Expressways of Singapore

Expressways of Singapore
(Rangkaian Lebuhraya Singapura)

Symbol of the Singaporean expressways

Map of Singaporean expressway network as in 2012
System information
Maintained by Land Transport Authority (LTA)
Length: 163 km (101 mi)
Formed: 1966
Highway names
Expressways Expressway AAA (AAA)
System links
Expressways of Singapore
Clementi section of the Ayer Rajah Expressway.
The Pan Island Expressway at Toa Payoh. Lines for lane, shoulder and median, as well as lane numbers and an EMAS signboard, are all visible in the photo.
The Bukit Timah Expressway is part of the Asian Highway Network.

The expressways of Singapore are special roads that allow motorists to travel quickly from one urban area to another. All of them are dual carriageways with grade-separated access. They usually have three to four lanes in each direction, although there are two-lane carriageways at many expressway - expressway intersections and five-lane carriageways in some places. There are ten expressways, including the new Marina Coastal Expressway. Studies about the feasibility of additional expressways are ongoing.

Construction on the first expressway, the Pan Island Expressway, started in 1966. As of 2014, there are 163 kilometres (101 mi) of expressways in Singapore.[1]

The Singaporean expressway networks are connected with Malaysian expressway networks via Ayer Rajah Expressway (connects with the Second Link Expressway in Malaysia) and Bukit Timah Expressway (connects with the Skudai Highway via Johor–Singapore Causeway).

History

Chronology of major events
Date Events Remarks
15 April 1962 Construction of the Pan Island Expressway (PIE) begins.
8 May 1966 First phase of the Pan Island Expressway (PIE) completed. Construction of the second phase of the PIE begins.Whitley Road: Mount Pleasant Flyover - Thomson Flyover - Jalan Toa Payoh - Jalan Kolam Ayer - Paya Lebar Way
14 December 1970Toa Payoh Flyover, Singapore's first flyover is opened to motorists.Length: 1.2 kilometres
23 January 1971 Construction of the East Coast Parkway (ECP) begins with the land reclamation of East Coast.
12 December 1974 First phase of the East Coast Parkway (ECP) completed.Fort Road – Marine Parade
Formerly called Bedok Highway
20 January 1975 Second phase of the Pan Island Expressway (PIE) completed. Length: 42.8 kilometres
Whitley Road (Mount Pleasant Flyover) - Jalan Anak Bukit
15 July 1975 Planning for the Sembawang Expressway begins from Ang Mo Kio Avenue 3 to Ang Mo Kio Avenue 1.
22 February 1976 Second phase of the East Coast Parkway (ECP) completed.Marine Parade – Bedok South Road
Formerly called Bedok Highway
1 January 1977 Planning for the Sembawang Expressway was extended to Yio Chu Kang Road.
22 January 1980 Third phase of the East Coast Parkway (ECP) completed.Bedok South Road – Changi Airport
It was renamed to East Coast Parkway
15 March 1980 Third phase of the Pan Island Expressway (PIE) completed. Jalan Eunos - Changi Airport
18 April 1981Opening of the Benjamin Sheares Bridge on the East Coast Parkway (ECP) and the completion of the ECP phase 4 from Fort Road to Keppel Road.ECP Length: 20 kilometres
ECP phase 4: Fort Road - Keppel Road
11 July 1981Construction of the Sembawang Expressway (renamed to Central Expressway) begins.
20 December 1981 Fourth phase of the Pan Island Expressway (PIE) completed. Jalan Anak Bukit - Jurong Road
5 March 1983 Construction of the Ayer Rajah Expressway (AYE) begins.
31 August 1983Opening of the Central Expressway (CTE) Phase 1.Ang Mo Kio Avenue 1 - PIE
23 September 1983Construction of the Bukit Timah Expressway (BKE) begins.
18 May 1985Opening of the Central Expressway (CTE) Phase 1.PIE - Thomson Road
22 January 1986 Opening of the Bukit Timah Expressway (BKE).Length: 10 kilometres
1 July 1986Construction of the Central Expressway (CTE) phase 2 including Kampong Java Tunnel and Chin Swee Tunnel.Cavenagh Road was closed to make way for the construction of Central Expressway.
30 September 1987Opening of the Tampines Expressway (TPE) phase 1.PIE - Elias Road
5 November 1988 Opening of the Ayer Rajah Expressway (AYE).Keppel Viaduct - Jurong Town Hall Road
2 June 1989Opening of the Tampines Expressway (TPE) phase 1.Elias Road - Old Tampines Road
17 June 1989 Opening of the Central Expressway (CTE) phase 1Yio Chu Kang Road – Ang Mo Kio Avenue 1
24 March 1990Opening of the Seletar Expressway (SLE) phase 1.Yio Chu Kang Road – Upper Thomson Road
21 September 1991Opening of the Central Expressway (CTE) phase 2 including Kampong Java Tunnel and Chin Swee TunnelLength: 15.8 kilometres
31 October 1991Construction of the Kranji Expressway (KJE) begins.
5 December 1993Opening of the Pan Island Expressway (PIE).Jurong Road - Upper Jurong Road
20 February 1994Opening of the Kranji Expressway (KJE).Length: 8 kilometres
5 November 1995Opening of the Seletar Expressway (SLE) phase 2.Bukit Timah Expressway – Woodlands Avenue 2
3 September 1996Opening of the Tampines Expressway (TPE) phase 2.Old Tampines Road - SLE
2 January 1998Opening of the Ayer Rajah Expressway (AYE) phase 2.Jurong Town Hall Road - Tuas Second Link
22 February 1998Opening of the Seletar Expressway (SLE) phase 2.Length: 10.8 kilometres
Woodlands Avenue 2 - Upper Thomson Road

