Bayfront MRT Station

 CE1  DT16 
Bayfront MRT Station
海湾舫地铁站
பேஃபிரண்ட்
Stesen MRT Bayfront
Rapid transit

Escalators of Bayfront station
Location 11 Bayfront Avenue
Singapore 018957
Coordinates 1°16′56″N 103°51′34″E / 1.282347°N 103.859317°E / 1.282347; 103.859317
Operated by SMRT Trains (SMRT Corporation) (Circle Line)
SBS Transit DTL (Downtown Line)
Line(s)
Platforms Stacked Island
Tracks 4
Connections Bus, Taxi
Construction
Structure type Underground
Platform levels 4
Disabled access Yes
Other information
Station code  CE1  DT16 
Fare zone 1
History
Opened 14 January 2012 (Circle Line)
22 December 2013 (Downtown Line)
Services
Preceding station   Mass Rapid Transit   Following station
towards Stadium
Circle Line
Stadium Shuttle
Terminus
towards Bukit Panjang
Downtown Line
towards Chinatown
Location
Platform at Bayfront MRT station.

Bayfront MRT Station (CE1/DT16) is an underground Mass Rapid Transit station located in the Marina Bay area. The station connects the Circle Line and Downtown Line via a cross platform interchange. Due to the two lines being run by different operators, it's the only jointly managed station in Singapore.[1] Serving mainly the Marina Bay Sands hotel and casino, an underground walkway also provides visitors with convenient passage to Gardens by the Bay.

Art in Transit

Titled as "When the Ships Comes In" by Lee Wen is a mural, composed of a collage, located on the underground linkway of the station. The collage of images of ships, drawn by young Singaporeans, brings a remembrance of the past of Port of Singapore and Singapore's future hopes.[2]

Station layout

L1 Street Level Marina Bay Sands, Bayfront Avenue
B1 Concourse Faregates, Ticketing Machines, Station Control, Transitlink Counter, Shops
B2 Platform A Downtown Line towards  DT19  NE4  Chinatown via  DT17  Downtown (←)
Island platform, doors will open on the left, right
Platform B Circle Line towards  CE2  NS27  Marina Bay (←)
B3 Platform C Downtown Line towards  DT1  BP6  Bukit Panjang via  DT15  CC4  Promenade (→)
Island platform, doors will open on the left, right
Platform D Circle Line towards  CC6  Stadium via  CC4  DT15  Promenade (→)
Downtown Line platforms

Exits

Transport connections

Rail

Destination First Train Last Train
Mon – Sat Sunday &
Public Holiday
Daily
Circle Line
to CC6 Stadium 6.02am 6.26am 11.57pm
to CE2 Marina Bay 6.17am 6.37am 11.51pm
Downtown Line
to DT1 Bukit Panjang 6.15am 6.33am 12.15am
to DT19 Chinatown 6.02am 6.22am 12.07am

Notable landmarks

References

  1. "Land Transport Masterplan: Downtown Line Stage 1 to open on Dec 22". The Straits Times. Retrieved 7 October 2013.
  2. "Downtown Line 1: Art-In-Transit" (PDF). Land Transport Authority. Retrieved 16 October 2013.

External links

Wikimedia Commons has media related to Bayfront MRT Station.


This article is issued from Wikipedia - version of the Tuesday, January 19, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.