Runway

This article is about the aircraft takeoff and landing area. For other uses, see Runway (disambiguation).
"Landing strip" and "RWY" redirect here. For the pubic hairstyle, see Bikini waxing. For the audio/video connectors, see RCA connector.
A runway at Brussels Airport
FAA airport diagram at O'Hare International Airport. From left to right, runways 14/32 slant down, runways 4/22 slant up, runways 9R/27L, 9L/27R and 10/28 are horizontal.

According to the International Civil Aviation Organization (ICAO), a runway is a "defined rectangular area on a land aerodrome prepared for the landing and takeoff of aircraft". Runways may be a man-made surface (often asphalt, concrete, or a mixture of both) or a natural surface (grass, dirt, gravel, ice, or salt).

Naming

Runway 22

Runways are named by a number between 01 and 36, which is generally the magnetic azimuth of the runway's heading in decadegrees. This heading differs from true north by the local magnetic declination. A runway numbered 09 points east (90°), runway 18 is south (180°), runway 27 points west (270°) and runway 36 points to the north (360° rather than 0°).[1] When taking off from or landing on runway 09, a plane would be heading 90° (east).

A runway can normally be used in both directions, and is named for each direction separately: e.g., "runway 33" in one direction is "runway 15" when used in the other. The two numbers usually differ by 18 (= 180°).

If there is more than one runway pointing in the same direction (parallel runways), each runway is identified by appending Left (L), Center (C) and Right (R) to the number to identify its position (when facing its direction) — for example, Runways One Five Left (15L), One Five Center (15C), and One Five Right (15R). Runway Zero Three Left (03L) becomes Runway Two One Right (21R) when used in the opposite direction (derived from adding 18 to the original number for the 180 degrees when approaching from the opposite direction). In some countries, if parallel runways are too close to each other, regulations mandate that only one runway may be used at a time under certain conditions (usually adverse weather).

At large airports with four or more parallel runways (for example, at Los Angeles, Detroit Metropolitan Wayne County, Hartsfield-Jackson Atlanta, Denver, Dallas-Fort Worth and Orlando) some runway identifiers are shifted by 10 degrees to avoid the ambiguity that would result with more than three parallel runways. For example, in Los Angeles, this system results in runways 6L, 6R, 7L, and 7R, even though all four runways are actually parallel (approximately 69 degrees). At Dallas/Fort Worth International Airport, there are five parallel runways, named 17L, 17C, 17R, 18L, and 18R, all oriented at a heading of 175.4 degrees. Occasionally, an airport with only 3 parallel runways may use different runway identifiers, for example when a third parallel runway was opened at Phoenix Sky Harbor International Airport in 2000 to the south of existing 8R/26L, rather than confusingly becoming the "new" 8R/26L it was instead designated 7R/25L, with the former 8R/26L becoming 7L/25R and 8L/26R becoming 8/26.

For clarity in radio communications, each digit in the runway name is pronounced individually: runway three six, runway one four, etc. A leading zero, for example in "runway zero six" or "runway zero one left", is included for all ICAO and some U.S. military airports (such as Edwards Air Force Base). However, most U.S. civil aviation airports drop the leading zero as required by FAA regulation.[2] This also includes some military airfields such as Cairns Army Airfield. This American anomaly may lead to inconsistencies in conversations between American pilots and controllers in other countries. It is very common in a country such as Canada for a controller to clear an incoming American aircraft to, for example, runway 04, and the pilot read back the clearance as runway 4. In flight simulation programs those of American origin might apply U.S. usage to airports around the world. For example, runway 05 at Halifax will appear on the program as the single digit 5 rather than 05.