Opened by: Mr John Chen Seow Phun, Minister of State for Communications

22 August 1998Opening of the Tampines Expressway viaduct connecting PIE and TPE.
September 1998The Electronic Road Pricing (ERP) systems is implemented on all expressways.
2001Construction of the Kallang-Paya Lebar Expressway begins.
2004The SOS telephones were removed on all expressways except for tunnels.
23 June 2007Opening of the Tampines Service Road, currently part of the Kallang-Paya Lebar Expressway (KPE)
28 October 2007Opening of the Kallang–Paya Lebar Expressway (KPE), the longest subterranean road tunnel in Southeast Asia.ECP - PIE
March 2008Construction of the Marina Coastal Expressway (MCE) begins.
20 September 2008Official opening of the Kallang-Paya Lebar Expressway (KPE).Prime Minister Lee Hsien Loong
PIE - TPE
29 December 2013Opening of the Marina Coastal Expressway (MCE), Singapore's first undersea expressway.Length: 5 kilometres
The East Coast Parkway was shortened to Sheares Avenue.

Expansion

The latest expressway completed is the Marina Coastal Expressway which runs for 5 km, 3.5 km of which are underground. Construction started in 2008 and ended in late 2013. It was opened to the public on 29 December 2013. Prior to construction of the Marina Coastal Expressway, the Kallang–Paya Lebar Expressway which runs for 12 km, 9 km of which are 10 m underground, was started in 2001 and a 3 km section linking the Pan Island Expressway and East Coast Parkway was opened in late 2007. The Kallang–Paya Lebar Expressway was completed on 20 September 2008.

On 27 July 2007, the Land Transport Authority announced that approval had been given for the construction of a new 5 km long Marina Coastal Expressway (MCE) at a cost of $2.5 billion.[2] The expressway, which includes Singapore's first undersea tunnel, links the East Coast Parkway and Kallang-Paya Lebar Expressway to Marina South and Ayer Rajah Expressway and opened to traffic 29 December 2013.[3][4]

Construction of the 11th expressway, the North–South Expressway, was announced on 30 January 2008. The new 21-kilometre expressway will cost about $7 to $8 billion when fully completed by 2020 and will connect the East Coast Parkway with the northern parts of Singapore.

Features

There are no traffic lights on the expressways. At an interchange with another road, an expressway is connected to it via slip roads. This allows traffic to change routes without having to stop or slow down. Due to the need to conserve space in land-scarce Singapore, there are no cloverleaf interchanges on the entire island. Instead, traffic efficiency and land space are maximized by having traffic lights on terrestrial roads, as well as the usage of interchanges such as stack interchanges. The most common forms of highway-road or highway-highway intersections are single-point urban, diamond, and trumpet interchanges.

