East West MRT Line

 EWL 
East West MRT Line
Laluan MRT Timur Barat
东西地铁线
கிழக்கு மேற்கு எம்ஆர்டி வழி

The East West Line is coloured green on system maps.
Overview
Type Rapid transit
System Mass Rapid Transit (Singapore)
Status Operational
Termini Pasir Ris
Joo Koon
Tuas Link (U/C)
Changi Airport
Tanah Merah
Stations 31 (excluding the TWE)
Services 4
Operation
Opened 12 December 1987 (as part of North South Line)
4 November 1989 (renamed as East West Line)
Owner Land Transport Authority
Operator(s) SMRT Trains (SMRT Corporation)
Character Elevated/Underground
Depot(s) Ulu Pandan
Tuas
Changi
Rolling stock C151, C151A, C651, C751B, C151B (Future), C151C (Future)
Technical
Line length 49 km (30 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 V DC Third rail
Operating speed limit of 80 km/h
Route map
Legend
 EW1  Pasir Ris
Tampines Expressway

 
Bukit Panjang

 EW2  DT32  Tampines
Pan Island Expressway
 EW3  Simei
 CG2  Changi Airport

Downtown Line

Changi Airport Branch Line

 CG1  DT35  Expo
  Sungei Bedok
 

Changi Depot

 EW4  Tanah Merah

 EW5  Bedok
 EW6  Kembangan
 EW7  Eunos

 EW8  CC9  Paya Lebar

HarbourFront
  Dhoby Ghaut

 EW9  Aljunied
 EW10  Kallang
Kallang River
 EW11  Lavender

Bukit Panjang
  Sungei Bedok

 EW12  DT14  Bugis
Dhoby Ghaut
  HarbourFront

 
Jurong East

 EW13  NS25  City Hall

Singapore River

 EW14  NS26  Raffles Place
  Marina South Pier
 

 EW15  Tanjong Pagar
 
Sungei Bedok

Punggol
  HarbourFront

 EW16  NE3  TE17  Outram Park
Woodlands North
 

 EW17  Tiong Bahru
 EW18  Redhill
 EW19  Queenstown
 EW20  Commonwealth

Dhoby Ghaut
  HarbourFront

 EW21  CC22  Buona Vista
 EW22  Dover
 EW23  Clementi

Ulu Pandan Depot

 EW24  NS1  Jurong East

Marina South Pier
 

 EW25  Chinese Garden
 EW26  Lakeside
 EW27  Boon Lay
Boon Lay Extension
 EW28  Pioneer
 EW29  Joo Koon

 EW30  Gul Circle
 EW31  Tuas Crescent
 EW32  Tuas West Road
 EW33  Tuas Link
The East West Line is coloured green in the MRT system map.
Station names of the East-West Line.

The East West Line (EWL) is the second Mass Rapid Transit line in Singapore. The line is currently 49 kilometres (30 mi) long with 35 stations,[1] including four stations under construction and to be completed by 2016, known as the Tuas West Extension (TWE), making it the longest MRT line in Singapore. It takes about 70 minutes to travel from one end to the other (Pasir Ris to Joo Koon). The line is coloured green on MRT system maps.

Overview

As its name implies, the line connects central Singapore to both eastern and western parts of the island, with an additional branch to Changi Airport from Tanah Merah, which is operated as a separate shuttle service. There is a short tunnel between Kembangan and Bedok where the line ascends into the hill at Siglap, and there is a longer tunnel due to the space limitations between Kallang and Redhill. The line passes through the centre median of roads in Tanah Merah, Bedok, Queenstown, Commonwealth, Dover and Clementi. It takes commuters to schools (Nanyang Technological University and Singapore Polytechnic are nearby) and places of interest (Jurong Bird Park and Science Centre), and skirts past the three rivers (Singapore River, Rochor River and Kallang River).

Originally, East West Line had a short-working trip that terminated at Tanah Merah for after peak hours, easier to clear but was a rare case from 2011 to 2013 (after that all trains were running to fixed schedules). There was a through connection to the Changi Airport before it changed to a shuttle service from 22 July 2003.

EWL is the only line connecting the east to the downtown area until 2017, when the Downtown Line and Thomson-East Coast Line (East Coast section) are expected to be completed.

