China Railways CRH2

China Railways CRH2 EMU

In service 2007 - Present
Manufacturer Kawasaki Heavy Industries,
Sifang Locomotive and Rolling Stock
Family name Shinkansen
Number built CRH2A: 60+40 trainsets (800 cars)
CRH2B: 20 trainsets (320 cars)
CRH2C (stage 1): 30 trainsets (240 cars)
CRH2C (stage 2): 20 trainsets (160 cars)
CRH2E: 20 trainsets (320 cars)
Formation CRH2A: 8 cars per trainset (4M4T)
CRH2B/E: 16 cars per trainset (8M8T)
CRH2C: 8 cars per trainset (6M2T)
Capacity CRH2A: 610/571/562/588/600/608
CRH2B: 1230
CRH2C: 610/626
CRH2E: 630
Operator(s) Chinese Ministry of Railways
- Beijing Railway Bureau
- Shanghai Railway Bureau
- Jinan Railway Bureau
- Wuhan Railway Bureau
- Shenyang Railway Bureau
Line(s) served various
Specifications
Train length CRH2A/C: 201.4 m (661 ft)
CRH2B/E: 401.4 m (1,317 ft)
Width 3,380 mm (11 ft 1 in)
Height 3,700 mm (12 ft 2 in)
Platform height 1,200 mm (3 ft 11 in)
Maximum speed CRH2A/B/E: 250 km/h (155 mph)
CRH2C: 350 km/h (217 mph)
CRH2C stage 2
Traction system IGBT VVVF inverter control
Power output CRH2A: 4.8 MW (6,400 hp)
CRH1B/E: 9.6 MW (12,900 hp)
CRH2C (stage 1):
7.2 MW (9,700 hp)
CRH2C (stage 2):
8.76 MW (11,750 hp)
Transmission AC-DC-AC
Electric system(s) 25 kV 50 Hz AC Overhead catenary
Current collection method Pantograph
Braking system(s) Regenerative, electronically controlled pneumatic brakes
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

The CRH2 is one of the high-speed train models in China. Originally, the CRH2 was based on the E2-1000 Series Shinkansen design from Japan with the license purchased from a consortium formed of Kawasaki Heavy Industries, Mitsubishi Electric Corporation, and Hitachi, and represents the second Shinkansen train model to be exported, the other being the 700T series for Taiwan High Speed Rail.

In 2004, the Ministry of Railway in China purchased an initial 60 sets of the train from Kawasaki Heavy Industries with a maximum speed of 250 km/h (155 mph). However, the newer versions of the CRH2 are not related to the E2-1000 Series despite having the same exterior shell.[1]

History

CRH2A

The CRH2 developed from the E2 Series Shinkansen

On October 20, 2004, the Ministry of Railway in China ordered 60 sets of CRH2A trains from Kawasaki Heavy Industries in Japan. Along with 60 sets of Bombardier's Regina-based CRH1A, and 40 sets of Alstom's Pendolino-based CRH5A, these train sets are consider as first batch of CRH trains.

Each of the CRH2A set consists of 8 cars. The first 3 sets (CRH2-001A - CRH2-003A) were built in Japan, the next 6 sets (CRH2-004A - CRH2-009A) were delivered in complete knock down form and assembled by CSR Sifang Locomotive and Rolling Stock. The remaining 51 sets (CRH2-010A - CRH2-060A) were built by Sifang through technology transfer from Japan.

The first train arrived at Qingdao port on March 8, 2006 with little fanfare, and was not even publicized in China. These trains have a maximum operation speed of 250 km/h (155 mph) and started providing high-speed train service from April 18, 2007, the date of the sixth national railway speed-up.

According to Chinese and Japanese media, CRH2A trains started test trials ahead of commercial operation on the Shanghai-Hangzhou and Shanghai-Nanjing lines on January 28, 2007.

On September 14, 2010, the Chinese MOR ordered additional 40 sets of CRH2A trains (CRH2-151A - CRH2-190A) from CSR Sifang.

CRH2B

In November 2007, the Ministry of Railway in China ordered 10 CRH2 sets with 16 cars per set (8M8T). These trains have been given designations CRH2B (CRH2-111B - CRH2-120B). Each CRH2B has three 1st seating cars (ZY), twelve 2nd seating cars (ZE), and one dining car (CA). Designed maximum operation speed is 250 km/h (155 mph) with a power of 9,600 kW (12,900 hp).

The first units were delivered on June 29, 2008,[2][3] and came into service on the Hefei–Nanjing Passenger Railway on August 1, 2008.[4]

CRH2C (CRH2-300)

After the introduction of the modified E2-1000 Series, Sifang built its own CRH2 with a maximum safe operating speed of 350 km/h (220 mph). The original train sets imported from Kawasaki had a maximum safe operating speed of 250 km/h (160 mph).

