Iuka (YTB-819)
For other ships of the same name, see USS Iuka.
History | |
---|---|
Awarded: | 9 August 1971 |
Builder: | Marinette Marine |
Laid down: | 20 September 1972 |
Launched: | 12 April 1973 |
Acquired: | 17 May 1973 |
In service: | 1973 |
Out of service: | 1995 |
Struck: | 19 October 1995 |
Fate: | Transferred to Other Government Agency 21 March 1996 |
General characteristics | |
Class & type: | Natick-class large harbor tug |
Displacement: |
|
Length: | 108 ft (33 m) |
Beam: | 29 ft (8.8 m) |
Draft: | 14 ft (4.3 m) |
Propulsion: | One diesel propulsion engine, 2000 HP |
Speed: | 12 knots (14 mph; 22 km/h) |
Complement: | 12 |
Armament: | None |
Iuka (YTB-819) was a United States Navy Natick-class large harbor tug.
Construction
The contract for Iuka was awarded 9 August 1971. She was laid down on 20 September 1972 at Marinette, Wisconsin, by Marinette Marine and launched 12 April 1973.[1]
Operational history
Stricken from the Navy List 19 October 1995, Iuka was transferred to Other Government Agency 21 March 1996.
Currently used as a training vessel for the Seamanship program at Tongue Point Job Corps Center, Astoria, OR
References
- ↑ "Marinette Marine Corp., Marinette WI". shipbuildinghistory.com. Retrieved 2011-11-28.
- This article includes information collected from the Naval Vessel Register, which, as a U.S. government publication, is in the public domain. The entry can be found here.
External links
Wikimedia Commons has media related to Iuka (YTB-819). |
This article is issued from Wikipedia - version of the Sunday, October 11, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.