Hendre-Ddu Tramway

Hendre-Ddu Tramway

Map of the Hendre-Ddu tramway; not all lines shown existed at the same time
Locale Wales
Dates of operation 18671954
Successor abandoned
Track gauge 2 ft (610 mm)
Length 3 12 miles (5.6 km)
Headquarters Aberangell

The Hendre-Ddu Tramway was a 2 ft (610 mm) narrow gauge industrial railway built in 1867 to connect the Hendre-Ddu Slate quarry to Aberangell station on the Mawddwy Railway. It consisted of a main line 3½ miles long and several branch lines and spurs serving other quarries, local farms and the timber industry.

History

Hendre Ddu slate quarry opened in the 1850s, and in 1864 the Hendre Ddu Slate and Slab Co. was established by Sir Edmund Buckley. The Company specialised in slate slabs for billiard table beds.

The standard gauge Mawddwy Railway, opened in 1867 connected the Cambrian Railway at Cemmaes Road to Dinas Mawddwy, passing through the small village of Aberangell. Sir Edmund Buckley built the Hendre Ddu Tramway to carry slate from his quarry down to Aberangell station. Several other quarries had branches and spurs onto the Tramway, as well as a brickworks, a sawmill and several local farms.

The slate slabs for billiard tables were carried on special trestle wagons similar to those on the nearby Corris Railway. Quarry workers rode in open cars which were occasionally also used for tourist excursions. During the First World War a branch was laid in lightweight portable "Jublilee" track from Cefn Gwyn along Cwm Caws for timber extraction.

When this work was finished in 1917 the track was lifted and re-laid on the trackbed of a long closed branch to Coed y Chwarel. It is believed that Baguley petrol locomotive No. 774 was used on this line. This locomotive is now preserved as part of the collection of the Narrow Gauge Railway Museum.

During 1940 the Coed y Chwarel branch was again re-laid using Jubilee track for further timber extraction. This line was not lifted until October 1954 although the Hendre Ddu Tramway itself was converted into a road in 1941 for the safer conveyance of munitions which were stored in the Hendre Ddu Quarries during the war and for some years afterwards.

Operation

The wagons descended by gravity and were hauled back by horses, later by a road tractor and then a Simplex petrol loco was used from 1922.

Locomotives

Builder Type Works

Number

Built Notes
Motor Rail "Simplex" 4wPM 2059 Acquired for the tramway in 1922
Hendre-Ddu Tramway Lorry conversion n/a 1930 Unsuccessful and short-lived conversion of an Overland lorry
Baguley 4wPM 744 Believed to be used on the Coed y Chwarel forestry branch.