jonathan Sayeed MP.
- 1 2 Defence Committee, sixth report, The Royal Navy's Surface Fleet: Current Issues - report, together with the proceedings of the committee, minutes of evidence and memoranda, pub HMSO, 21 June 1989, minutes of evidence page 3.
- ↑ Sharpe, Richard Jane's Fighting Ships 1988–89, pub Jane's Publishing Company Ltd, 1988, ISBN 978-0-7106-0858-1, page 660 lists five ships as having Type 2031Z towed arrays: Arethusa, Cleopatra, Sirius, Phoebe, and Argonaut. The last four were described by Jane's as "Batch 2TA".
Defence Committee, sixth report, The Royal Navy's Surface Fleet: Current Issues - report, together with the proceedings of the committee, minutes of evidence and memoranda, pub HMSO, 21 June 1989, page xviii lists four Exocet Leanders described as Batch 2A: Cleopatra, Sirius, Phoebe, and Argonaut. "Batch 2A are fitted with towed array sonar." - 1 2 3 4 5 6 7 8 9 10 Marriott, Leo, Royal Navy Frigates since 1945 second edition , pub Ian Allan Ltd, 1990, ISBN 0-7110-1915-0 page 98 lists which year the Leanders completed the refits in which the towed array was fitted.
Friedman, Norman, British Destroyers and Frigates, the Second World War and After, pub Seaforth, 2006, ISBN 978-1-84832-015-4 page 302 says that the prototype Type 2031 was installed on Cleopatra, the conversion beginning in 1980, and that Arethusa's towed array was fitted in 1985.
Hansard (22 July 1981) made it clear that towed-arrays were not in service in 1981, but that it was intended to introduce them into service in 1982.
Hansard HC Deb 14 July 1987 vol 119 cc437-40W contains a list of all the refits by the Leanders up to 14 July 1987.Ship Year completed refit
(Marriott)Year fitted or started fitting
(Friedman)Dates of refits 1979–87
(Hansard {14 Jul 1987})Phoebe 1982 Refit
Feb 1981 - Jul 1982Refit
May 1986 - Feb 1987Argonaut 1983 Major refit
Feb 1976 - Mar 1980Refit
Aug 1982 - Nov 1983Cleopatra 1984 1980 Refit
Oct 1978 - May 1979Refit
Jan 1982 - Apr 1983Refit
Mar 1987 - unknownSirius 1985 Refit
May 1981 - Jul 1982Refit
Apr 1985 - Dec 1985.Arethusa Not stated 1985 Refit
May 1980 - Mar 1981Comparator refit
May 1985 - Feb 1986 - ↑ Hansard HC Deb 16 December 1974 vol 883 c316W Question to the Secretary of State for Defence about the approximate annual average refit cost per vessel for (a) a County class destroyer and (b) a Leander class frigate, 16 December 1974.
- ↑ Hansard HC Deb 09 June 1981 vol 6 c121W Question to the Secretary of State for Defence about the cost of (a) a mid-life and (b) a normal refit for a Leander class frigate, 9 June 1981.
- ↑ Hansard HC Deb 16 July 1982 vol 27 cc485-6W Question to the Secretary of State for Defence, 16 July 1982.
- ↑ Hansard HC Deb 22 January 1987 vol 108 c730W Question to the Secretary of State for Defence, 22 January 1987.
- ↑ Hansard HC Deb 10 March 1989 vol 148 c44W Question to the Secretary of State for Defence, 10 March 1989.
- 1 2 3 4 http://www.globalsecurity.org/military/world/pakistan/f-shamsher.htm
- 1 2 "INS Krishna, one of Indian Navy's 1st Training Squadron Ships, decommissioned". kemmannu.com. Retrieved 28 May 2012.
- 1 2 Expreso, 1 December 2009, Marina subastará el Morán Valverde Archived 3 December 2009 at the Wayback Machine
- ↑ http://www.ordersofbattle.darkscape.net/site/history/volume4/432/pn%20frigates%203C.htm
Bibliography
- The Encyclopedia of Warships, From World War Two to the Present Day, General Editor Robert Jackson
- Modern Combat Ships 1: Leander Class, by Commander C.J. Meyer OBE, RN
- Leander Class Frigates, by Jim Allaway
- Leander Class Frigates, by Richard Osborne and David Sowdon
External links
- Archived comprehensive website on the design and history of the Leander class and related frigate designs
- Leander (Type 12) class frigate website
- Hazegray.org on the Leander class
- An unofficial Leander Class Frigate Site
- British Film Institute site on Warship
- Royal Navy leaflet on Warship, from the HMS Phoebe Association website
- Comments on Warship by series Director Michael Briant
- Webpage (at Home > Scriptwriting > Warship) about Michael J Bird's scripts for Warship
- HMS Phoebe Association website
- HMS Danae website (all commissions)
- HMS Danae website (first commission)
- HMS Dido Association website
- HMS Jupiter Association website
- HMS Hermione Association website
- HMS Naiad Association website (all commissions)
- Postwar Frigates website, retrieved 2010-10-12
|