Dandong–Dalian Intercity Railway
Dandong-Dalian Intercity Railway 丹大城际铁路 | |
---|---|
Overview | |
Type | High-speed rail |
Status | in opeartion |
Locale |
Dalian Dandong |
Termini |
Dalian Dandong |
Stations | 18 |
Services | 1 |
Operation | |
Opened | 17 December 2015 |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 292 km (181 mi) |
Track gauge | 4 ft 8 1⁄2 in (1,435 mm) |
Operating speed | 250 km/h |
Dandong-Dalian ICR route map | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Dandong–Dalian Intercity Railway is a Chinese high-speed railway within Liaoning Province, connecting the coastal cities of Dandong and Dalian.
Overview
Dandong–Dalian Intercity Railway has been broken down into three segments. Dandong - Zhuanghe section, Zhuanghe - Dengshahe section and the Dengshahe - Dalian section. It will have a total length of about 292 km, of which 94 km will in the Dandong prefectural area, 198 km will be in the Dalian region.[1] The total investment is estimated to be about 14.7 billion yuan with a design speed of 200 km/h of primary double tracked electrified railway. The construction period is estimated to take about three and a half years[2] and was started on March 17, 2010. It starts operation on 17 December 2015[3]
History
Planning Phase
- April 21, 2009 - Liaoning Provincial Government and the Ministry of Railways signed the "On the strengthening of Liaoning railway construction Minutes", which set a railway design speed of 250 km/h along a double track line electrified railway for passengers and freight.
- June 28, 2009 - Ministry of Railways jointly with the provincial government reported to the National Development and Reform Commission about their studies on this project.[4]
- December 19–21, 2009 - Ministry of Railways held preliminary design review meeting, formally adopting the project preliminary design review.
Construction Phase
- March 17, 2010 - Dandong - Zhuanghe section started.[5]
- December 2, 2010 - First bridge girder erection in the Donggang, Liaoning area, well north of the town of Wolong with several large bridges completed.[6]
Operation Phase
- December 17, 2015 - Start Operation.
References
- ↑ "大连到丹东一个半小时 丹大快速铁路计划工期三年半". 丹东新闻网. Retrieved 2011-07-07.
- ↑ "丹大快速铁路开工进入倒计时". 大连新闻网. Retrieved 2009-12-28.
- ↑ "丹大快铁开通运营 1小时生活圈又大了". 沈阳网. Retrieved 2015-12-20.
- ↑ 丹大客运专线年底前开工 1小时45分到达大连
- ↑ http://news.sina.com.cn/c/2010-03-18/073219888288.shtml 沈丹铁路客运专线和丹大快速铁路正式开建
- ↑ http://liaoning.nen.com.cn/liaoning/29/3662529.shtml 丹大快速铁路昨日“上梁”
|