Chengdu–Lanzhou Railway
Chengdu–Lanzhou High-Speed Railway 成兰高速铁路 | |
---|---|
Overview | |
Status | Under Construction |
Locale |
Chengdu Lanzhou |
Termini |
Chengdu Lanzhou West |
Services | 1 |
Operation | |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 730.549 km (454 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Operating speed | 200Km/h |
Chongqing–Lanzhou Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Line length: | 730.549 km (454 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge: | 1,435 mm (4 ft 8 1⁄2 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum speed: | 200 km/h (124 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Legend
|
Chengdu–Lanzhou High-speed Railway is a Chinese high-speed railway connecting the Sichuan provincial capital of Chengdu with the Gansu capital, Lanzhou.
Profile
Chengdu–Lanzhou High-speed Railway has a length of 730.549 kilometers, of which 462 km is new trackage. It is being built as a double-track electrified railway, at the national railway line class I level. It will have an overall design speed of 200 kph; however. the Chengdu-to-Jiuzhaigou section will have a reduced speed of 174 kph in sections, due to the difficult and mountainous terrain. The total investment is expected to be 61.939 billion yuan. Construction commenced on February 26, 2011.
After the completion of the railway, the distance between Lanzhou and Chengdu will be shortened from 1172 km of coventional rail lines to 730 kilometres of high-speed rail. Run time for train services will be reduced to about 5 hours.
Route
Chengdu–Lanzhou High-speed Railway will head north from the Chengdu hub to Qingbaijiang through Shifang, Mianzhu, Anxian and tunnelling through Longmen Shan to Maoxian, tracing along the Minjiang River valley and on through Chuanzhusi to Jiuzhaigou County. Crossing into the territory of Gansu, across the Bailong River, it meets the Lanzhou-Chongqing HSR at Hadapu, following that railway line to the end at Lanzhou East Station.
Stations
Chengdu, Qingbaijiang East, Qingbaijiang, Dawan, Sanxingdui, Shifang, Mianzhu, Anxian, Shiziyuan, Maoxian, Diexi, Zhenjiangguan, Songpan, Chuanzhusi, Huangshengguan, Remoke, Jiuzhaigou, Baigusi, Shangzhangwan, Hadapu, Minxian, Weiyuan and Lanzhou East
Construction
February 26, 2011, Chengdu–Lanzhou High-Speed Railway starts construction in the Songpan County area of Sichuan.