Runway sign at Madrid-Barajas Airport, Spain

Runway designations change over time because the magnetic poles slowly drift on the Earth's surface and the magnetic bearing will change. Depending on the airport location and how much drift takes place, it may be necessary over time to change the runway designation. As runways are designated with headings rounded to the nearest 10 degrees, this will affect some runways more than others. For example, if the magnetic heading of a runway is 233 degrees, it would be designated Runway 23. If the magnetic heading changed downwards by 5 degrees to 228, the Runway would still be Runway 23. If on the other hand the original magnetic heading was 226 (Runway 23), and the heading decreased by only 2 degrees to 224, the runway should become Runway 22. Because the drift itself is quite slow, runway designation changes are uncommon, and not welcomed, as they require an accompanying change in aeronautical charts and descriptive documents. When runway designations do change, especially at major airports, it is often changed at night as taxiway signs need to be changed and the huge numbers at each end of the runway need to be repainted to the new runway designators. In July 2009 for example, London Stansted Airport in the United Kingdom changed its runway designations from 05/23 to 04/22 during the night.

For fixed-wing aircraft it is advantageous to perform takeoffs and landings into the wind to reduce takeoff or landing roll and reduce the ground speed needed to attain flying speed. Larger airports usually have several runways in different directions, so that one can be selected that is most nearly aligned with the wind. Airports with one runway are often constructed to be aligned with the prevailing wind. Compiling a wind rose is in fact one of the preliminary steps taken in constructing airport runways.[3] Note that wind direction is given as the direction the wind is coming from: a plane taking off from runway 09 would be facing east, directly into an "east wind" blowing from 090 degrees.

Declared distances

Runway dimensions vary from as small as 245 m (804 ft) long and 8 m (26 ft) wide in smaller general aviation airports, to 5,500 m (18,045 ft) long and 80 m (262 ft) wide at large international airports built to accommodate the largest jets, to the huge 11,917 m × 274 m (39,098 ft × 899 ft) lake bed runway 17/35 at Edwards Air Force Base in California – a landing site for the retired Space Shuttle.[4]

Takeoff and landing distances available are given using one of the following terms:

TORA[5]
Takeoff Run Available – The length of runway declared available and suitable for the ground run of an airplane taking off.[6]

TODA[5]
Takeoff Distance Available – The length of the takeoff run available plus the length of the clearway, if clearway is provided.[6]
(The clearway length allowed must lie within the aerodrome or airport boundary. According to the Federal Aviation Regulations and Joint Aviation Requirements (JAR) TODA is the lesser of TORA plus clearway or 1.5 times TORA).

ASDA[5]
Accelerate-Stop Distance Available – The length of the takeoff run available plus the length of the stopway, if stopway is provided.[6]
LDA[5]
Landing Distance Available – The length of runway that is declared available and suitable for the ground run of an airplane landing.[7]
EMDA [8]
Emergency Distance Available – LDA (or TORA) plus a stopway.

Sections of a runway

There are runway markings.[9]

Runway markings

There are runway markings and signs on most large runways. Larger runways have a distance remaining sign (black box with white numbers). This sign uses a single number to indicate the thousands of feet remaining, so 7 will indicate 7,000 ft (2,134 m) remaining. The runway threshold is marked by a line of green lights.

There are three types of runways:

National variants

Runway lighting

History

A runway landing light from 1945

The first runway lighting appeared in 1930 at Cleveland Municipal Airport (now known as Cleveland Hopkins International Airport) in Cleveland, Ohio. A line of lights on an airfield or elsewhere to guide aircraft in taking off or coming in to land or an illuminated runway is sometimes also known as a Flare Path.

Technical specifications

Night runway view from A320 cockpit
Ground light at Bremen Airport

Runway lighting is used at airports that allow night landings. Seen from the air, runway lights form an outline of the runway. A particular runway may have some or all of the following:[13]

According to Transport Canada's regulations,[14] the runway-edge lighting must be visible for at least 2 mi (3 km). Additionally, a new system of advisory lighting, runway status lights, is currently being tested in the United States.[15]

The edge lights must be arranged such that:

Control of lighting system

Typically the lights are controlled by a control tower, a flight service station or another designated authority. Some airports/airfields (particularly uncontrolled ones) are equipped with pilot-controlled lighting, so that pilots can temporarily turn on the lights when the relevant authority is not available.[17] This avoids the need for automatic systems or staff to turn the lights on at night or in other low visibility situations. This also avoids the cost of having the lighting system on for extended periods. Smaller airports may not have lighted runways or runway markings. Particularly at private airfields for light planes, there may be nothing more than a windsock beside a landing strip.