The road surface is asphalt, unlike normal roads which may have concrete surfaces. The lanes are separated with white dashed lines, while unbroken white lines are used to mark the edges of the median and shoulder. The shoulder is reserved for stops due to breakdowns and emergencies, and motorists are prohibited by law from travelling on it. Lanes are numbered from right to left, with lane 1 being the closest to the median. Crash barriers, cat's eyes and rumble strips are also used to ensure road safety.

There are signs marking the start and end of an expressway at its entry and exit points respectively. The expressways are also assigned route codes consisting three letters that form their respective initials, making the Singaporean expressway network as the only highway system with route coding system in Singapore. The Expressway Monitoring and Advisory System is used on all the expressways—cameras are used for live monitoring of expressway conditions, and LED signboards display information messages, such as warnings of any disruptions to the normal flow of traffic, as well as estimated travel times. The longest expressway, the Pan Island Expressway, is only 41 km (25 mi) long and therefore has no rest areas.

Safety

The default speed limit and National Speed Limits on Singapore expressways is 90 km/h (56 mph), but in certain areas a lower speed limit such as 80 km/h (50 mph) or 70 km/h (43 mph) is applied, especially in large urban areas, tunnels, heavy traffic and crosswinds. Speed traps are also deployed by the Singapore police at many places along the expressways and are deployed from 7am to 12am.

Certain types of transport, such as pedestrians, bicycles, and learner drivers, are not allowed.

Semi-expressways

In Singapore, there are five semi-expressways: Bukit Timah Road, Jurong Island Highway, Nicoll Highway, the Outer Ring Road System (ORRS) and West Coast Highway. These semi-expressways are scaled down versions of expressways. Semi-expressways do not have a uniform speed limit through its entire length, and some sections still feature traffic light controlled junctions, such as the eastern section of the ORRS and the controlled roundabout along the West Coast Highway. Still, just like expressways, semi-expressways allow motorists to travel quickly from one urban area to another with the use of viaducts, flyovers and underpasses.

List of Expressways

Ranking of the Length from Longest to Shortest
Rank Number Expressway Name Abbreviation Opened Length Exit Terminus Remarks
1st Pan Island Expressway PIE 1966 42.8km Changi Airport, ECP
Tuas, AYE
Longest and Oldest Expressway in Singapore.
2nd Ayer Rajah Expressway AYE 1988 26.5km Keppel
Tuas Checkpoint, Tuas Second Link
Disconnected from ECP from 29 December 2013.
3rd North South Expressway NSE 2020 21.5km Admiralty Road West
ECP, Republic Avenue and Nicoll Highway
Under Construction. Completing by 2020.
4th East Coast Parkway ECP 1974 20km Changi Airport, PIE
Marina Boulevard
Disconnected from AYE from 29 December 2013. Shortened to Rochor in 2013 instead of going and merge AYE.
5th Central Expressway CTE 1989 15.8km SLE
AYE
This Expressway got two tunnels, Kampong Java Tunnel and Chin Swee Tunnel. Merge with SLE
6th Tampines Expressway TPE 1989 14km SLE, CTE
PIE
Upper Changi Road East
7th Kallang-Paya Lebar Expressway KPE 2008 12km MCE, ECP
TPE
The expressway is one of the longest tunnel in Singapore.
8th Seletar Expressway SLE 1990 10.8km BKE, Turf Club Ave
CTE
Merge with CTE
9th Bukit Timah Expressway BKE 1986 10km PIE
Woodlands Checkpoint, Johor–Singapore Causeway
10th Kranji Expressway KJE 1994 8km BKE
PIE
11th Marina Coastal Expressway MCE 2013 5km AYE
Tanjong Rhu, KPE
Singapore's First undersea expressway.

Diagram

A map showing the expressways and semi-expressways of Singapore. The Marina Coastal Expressway was opened at the end of 2013, while the North-South Expressway is under planning.

See also

References

  1. "Expressways in Singapore: Did you know?". The Highway. Automobile Association of Singapore. July 2001. Retrieved 5 April 2006.
  2. "Government Approves the Construction of MCE" (Press release). Land Transport Authority. 27 July 2007.
  3. "Marina expressway to be ready by year-end". The Straits Times. Retrieved 31 May 2013.
  4. "Singapore's first undersea road—Marina Coastal Expressway—set to open on Dec 29". The Straits Times. 13 November 2013.
This article is issued from Wikipedia - version of the Wednesday, November 18, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.