Birsa Munda Athletics Stadium
Full name | Birsa Munda Athletics Stadium |
---|---|
Location | Ranchi, India |
Owner | Government of Jharkhand |
Capacity | 35,000 |
Surface | Grass |
Construction | |
Broke ground | 2006 |
Opened | 2009 |
Construction cost | ₹ 1.35 billion |
Architect | Arun Lamba Consultants |
Tenants | |
2011 National Games of India |
Birsa Munda Athletics Stadium is a stadium in Ranchi, India. It hosted the opening and closing ceremonies of the 2011 National Games of India. It has seating capacity of 35,000 spectators.[1]
Features
Stadium
Not many know that the grand Birsa Munda Athletics Stadium was the inspiration behind the renovation of Delhi’s Jawaharlal Nehru Stadium, Delhi that hosted the opening and closing ceremonies of the 2010 Commonwealth Games. Among the ideas adopted by CWG organisers was the imported, dust and fireproof roof that has been used in the Ranchi stadium, which boasts a seating capacity of 35,000. To host all the athletics events, apart from the opening and closing ceremonies, the main stadium occupies pride of place in the 275-acre Mega Sports Complex. With its many elliptical pylons and ramps that lead to the upper tiers, it adds to the futuristic look of the area that houses seven other smaller stadiums.
Roof
The stadium’s fire-, dust- and rust-proof roof is made of polytetrafluoroethylene (PTFE). Designed by an Australian firm, the 11,550 square metre roof material was imported from Japan for ₹ 80 million and took four months to fix. It is maintenance free and has a 15-year warranty. The stadium has two such roofs, one at the VVIP section and one at the press box.
Flood lights
Four towers of high-lux lights are installed for conducting sports events at night.
Lifts
As many as 12 double lifts have been fitted in the stadium. Four towers in the corners connect to middle and upper galleries. The pathways are designed to allow wheelchairs till the upper tier. Visitors will take this route. But, there will be no overcrowding or security problems when VVIPs and players enter the stadium. The disabled, too, can reach the top gallery without any difficulty.
Warm Up
An air-conditioned enclosure inside houses a six-lane warm-up track of 80 meters. No athletics stadium in India has such tracks. Participants can use this half-an-hour before their events.
Track
The synthetic track, designed according to international standards, is imported from Switzerland. The grass, however, is home grown – from Chennai.
Space Age Design
Doing away with cemented pillars, 62 elliptical pylon columns of 20 meters in height surround the stadium, which, from some angles, resemble a spaceship.
State Lounges
Thirty-six lounges, with all basic facilities, are being prepared on the ground floor to accommodate state contingents. Besides, there are 32 dormitories that can accommodate 1,000 people.