Eifel Railway

Hürth-Kalscheuren – Ehrang
Overview
Locale Rhineland-Palatinate, Germany
Line number 2631
Technical
Line length 163.5 km (101.6 mi)
No. of tracks
  • 2: Hürth-Kalscheuren – Kall
  • 2: Nettersheim – Blankenheim (Wald)
  • 2: Schmidtheim – Lissendorf
  • 2: Bewingen – Gerolstein
  • 2: Birresborn – Densborn
  • 2: Kordel – Trier
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Route number 474
Route map

Legend
 Operating points and lines[1] 
Cologne
(see West Rhine Railway)
0.6 Hürth-Kalscheuren 60 m
West Rhine Railway to Bonn
former connecting line
Vorgebirg Railway Köln ↔ Bonn
(Stadtbahn line 18)

5.2 Kierberg 95 m
Mödrath-Liblar-Brühl Railway
11.4 Erftstadt(Liblar until 1990) 130 m
former Strategic Railway Embankment to Rech
former Euskirchen District Railway
A 553
15.2 Bliesheim(Bk)
A 61
17.7 Weilerswist industrial line
18.3 Weilerswist(former station) 122 m
23.8 Derkum
25.8 Großbüllesheim
27.6 Kleinbüllesheim(Bk)
Voreifel Railway from Bonn
Erft Valley Railway from Bad Münstereifel
30.1 Euskirchen
Börde Railway to Düren
32.5 Becker(siding)
former connecting curve from the Börde Railway
32.6 Euenheim(junction)
33.9 Wißkirchen(Bk)
A 1
37.5 Satzvey
former Euskirchen District Railway
40.5 Katzvey(Bk)
44.2 Mechernich 300 m
47.0 Mechernich Mülldeponie(junction)
47.2 Strempt(Bk)
47.4 Mechernich West(junction)
49.7 Scheven
51.1 Kall Tunnel (472 m)
Olef Valley Railway from Hellenthal
53.3 Kall 377 m
55.0 Sötenich(Bk)
55.2 Kalkwerke Sötenich(junction)
57.5 Urft (Steinfeld)
59.4 Gronrechtsmühle(Bk)
62.8 Nettersheim 452 m
66.4 Marmagen(Bk)
69.4 Blankenheim (Wald) 495 m
former line to Ahrdorf
73.9 Schmidtheim 550 m
77.4 Dahlem (Eifel)
78.0 Dahlem (Eifel) RWE(siding)
NRW / RLP state border
Glaadt junction
former Vennquer Railway to/from Weywertz
82.4 Jünkerath
86.4 Lissendorf(crossover)
former line to Dümpelfeld
91.4 Oberbettingen-Hillesheim
96.2 Bewingen
former line from Hillesheim
Eifelquer Railway from Daun
101.4 Gerolstein
West Eifel Railway to Prüm
106.4 Gerolstein Basalt(siding)
108.4 Birresborn
112.4 Mürlenbach
115.4 Densborn
117.4 Usch/Zendscheid
121.4 St. Thomas
124.4 Dechen Tunnel (181 m)
125.4 Kyllburg
125.7 Kyllburg Tunnel (218 m)
Wilseck Tunnel (1268 m)
131.4 Bitburg-Erdorf
Nims-Sauer Valley Railway to Bitburg
133.3 Metterich Tunnel (426 m)
135.4 Hüttingen
139.2 Philippsheim
140.1 Philippsheim Tunnel (268 m)
140.9 Friedrich-Wilhelm Tunnel (333 m)
142.4 Speicher
142.7 Loskyller Tunnel (294 m)
143.9 Heinzkyller Tunnel (201 m)
145.4 Auw an der Kyll
148.9 Ittel (Kyll)
149.1 Kyll Tunnel (138 m)
152.2 Daufenbach
157.5 Kordel
159.7 Burg Ramstein
160.8 Kuckuckslay Tunnel (450 m)
Mosel line from Koblenz
163.5 Ehrang
Ehrang freight yard
Mosel line to Trier
Biewer(junction)
Trier West Railway to Igel

The Eifel Railway (German: Eifelstrecke) is a non-electrified line in the German states of North Rhine-Westphalia and Rhineland-Palatinate running from Hürth-Kalscheuren via Euskirchen and Gerolstein to Trier-Ehrang through the Eifel hills.

The line is predominantly duplicated north of Densborn. Today it is only served by trains running as far as Köln Messe/Deutz station or Trier Hauptbahnhof.

History

In 1864, the Rhenish Railway Company began construction of the Eifel line from Düren via Euskirchen and Gerolstein to Trier. The section from Düren to Euskirchen is now known as the Börde Railway (Bördebahn).

