Cindere Dam
Cindere Dam | |
---|---|
Location | Turkey |
Construction began | 1994 |
Opening date | 2007 |
Dam and spillways | |
Height | 78 m (256 ft) |
Reservoir | |
Total capacity | 82,000,000 m3 (66,478 acre·ft) |
Power station | |
Installed capacity | 29 MW |
Annual generation | 88 GWh |
Cindere Dam is a gravity dam on the Büyük Menderes River in Denizli Province, Turkey. The development was backed by the Turkish State Hydraulic Works.