Brazos Wind Farm
Brazos Wind Farm | |
---|---|
Brazos Wind Farm, Fluvanna, Texas | |
Brazos Wind Ranch | |
Country | United States |
Location | Fluvanna, Texas |
Coordinates | 32°57′00″N 101°08′49″W / 32.949889°N 101.146912°WCoordinates: 32°57′00″N 101°08′49″W / 32.949889°N 101.146912°W |
Commission date | 2003 |
Owner(s) | Mitsui, Shell Wind Energy |
Power generation | |
Units operational | 160 |
Make and model | Mitsubishi |
Nameplate capacity | 160 MW |
The Brazos Wind Farm, also known as the Green Mountain Energy Wind Farm at Brazos, is located in Borden and Scurry counties in Texas. It has 160 wind turbines, each rated at one megawatt (MW) and supplied by Mitsubishi, and was completed in December 2003.[1] The wind farm sells generated power on a long-term basis to a local power distributor, TXU Energy, to supply approximately 30,000 homes in Texas. 50% of the Brazos Wind Farm is owned by Shell Wind Energy, Inc.[2]
See also
References
|
This article is issued from Wikipedia - version of the Sunday, March 01, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.