Runway safety

Main article: Runway safety

Types of runway safety incidents include:

Pavement

Runway surface at Congonhas Airport in São Paulo, Brazil. The grooves increase friction and reduce the risk of hydroplaning.

The choice of material used to construct the runway depends on the use and the local ground conditions. For a major airport, where the ground conditions permit, the most satisfactory type of pavement for long-term minimum maintenance is concrete. Although certain airports have used reinforcement in concrete pavements, this is generally found to be unnecessary, with the exception of expansion joints across the runway where a dowel assembly, which permits relative movement of the concrete slabs, is placed in the concrete. Where it can be anticipated that major settlements of the runway will occur over the years because of unstable ground conditions, it is preferable to install asphaltic concrete surface, as it is easier to patch on a periodic basis. For fields with very low traffic of light planes, it is possible to use a sod surface. Some runways also make use of salt flat runways.

For pavement designs, borings are taken to determine the subgrade condition, and based on the relative bearing capacity of the subgrade, the specifications are established. For heavy-duty commercial aircraft, the pavement thickness, no matter what the top surface, varies from 10 in (250 mm) to 4 ft (1 m), including subgrade.

Airport pavements have been designed by two methods. The first, Westergaard, is based on the assumption that the pavement is an elastic plate supported on a heavy fluid base with a uniform reaction coefficient known as the K value. Experience has shown that the K values on which the formula was developed are not applicable for newer aircraft with very large footprint pressures.

The second method is called the California bearing ratio and was developed in the late 1940s. It is an extrapolation of the original test results, which are not applicable to modern aircraft pavements or to modern aircraft landing gear. Some designs were made by a mixture of these two design theories. A more recent method is an analytical system based on the introduction of vehicle response as an important design parameter. Essentially it takes into account all factors, including the traffic conditions, service life, materials used in the construction, and, especially important, the dynamic response of the vehicles using the landing area.

Because airport pavement construction is so expensive, manufacturers aim to minimize aircraft stresses on the pavement. Manufacturers of the larger planes design landing gear so that the weight of the plane is supported on larger and more numerous tires. Attention is also paid to the characteristics of the landing gear itself, so that adverse effects on the pavement are minimized. Sometimes it is possible to reinforce a pavement for higher loading by applying an overlay of asphaltic concrete or portland cement concrete that is bonded to the original slab. Post-tensioning concrete has been developed for the runway surface. This permits the use of thinner pavements and should result in longer concrete pavement life. Because of the susceptibility of thinner pavements to frost heave, this process is generally applicable only where there is no appreciable frost action.

Pavement surface

Runway pavement surface is prepared and maintained to maximize friction for wheel braking. To minimize hydroplaning following heavy rain, the pavement surface is usually grooved so that the surface water film flows into the grooves and the peaks between grooves will still be in contact with the aircraft tires. To maintain the macrotexturing built into the runway by the grooves, maintenance crews engage in airfield rubber removal or hydrocleaning in order to meet required FAA friction levels.

Surface type codes

The grass airstrip on the Badminton estate, Badminton, South Gloucestershire, England. The strip is very simple—no lighting, no centreline and no approach aids. The edge is marked by simple posts.

In aviation charts, the surface type is usually abbreviated to a three-letter code.

The most common hard surface types are asphalt and concrete. The most common soft surface types are grass and gravel.

* ASP Asphalt
* BIT Bitumenous asphalt or tarmac
* BRI Bricks (no longer in use, covered with asphalt or concrete now)
* CLA Clay
* COM Composite
* CON Concrete
* COP Composite
* COR Coral (coral reef structures)
* GRE Graded or rolled earth, grass on graded earth
* GRS Grass or earth not graded or rolled
* GVL Gravel
* ICE Ice
* LAT Laterite
* MAC Macadam
* PEM Partially concrete, asphalt or bitumen-bound macadam
* PER Permanent surface, details unknown
* PSP Marsden Matting (derived from pierced/perforated steel planking)
* SAN Sand
* SMT Sommerfeld Tracking
* SNO Snow
* U Unknown surface

Water runways do not have a type code as they do not have physical markings, and are thus not registered as specific runways.