During June 2005 and September 2005, The Chinese Ministry of Railways launched bidding for High speed trains with a top speed over 300 km/h (190 mph). Along with Siemens's Velaro-based CRH3C, CSR Sifang bid 60 sets of CRH2C, includes 30 sets of CRH2C stage one with a top speed of 300 km/h (190 mph), and 30 sets of CRH2C stage two with a top speed of 350 km/h (220 mph).

In development and research of the 350 km/h (220 mph) high speed train, The CRH2-300 project was launched by Chinese MOR and CSR. In 2006 the China Development Bank provided CNY 15 billion developmental financial loans to CSR Group for the projects of 200–300 km/h (120–190 mph) high speed trains.[5] Over 50 academics, 150,000 technicians, 600 contractors were involved in the project.[6]This train's livery is not like the CRH2A. Its blue stripe does not end at the fronts of trainsets.

CRH2C stage one

CRH2C Stage one is a modified version of CRH2. It has a maximum operating speed up to 300 km/h (190 mph) by replacing two intermediate trailer cars with motorized cars. Equipped with an array of the state-of-the-art technologies, including aluminum alloy body with a reduced weight, high speed turntable, high speed pantograph, and optic-fiber based integrated control system.[7]

Chinese MOR ordered 30 sets of CRH2C stage one, name code CRH2-061C - CRH2-090C. The first set, CRH2-061C was unveiled on December 22, 2007.[8][9]

During the test on April 22, 2008, CRH2-061C reached a top speed of over 370 km/h (230 mph) on Beijing-Tianjin high-speed rail.[10]

During the test on December 11, 2009, CRH2-061C reached a top speed of 394.2 km/h (244.9 mph) on Zhengzhou-Xi'an high-speed rail.[11]

Together with CRH3C, the CRH2C stage one first came into service on Beijing-Tianjin Intercity high-speed rail on August 1, 2008, and all CRH2C stage one trains have been replaced by CRH3C in April, 2009. Currently, most of these trains are serving on the Shanghai-Nanjing high speed rail.

CRH2C stage two

CRH2C Stage two is the "re-design" version of the CRH2. Some of the details, like the aluminum body structure, noise reduction technology & reduction technique, draw on the CRH3C. According to CSR Sifang, the improvements include the following aspects:

Chinese MOR ordered 30 sets of CRH2C stage two, name code CRH2-091C - CRH2-110C and CRH2-141C - CRH2-150C. The first set, CRH2-091C was unveiled in January 2010 and came into service on Zhengzhou-Xi'an high-speed rail in February, 2010.[13]

CRH2E

A CRH2E arriving Beijing West Railway Station as D924 Guangzhou-Beijing overnight train in 2015.

In November and December 2007, the Ministry of Railway in China ordered 20 CRH2 sleeper trains with 16 cars per set (8M8T). These trains are modified CRH2Bs, and have been given designations CRH2E (numbered CRH2-121E - CRH2-140E). Each CRH2E has thirteen 1st class sleeping cars (WR), two 2nd class seating cars (ZE), and one dining car (CA) or one second class/dining car (ZEC). Designed maximum operation speed is 250 km/h (155 mph) with a power of 9600 kW.

The first batch of CRH2E, CRH2-121E - CRH2-126E, came into service on Beijing-Shanghai railway on December 21, 2008.[2][14] On 23 July 2011, one sleeper coach on CRH2-139E trainset has been derailed in the 2011 Wenzhou train collision, together with CRH1-046B.

The rest of CRH2Es were deployed on Beijing–Guangzhou–Shenzhen–Hong Kong High-Speed Railway since January 2015, operating overnight sleeper trains between Beijing and Guangzhou (including some trains to Shenzhen).

CRH2-350

In 2008, the Chinese MOR & CSR launched CRH2-350 project, the main purpose is to develop new-generation of high speed trains with maximum operation speed of 380 km/h (240 mph). CRH2 is one of the fundamental platforms of the new trains, which is designated as CRH380A.

Formation

At the time of the sixth national railway speed-up, at least 37 CRH2A sets had been delivered by Kawasaki and Sifang.[15] In 2008, all 60 CRH2A sets had been delivered by Kawasaki. The post-2008 production model of the CRH2 are designed and made solely by Sifang with a maximum safe operation speed of 350 km/h (220 mph).[1]

Power Destination

Coach Type

CRH2A

Coach No. 12345678
Type1 ZE ZEC ZE ZY ZE
Type2 ZE ZY ZE ZEC ZE ZY ZE
Type3 ZY ZE ZEC ZE ZY
Type4 ZE ZEC ZY ZE
Type5 (Second Batch) ZE ZYE ZE ZEC ZE ZY ZE
Type6 (EC) ZY ZE ZEC ZE
Power Configuration TC M TP T MP M TC
Power Units Unit 1 Unit 2
Capacity1 55 100 85 100 55 100 51 64
Capacity2 55 100 46 100 55 100 51 64
Capacity3 44 83 85 100 55 100 51 44
Capacity4 55 100 85 100 55 78 51 64
Capacity5 55 100 59 100 71 100 51 64
Capacity6 48 90 90 77 63 90 90 65