History

The East West Line is the second line to be built, when the City Hall to Outram Park segment was opened on 12 December 1987, with through services to Yio Chu Kang. It was extended to Clementi on 12 March 1988 and to Lakeside on 5 November 1988. Additionally, the eastern extension to Tanah Merah was opened on 4 November 1989 (when the current name was adopted to reflect the operational split from the North South Line), and to Pasir Ris on 16 December 1989. The last station of the original system, Boon Lay opened on 6 July 1990. On 18 October 2001 Dover station was opened and then on 25 February 2002 the Expo and Changi Airport stations are opened. On 28 February 2009 the stations Pioneer and Joo Koon was oficially opened to the public.Boon Lay

Tuas West Extension (TWE)

On 11 January 2011, the Tuas West Extension was announced. It is an extension of the East West Line from Joo Koon to Tuas Link. The stations Gul Circle, Tuas Crescent, Tuas West Road and Tuas Link — will extend MRT connectivity to the Tuas area and is expected to serve more than 100,000 commuters daily.[2]

When completed in 2016, the Tuas West Extension will be an extension of the East West Line from Joo Koon, consisting of a 7.5 km long twin-tracked MRT viaduct, four aboveground stations and a depot. The MRT viaduct is also integrated with part of a 4.8 km long road viaduct along Pioneer Road, which will increase the road capacity to cope with anticipated increase in traffic. A 26-hectare depot will also be built to provide stabling and maintenance facilities for the additional trains that will be bought for the extension and to cater for future expansion of the line.[3]

On 4 May 2012, the Land Transport Authority marked the start of construction of the Tuas West Extension with a groundbreaking ceremony at the site of the future Tuas Link station.[2]

Half-height platform screen door installations

There were calls for platform screen doors to be installed at above-ground stations after several incidents in which passengers were killed or seriously injured by oncoming trains when they fell onto the railway tracks at above-ground stations. Underground stations already featured the doors since 1987. The authorities initially rejected the proposal by casting doubts over functionality and concerns about the high installation costs,[4] but made an about-turn when the government announced plans to install half-height platform screen doors on the above-ground stations in January 2008, citing lower costs due to it becoming a more common feature worldwide.[5] They were first installed at Jurong East and Pasir Ris stations in 2009 as trial runs.[6] Installation of platform screen doors began at Clementi and Lakeside stations on April 2010. On 31 August 2011, the last station, Expo began installation of half-height platform screen doors.[7]

Timber to concrete sleeper replacement works

Timber sleepers are designed to last 15 to 25 years, and they have to be replaced when they are near the end of their lifespan, or when they show signs of significant wear and tear. The new sleepers installed will allow trains to move along the tracks smoothly and without the current speed restrictions. In order to carry out works at night when trains are not operational, train services were ended earlier on the East West Line. It is expected to be completed by early 2017, and is divided into three phases: Phase 1 (Outram Park - Tanah Merah), Phase 2 (Tanah Merah - Pasir Ris/Changi Airport), Phase 3 (Jurong East - Boon Lay) and Phase 4 (Jurong East - Outram Park). Pioneer and Joo Koon were exempted from the sleeper replacement work as they were recently built.

Summary Timeline

Line Disruptions

On July 7, 2015, the NSEWL was completely shut down due to massive power trips detected. This is the worst breakdown in SMRT history and also the first major breakdown for EWL. Investigations have completed and the cause was narrowed down to damaged insulators which failed to supply power properly.

Stations

The East West Line plies the following routes:

