Carosue Dam Gold Mine
Location | |
---|---|
Carosue Dam Gold Mine | |
Location | Laverton |
State | Western Australia |
Country | Australia |
Coordinates | 30°11′S 122°24′E / 30.183°S 122.400°ECoordinates: 30°11′S 122°24′E / 30.183°S 122.400°E |
Production | |
Production | 111,163 |
Financial year | 2010–11 |
History | |
Opened | 2000 |
Active |
2000–2005 2010–present |
Owner | |
Company | Saracen Mineral Holdings Limited |
Website | Saracen website |
Year of acquisition | February 2006 |
The Carosue Dam Gold Mine is a gold mine located south of Laverton, Western Australia.
It is currently owned by Saracen Mineral Holdings Limited.
Carosue Dam was previously owned by the now defunct mining company Sons of Gwalia Limited.[1] Sons of Gwalia went into administration on 30 August 2004 and the company's gold mining operations were sold to St Barbara Limited in March 2005 for A$38 million, having been valued by the Sons of Gwalia directors at A$120 million. It was one of four gold mines sold to St Barbara in this deal, the other three being the Marvel Loch Gold Mine, the Tarmoola Gold Mine and the Gwalia Gold Mine.[2][3][4]
The mine was placed in care and maintenance by St Barbara in June 2005 and sold to Saracen in February 2006. Saracen reopened the mine in early 2010.
History
Located within the South Laverton gold field, situated 120 km North East of Kalgoorlie, the processing plant at Carosue Dam was constructed and commissioned in 2000, then owned by Pacmin Mining. In October 2001, it was acquired by Sons of Gwalia.[5] During its five-year operation until June 2005, the mine produced over 700,000 ounces of gold.[6]
After the collapse of Sons of Gwalia in 2004, the mine continued producing but was placed in care and maintenance by St Barbara three months after its purchase.[7]
In October 2005, St Barbara announced the sale of Carosue Dam to Saracens for A$19.4 million in cash and shares. St Babrbara acquired a 20% interest in Saracens through this transaction.[8]
With the purchase of the mine by Saracen, the new owners developed a two-staged plan to reopen the mine in 2010. After a period of open pit mining, lasting for three to five years, the second stage will also include an underground operation.[9]
On 15 June 2009 Saracen announced that the mine would be connected to the Western Power grid through a 90 km power line rather than being supplied by diesel generators on site. This line, scheduled to be completed in late 2010, is estimated to cost between $10 to 15 million but should provide the company with savings in the range of $50 to 100 per once of gold produced.[10]
In November 2009, Saracen announced that the $7 million construction project at the mine had been finished and plant commissioning had started. Gold production was scheduled to begin in February 2010,[11] with the first gold pour announced on 29 January 2010.[12]
Production
Production of the mine:
Year | Production | Grade | Cost per ounce |
2001 [13] | 121, 161 ounces | 1.76 g/t | A$345 |
2002 [13] | 95,144 ounces 1 | 1.8 g/t | A$388 |
2002–03 [14] | 139,894 ounces | A$426 | |
2003–04 [15] | 172,388 ounces | A$387 | |
2005 [7] | 29,528 ounces 2 | 3.28 g/t | A$349 |
2005–09 | inactive | ||
2009–10 [16] | 25,036 ounnces | A$654 | |
2010–11 [17] | 111,163 ounces | A$738 |
- 1 2002 results for January to September only.
- 2 For 28 March to 30 June period only.
Sources
- The Australian Mines Handbook: 2003-2004 Edition, Louthean Media Pty Ltd, Editor: Ross Louthean
- Western Australian Mineral and Petroleum Statistics Digest 2008 Page 34: Principal Mineral and Petroleum Producers - Gold
References
- ↑ The Australian Mines Handbook: 2003-2004 Edition, page 520
- ↑ Sons of Gwalia Limited at delisted.com.au accessed: 3 September 2009
- ↑ St Barbara Mines Limited - Lodgment of Open Briefing published: 28 June 2005, accessed: 3 September 2009
- ↑ The West Australian, published 16 March 2005, accessed: 3 September 2009
- ↑ MINEDEX on the Web accessed: 4 September 2009
- ↑ Saracen website - Plant and Infrastructure accessed: 4 September 2009
- 1 2 St Barbara annual report 2005
- ↑ St Barbara annual report 2006 accessed: 4 September 2009
- ↑ Saracens website - Operations - Stage 2 accessed: 4 September 2009
- ↑ Carosue Dam Operations - Mains power supply Saracens website, published: 15 June 2009, accessed: 5 September 2009
- ↑ Carosue Dam plant commissioning commenced Gold production expected in February 2010 ASX announcement, published: 30 November 2009, accessed: 27 December 2009
- ↑ First Gold Pour at the Carosue Dam Operations Saracens ASX announcement, published: 29 January 2010, accessed: 30 January 2010
- 1 2 The Australian Mines Handbook: 2003-2004 Edition, page 77
- ↑ Sons of Gwalia annual report 2003 accessed: 12 January 2010
- ↑ Sons of Gwalia fourth quarter report 2004 accessed: 12 January 2010
- ↑ Quarterly Activities Report June 2010 Saracen ASX announcement, published: 29 July 2010, accessed: 5 August 2011
- ↑ Quarterly Activities Report June 2011 Saracen ASX announcement, published: 28 July 2011, accessed: 5 August 2011
External links
- Place Names Search Results - Carosue Dam Geoscience Australia website
- Saracen website - Carosue Dam operations
|