CRH2B

Coach No. 12345678910111213141516
Type ZY ZE CA ZE
Power Configuration TC M TP T M T M T TP M TC
Power Units Unit 1 Unit 2 Unit 3 Unit 4
Capacity 36 68 51 100 85 100 85 85 100 85 100 85 100 85 65

CRH2C

Coach No. 12345678
Type ZE ZEC ZE ZY ZE
Power Configuration TC M MP M MP M TC
Power Units Unit 1 Unit 2
Capacity 55 100 85 100 71 100 51 64

CRH2E

Coach No. 12345678910111213141516
Type ZE WR CA WR ZE
Power Configuration TC M TP T M T M T TP M TC
Power Units Unit 1 Unit 2 Unit 3 Unit 4
Capacity 55 40 40 40 40 40 40 0 40 40 40 40 40 40 40 55

Distribution

As of February, 2011

Operator Quantity Series number Lines serving Note
CRH2A
Beijing Railway Bureau4CRH2-028A、CRH2-037A、
CRH2-043A、CRH2-044A
Jinghu RailwayJingha Railway
Xi'an Railway Bureau1CRH2-038ALonghai Railway
Wuhan Railway Bureau25CRH2-011A、CRH2-018A、CRH2-019A、CRH2-022A、
CRH2-027A、CRH2-029A、CRH2-033A、CRH2-034A、
CRH2-039A、CRH2-040A、CRH2-045A ~ CRH2-056A、
CRH2-059A、CRH2-060A、CRH2-162A
Jingguang RailwayJinghu Railway
Handan Railway、Xiangyu Railway
Hening PDL-Hewu PDL
Shenyang Railway Bureau2CRH2-057A、CRH2-058AJingha RailwayJinghu Railway
Shanghai Railway Bureau25CRH2-002A ~ CRH2-009A、CRH2-014A、CRH2-020A、
CRH2-021A、CRH2-023A ~ CRH2-025A、CRH2-030A、
CRH2-156A ~ CRH2-161A、CRH2-165A ~ CRH2-168A
Jinghu Railway、Hukun Railway、
Jingguang Railway、Hangyong Railway、
Yongtaiwen PDL、Wenfu PDL、
Hening PDL-Hewu PDL、Huhag PDL
Nanchang Railway Bureau22CRH2-012A、CRH2-013A、CRH2-015A ~ CRH2-017A、
CRH2-026A、CRH2-031A、CRH2-032A、CRH2-035A、
CRH2-036A、CRH2-041A、CRH2-151A~ CRH2-155A、
CRH2-163A、 CRH2-164A、CRH2-169A ~ CRH2-172A
Yongtaiwen PDL、Wenfu PDL、
Hukun Railway、Hangyong Railway、
Fuxia PDL、Changjiu ICL
China MOR2CRH2-001A、CRH2-042AOfficial Train
1CRH2-010ATrack Inspection Train
CRH2B
Shanghai Railway Bureau10CRH2-111B ~ CRH2-120BHening PDL、Hukun Railway、
Yongtaiwen PDL、Wenfu PDL、Huhang PDL
CRH2C
Shanghai Railway Bureau27CRH2-062C ~ CRH2-067C、CRH2-069C ~ CRH2-090CHuning PDL、Huhang PDL
2CRH2-068C、
CRH2-150C(CIT380A)
Track Inspection Train
Wuhan Railway Bureau20CRH2-097C~CRH2-110C、
CRH2-141C~CRH2-144C、
CRH2-148C、CRH2-149C
Wuguang PDL
Xi'an Railway Bureau9CRH2-091C ~ CRH2-096C、CRH2-145C ~ CRH2-147CZhengxi PDL
China MOR1CRH2-061CTrack Inspection Train
CRH2E
Beijing Railway Bureau10CRH2-121E ~ CRH2-125E、
CRH2-131E、CRH2-133E、
CRH2-137E ~ CRH2-140E
Jinghu Railway、Huhang PDL (CRH2-139E was written off in Wenzhou train collision )
Nanchang Railway Bureau4CRH2-126E、CRH2-128E、
CRH2-134E、CRH2-136E
Fuxia PDLSleeper berths apparently converted to seats;[16] no overnight trains are scheduled on the Fuxia line in 2012.
Shanghai Railway Bureau5CRH2-127E、CRH2-129E、
CRH2-130E、CRH2-132E、
CRH2-135E
Jinghu Railway

See also

References

External links

Media related to China Railways CRH2 at Wikimedia Commons

This article is issued from Wikipedia - version of the Thursday, December 03, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.