Opening date Section
27 June 1865 Euskirchen–Mechernich
1 November 1867 Mechernich–Kall
19 June 1868 Kall–Sötenich
15 November 1870 Sötenich–Gerolstein
15 June 1871 Gerolstein–Trier West
Kierberg station, known as Kaiserbahnhof (Emperor Station)
Auw an der Kyll station
Speicher station

On 1 October 1875, it was connected from Euskirchen with the Left Rhine line at Kalscheuren. Numerous bridges and tunnels on the line as well as the stations at Euskirchen, Weilerswist and Kierberg were built by Hermann Schmalenbach.

The route

Before World War I the Prussian railway administration planned that the Eifel line would be one of the first lines in Germany to be electrified. But this failed because of the opposition from the military on the ground that the line was too close to the French border. Also, a connection of the Eifel line with the Bonn–Koblenz line near Sechtem was planned, which was also never implemented (this was part of the Strategischer Bahndamm—"Strategic railway embankment"—a plan to build a western bypass of the rail nodes at Cologne and Düsseldorf to accelerate military mobilisation, although only the Ludendorff Bridge at Remagen was ever completed).

By the end of World War II, the entire line was duplicated. After the war, the second track in the south was largely dismantled on the orders of the French occupation forces and the track material was taken to France. In the northern section (which was in the British zone), the second track remained in place over almost its entire length, while the southern section continues to be mainly single track. Today the reconstruction of the second track in many places is difficult since its location has been put to other uses, often as a bicycle path parallel to the railway.

Freight

The Eifel track is still not electrified. This means that freight trains run from the Ruhr to the Saar and on to Lorraine via Koblenz. On 28 December 2001 the last freight train of DB Cargo (now DB Schenker Rail) ran on this route.

Passengers

Long-distance express trains used to run from Saarbrücken and Trier to Cologne via the Moselle line via Koblenz or via the Eifel line, often continuing to Münster. After the electrification of the Mosel line in 1974, most long-distance trains ran on the Moselle line. Now all long-distance services run on the Moselle line.

Regional services running at hourly intervals were introduced on the Eifel line in 1991 with additional trains north of Gerolstein or Jünkerath. Approximately every two hours express trains or Regional-Express (RE) trains also ran between Cologne and Trier. In 1996 the line was upgraded for tilting trains so that RE services operated by class 611 diesel multiple units could run over the Eifel line from Saarbrücken to Cologne. This project failed due to technical problems with the vehicles, so the RE trains from Saarbrücken continue to operate to Koblenz with a connection in Trier to diesel trains over the Eifel line to Cologne.

Vehicles

Until the 1970s haulage of express trains was dominated by steam locomotives of class 39 and 01, while freight traffic was operated by all classes of Prussian freight locomotives used in the Deutsche Reichsbahn era, especially the heavy class 44s. They were gradually replaced by steam locomotives of class 50 and 86. Passenger locomotives of class 23 were added from the 1950s.

With the onset of dieselisation of the line locomotives of class 211 and 216 were usual and from the 1970s until 2001 class 215 locomotives operated on the line. Between 2001 and 2009 some class 218 diesel locomotives ran on the line. In addition, from 1964 to 1980 class 624 diesel multiple unit operated over the line.

Up in the 1950s, trains with Prussian compartment coaches ran on regional services. These were replaced by Silberling carriages hauled by class 215 diesel locomotives, which were later superseded by class 218 locomotives running on the Eifel line along with class 644 diesel multiple units until 2009. Some trains were at this time operated with class 612 and 628 railcars. No trains hauled by class 218 have run since the timetable change in December 2009. Instead, services are now operated by class 628 multiple. From December 2013 class 54 LINT railcars will be used.

Current services

The Eifel line is served daily by two Regional-Express passenger services each running alternatively every two hours:

It is also daily served by hourly Regionalbahn services:

RE 12 services are operated by DB Regio Südwest, using class 628.4 multiple units at speeds of up to 120 km/h. On Saturdays some class 612 trains are used.

RE 22, RB 24 and RB 83 are operated by DB Regio NRW, using multiple units of class 644 (Bombardier Talent), RE 22, RB 24) or class 628 (RB 83) at speeds of up to 120 km/h.

Service planning

For the timetable change in December 2013, operations on the Eifel line were re-tendered. The contract was awarded to DB Regio Rheinland,[2] which will operate Alstom Coradia LINT DMUs.[3]

Notes

  1. Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  2. DB Regio Rheinland wird neuer Betreiber des Kölner Dieselnetzes
  3. Pressemitteilung ÖPNV Eifelregion

References

External links

Wikimedia Commons has media related to Eifel Railway.
This article is issued from Wikipedia - version of the Thursday, September 10, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.