Station Number Station Name Interchange/Notes
 EW1 Pasir Ris 
 EW2  DT32 TampinesChange for the Downtown Line (2017)
 EW3 Simei 
 EW4 Tanah MerahChange at this station for train services to Expo or Changi Airport
 EW5 Bedok 
 EW6 Kembangan 
 EW7 Eunos 
 EW8  CC9 Paya LebarChange for the Circle Line
 EW9 Aljunied 
 EW10 Kallang 
 EW11 Lavender 
 EW12  DT14 BugisChange for the Downtown Line
 EW13  NS25 City HallChange for the North South Line
 EW14  NS26 Raffles PlaceChange for the North South Line
 EW15 Tanjong Pagar 
 EW16  NE3  TE17 Outram ParkChange for the North East Line or Thomson-East Coast Line (2021)
 EW17 Tiong Bahru 
 EW18 Redhill 
 EW19 Queenstown 
 EW20 Commonwealth 
 EW21  CC22 Buona VistaChange for the Circle Line
 EW22 Dover 
 EW23 Clementi 
 EW24  NS1 Jurong EastChange for the North South Line
 EW25 Chinese Garden 
 EW26 Lakeside 
 EW27 Boon Lay 
 EW28 Pioneer 
 EW29 Joo Koon 
Tuas West Extension (TWE)
 EW30 Gul Circle(under construction)
 EW31 Tuas Crescent(under construction)
 EW32 Tuas West Road(under construction)
 EW33 Tuas Link(under construction)
Changi Airport Branch Line (CAL)
 EW4 Tanah Merah 
 CG1  DT35 ExpoChange for the Downtown Line (2017)
 CG2 Changi Airport 

SMRT used to operate the branch sector of  EW4 Tanah Merah MRT Station to  CG2 Changi Airport as a through line from Boon Lay from 18 November 2001 until 22 July 2003, when it was replaced with a shuttle service.[8]

Similarly to the preceding Circle and Downtown MRT Lines announced earlier, the four stations along the Tuas West Extension were open for public consultation from 16 December 2011 to 15 January 2012. The finalised station names were announced on 13 April 2012.[9]

Rolling stock

Four batches of rolling stock are in service on the line, they are the C151s, the C651s, the C751Bs and the C151As. These trains operate from the two depots along the line, the Ulu Pandan Depot between Jurong East and Clementi, the Changi Depot near Tanah Merah and 2016, the Tuas Depot located near Tuas Checkpoint.

Train Control

The East West Line is currently equipped with Westinghouse fixed block signalling system with Automatic train control with Automatic train control (ATC) under Automatic train operation (ATO) GoA 3 (DTO). The subsystems consist of Automatic train protection (ATP) to govern train speed and Automatic Train Supervision (ATS) to track and schedule trains.

The current signalling system is currently phasing out and will be replaced by a new Thales SelTrac® Communications-based train control (CBTC) moving block signalling system[10]

The new signalling system is expected to be operational by 2018 and trains will run with Automatic train control (ATC) under Automatic train operation (ATO) GoA 3 (DTO). The subsystems consist of Automatic train protection (ATP) to govern train speed, NetTrac MT Automatic Train Supervision (ATS) to track and schedule trains and a Computer-based interlocking (CBI) system that prevents incorrect signal and track points to be set.

Automatic platform screen doors by Westinghouse were originally installed when the line opened and Automatic Platform Screen Gates were installed at a later date on elevated stations except for Tuas West Extensions stations, where they were manufactured by Fangda Group.

References

  1. "East-West Line". Land Transport Authority. 29 January 2014. Retrieved 22 November 2014.
  2. 1 2 "Construction Starts for Tuas West Extension". Land Transport Authority. 4 May 2012.
  3. "Speech (Part 1 – Public Transport) by Mr Lui Tuck Yew, Minister for Transport, for COS 2012". 7 March 2012. Retrieved 12 August 2012.
  4. "Safety at MRT and LRT Stations — Respect The Yellow Line" (Press release). Land Transport Authority. 20 November 2005. Archived from the original on July 16, 2012.
  5. "Platform screen doors for all above-ground MRT stations by 2012". The Straits Times. 25 January 2008. Archived from the original on 28 January 2008.
  6. Yeo Ghim Lay (3 September 2008). "Platform doors for elevated MRT stations". The Straits Times. p. 26.
  7. "Completion of Half Height Platform Screen Doors on East West Line | Press Room | Land Transport Authority". Land Transport Authority. 31 August 2011. Retrieved 2015-11-23.
  8. "Shuttle train service" (PDF). SMRT Corporation. July 2003.
  9. "Tuas West Extension station names finalised". Land Transport Authority. 13 April 2012.
  10. Thales awarded signalling contracts for Singapore North-South, East-West lines and Tuas West Extension

External links

Wikimedia Commons has media related to Mass Rapid Transit (Singapore) East West Line.
This article is issued from Wikipedia - version of the Monday, February 08, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.