Geothermal power in Portugal
Portugal's main investment into this type of energy is in the Azores. While electricity is only produced on São Miguel, Azores, direct-use applications are also at Chaves in northern Portugal, at S. Pedro do Sul in central Portugal and at the Lisbon Air Force Hospital.
Azores
In the Azores, five geothermal power plants exist on São Miguel, one near Pico Vermelho (since 1981, 3,5 GWh in 2003) and four binary cycle power plants in Ribeira Grande (85,4 GWh in 2003) which have together an installed capacity of 16 MWe. Another one on Terceira (12 MWe). In 2003, 25% of the electricity consumed on São Miguel was produced by geothermal energy.[1]
In 2001, the geothermal energy contribution reached 35%.[2]
Capacity (in MWt):[3]
Island |
Total (MWt) |
S. Miguel | 173 |
Terceira | 25 |
Faial | 12 |
Pico | 8,9 |
S. Jorge | 8 |
Graciosa | 5 |
Flores | 2.5 |
Corvo | 1,1 |
Total | 235,5 |
See also
External links
|
---|
| Geothermal power | | |
---|
| By country | |
---|
| Technologies | |
---|
| Energy Concepts | |
---|
|
- Category
- Portals: Renewable energy
- Energy
- Sustainable development
|
|
|
---|
| Africa | |
---|
| Asia | |
---|
| Europe | |
---|
| North America | |
---|
| Oceania | |
---|
| South America | |
---|
|
- Portals
- Energy
- Renewable energy
- Sustainable development
|
|