Runway length

In the 1980s, Leeds Bradford International Airport extended its runway to take wide bodied planes by building a flyover across the A658 dual carriageway.

A runway of at least 6,000 ft (1,829 m) in length is usually adequate for aircraft weights below approximately 200,000 lb (90,718 kg). Larger aircraft including widebodies will usually require at least 8,000 ft (2,438 m) at sea level and somewhat more at higher altitude airports. International widebody flights, which carry substantial amounts of fuel and are therefore heavier, may also have landing requirements of 10,000 ft (3,048 m) or more and takeoff requirements of 13,000 ft (3,962 m).

At sea level, 10,000 ft (3,048 m) can be considered an adequate length to land virtually any aircraft. For example, at O'Hare International Airport, when landing simultaneously on 4L/22R and 10/28 or parallel 9R/27L, it is routine for arrivals from East Asia, which would normally be vectored for 4L/22R (7,500 ft (2,286 m)) or 9R/27L (7,967 ft (2,428 m)) to request 28R (13,001 ft (3,963 m)). It is always accommodated, although occasionally with a delay. Another example is that the Luleå Airport in Sweden was extended to 10,990 ft (3,350 m) to allow any fully loaded freight aircraft to take off.

An aircraft will need a longer runway at a higher altitude due to decreased density of air at higher altitudes, which reduces lift and engine power, the former requiring higher takeoff and landing speed. An aircraft will also require a longer runway in hotter or more humid conditions (see density altitude). Most commercial aircraft carry manufacturer's tables showing the adjustments required for a given temperature.

The world's longest paved runway, at Qamdo Bamda Airport in Tibet, has a total length of 5,500 m (18,045 ft).

See also

Wikimedia Commons has media related to Runway.

References

  1. Federal Aviation Administration Aeronautical Information Manual, Chapter 2, Section 3 Airport Marking Aids and Signs part 3b
  2. "FAA Advisory Circular AC 150/5340-1L - Standards for Airport Markings".
  3. Retrieved on 2012-02-24.
  4. Edwards AFB Rogers Lakebed Airport Diagram (PDF), effective 4 Feb 2016. Federal Aviation Administration.
  5. 1 2 3 4 5 "Order JO 7340.1Z: Contractions" (PDF). Federal Aviation Administration. March 15, 2007.
  6. 1 2 3 Airplanes: Turbine engine powered: Takeoff limitations, retrieved 2009-10-04
  7. Airplanes: Turbine engine powered: Landing limitations: Destination airports, retrieved 2009-10-04
  8. Swatton, Peter J. (2000). Aircraft Performance Theory for Pilots (illustrated, reprint ed.). Oxford, United Kingdom: Blackwell Science Ltd. p. vii. ISBN 0632055693. Retrieved 12 February 2015.
  9. FAA AC 150/5340-1L – Standards for Airport Markings pages 13 and following
  10. http://128.173.204.63/courses/cee4674/cee4674_pub/markings_airports_rev.pdf
  11. Pilot's Handbook of Aeronautical Knowledge FAA-H-8083-25A, p. 306
  12. CAP637, Visual aids handbook, chapter 2, page 3, Issue 2, May 2007, Civil Aviation Authority
  13. 1 2 3 4 "Aerodrome Design and Operations" (PDF) (3 ed.). July 1999.
  14. "§7.8 Runway Lighting". TP 14371: Transport Canada Aeronautical Information Manual.
  15. FAA Installs Runway Safety Warning System at LAX, retrieved 2010-05-14
  16. Transport Canada Aeronautical Information Manual
  17. "§7.18 Aircraft Radio Control of Aerodrome Lighting". TP 14371: Transport Canada Aeronautical Information Manual.

External links

Look up runway in Wiktionary, the free dictionary.
This article is issued from Wikipedia - version of the Saturday, December 26, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.