Alterra Power

Alterra Power
Public
Traded as TSX: AXY
OTC Pink: MGMXF
Industry Renewable energy
Predecessor Magma Energy
Plutonic Power
Headquarters Vancouver, Canada
Key people
Ross Beaty,
Executive Chairman
Donald McInnes, Executive Vice Chairman
John Carson, CEO[1]
Products geothermal power
Run-of-the-river hydroelectricity
Wind power
Solar Power[2]
Subsidiaries HS Orka
Website www.alterrapower.ca

Alterra Power Corp. is a diversified renewable power generation company based in Vancouver, British Columbia, Canada. It was formed in 2011 through the merger of Magma Energy Corp. and Plutonic Power Corp. It develops geothermal, hydroelectric, wind, and solar energy projects. The company is listed under AXY on the Toronto Stock Exchange, and has a secondary listing OTC in the USA under MGMXF:US.[3]

Toba Montrose Run of River Power Plant Intake

Merger

On 7 March 2011, it was announced that Magma Energy and Plutonic Power would merge to create Alterra Power Corp.[4] Magma Energy was renamed Alterra Power and each shareholder of Plutonic Power received 2.38 shares of Magma for each Plutonic share held. As a result, the merged company owns two geothermal power plants in Iceland, and one in Nevada, one run of river hydro plant and one wind farm in British Columbia and an option on a solar project in Ontario. Executive Chairman of Alterra Power is Ross Beaty (founder of Magma Energy) and the CEO is John Carson.[5]

Power plants

Name Technology Location Nameplate Capacity
Toba Montrose Run of River British Columbia, Canada 235 MW
Reykjanes Geothermal Reykjanes Peninsula, Iceland 100 MW
Svartsengi Geothermal Svartsengi Geothermal Field, Iceland 72 MW
Soda Lake Geothermal Nevada, USA 23 MW
Dokie 1 Wind Power British Columbia, Canada 144 MW
ABW Solar Power Ontario, Canada 50 MW

Expansion projects

Run of river expansions

Its proposed 40 run of river hydroelectric development projects have a design capacity of nearly 2,000 MW with the potential to generate approximately 5000 GWh per annum of green energy - enough energy to meet the annual energy needs of over 500,000 homes.

Included in the 40 projects is the creation of the Green Power Corridor, a series of non-storage hydroelectric projects in southwestern BC, which hold the potential to bring British Columbia to the forefront of green energy generation in North America. The completion of the corridor would create approximately 4,000 person-years of employment.

Partnership has started construction on the Toba River energy development located 100 km North of Powell River, British Columbia, Canada. Construction services for the 196 MW run of river project is overseen by Peter Kiewit Inc. a subsidiary of the Kiewit Corporation and will produce 745 GWh/a of electricity and at an approximate cost of $660,000,000.[6] Once complete it will be the largest private funded renewable energy project in British Columbia history.

Upper Toba Valley

The Upper Toba Valley Hydroelectric project[7] consists of two renewable green power facilities constructed at the headwaters of the Toba Inlet on Jimmie Creek and the Upper Toba River. Installed capacity of the two facilities is 124 MW with an expected annual energy generation of 316 GW hr/yr. Alterra has received an Energy Purchase Agreement from BC Hydro to construct the Upper Toba facility.[8]

Bute Inlet

The Bute Inlet Hydroelectric project[9] consists of 17 facilities at the headwaters of Bute Inlet, located about 150–200 km (93–124 mi) north of Powell River, British Columbia. Combined, these facilities have a potential capacity of 1027 MW with potential energy generation of 2905 GWh per year.

This project was not awarded an energy contract from BC Hydro, and therefore is currently not proceeding.

Solar power expansions

In early 2011, Plutonic Power agreed, together with GE Energy financial Services, to purchase three proposed photovoltaic power plants in Ontario from First Solar. The three plants will have a total capacity of 50 MW, divided between Amherstburg (10MW), Belmont (20MW) and Walpole (20MW). This represents a first venture into solar power for Plutonic Power although engineering, procurement, construction and operation will still be provided by First Solar.[10]

Orka's controversy

In 2010, during the Icelandic financial crisis, Magma Energy acquired 98.5% of shares in the Icelandic geothermal power company HS Orka.[11] The deal created an opposition in Iceland. On May 21, 2010 Icelandic singer Björk wrote an open letter in the newspaper Reykjavík Grapevine, calling on the Icelandic government to "do everything in its power to revoke the contracts with Magma Energy".[12]

The deal was approved by the Icelandic Government.[13]

References

External links

This article is issued from Wikipedia - version of the Saturday, November 07, 2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.