Addis Ababa Light Rail

Addis Ababa Light Rail
Overview
Native name የአዲስ አበባ ቀላል ባቡር
Locale Addis Ababa, Ethiopia
Transit type Light rail
Number of lines 2
Number of stations 39
Daily ridership 200,000[1]
Operation
Began operation 20 September 2015 (2015-09-20)
Operator(s) Ethiopian Railway Corporation, Shenzhen Metro
Number of vehicles 41
Technical
System length 31.6 km (19.6 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750V DC[2] Overhead catenary
Top speed 70 km/h (43 mph)
System map

Addis Ababa Light Rail (Amharic: የአዲስ አበባ ቀላል ባቡር) is a light rail transportation system in Addis Ababa, Ethiopia.[3] A 17-kilometre (11 mi) line running from the city centre to industrial areas in the south of the city opened on 20 September 2015.[4][5] Service began on 9 November 2015 for the second line (west-east).[6][7] The total length of both lines is 31.6 kilometres (19.6 mi), with 39 stations.[6] Trains are expected to be able to reach maximum speeds of 70 km/h (43 mph).[8]

The railway was contracted by the China Railway Group Limited. The Ethiopian Railways Corporation began construction of the double track electrified light rail transit project in December 2011 after securing funds from the Export-Import Bank of China.[9] Trial operations were begun on 1 February 2015,[8] with several months of testing following that.[10] It is operated by the Shenzhen Metro Group.[11]

Overview

Light Rail Traffic Circle (Mexico Square)
Light Rail running through parallel to the street (Haile Gebreselassie Avenue)

This light-rail system was the first to be built in sub-saharan Africa.[4][5] Of the two line rail lines, the east-west line will extend 17.4 kilometres (10.8 mi), stretching from Ayat Village to Torhailoch, and passing through Megenagna, Legehar and Mexico Square. The north-south line, which is 16.9 kilometres (10.5 mi) in length, passes through Menelik II Square, Merkato, Lideta, Legehar, Meskel Square, Gotera and Kaliti. However, two lines have a common track of about 2.7 km.[9] Fares cost 2-6 Ethiopian birr.[4][5]

The final cost to build the railway was US$475m, with construction taking three years.[5] The Addis Ababa Light Rail was originally to have a total of 41 stations on its two lines, and each train was planned have a capacity to carry 286 passengers. This will enable the light rail transit to provide a transportation service to 15,000 passengers per hour per direction (PPHPD) and 60,000 in all four directions.[9] The railway lines have their own dedicated power grid.[5][12]

Future expansion

There are future plans for extensions in all four directions. According to Getachew Betru, CEO of Ethiopian Railways Corporation, the Ethiopian government indicated that any new line built should be completely grade-separated. Apart from extending the existing lines, two new lines are under consideration by the Ethiopian government. The first one will start at St. George's Cathedral, pass along Mexico Square to the African Union Headquarters and will terminate at Lebu, connecting to the new national rail network. The second line will start at Megenagna Roundabout and passes via Bole Airport, Wello Sefer area, Saris market area and Jommo area and terminates at Lebu.[13]

Rolling stock

Addis Ababa Light Rail operates currently a fleet of 41 three-section 70% low-floor trams manufactured by CNR Changchun.[14]

See also

References

  1. "Expansion of LRT will commence in 2016". capitalethiopia.com.
  2. "A Bridge Too Far". addisfortune.net.
  3. "Addis Light Rail Progress". Railways Africa. 2 October 2013. Retrieved 2013-11-25.
  4. 1 2 3 Sahle, Eden (22 September 2015). "Ethiopia: Addis Light Rail Eases Transportation Problem". AllAfrica. Retrieved 2015-09-23.
  5. 1 2 3 4 5 "Sub-Saharan Africa gets its first metro". The Economist. 22 September 2015. Retrieved 2015-11-14.
  6. 1 2 Asrat, Amare (10 November 2015). "Addis light rail Hayat - Torhailoch route begins operation". Ethiopian News Agency (Addis Ababa). Retrieved 2015-11-13.
  7. "Addis Ababa opens second light rail line". Railway Gazette International. 12 November 2015. Retrieved 2015-11-14.
  8. 1 2 "中国企业承建的埃塞俄比亚首都城市轻轨开始试运行(高清组图)". ifeng.com (in Chinese). 2 February 2015.
  9. 1 2 3 "Corporation discloses/Addis light rail project detail". The Ethiopian Herald. 10 March 2013. Archived from the original on 2013-03-11. Retrieved 2014-10-25.
  10. "Ethiopia: Addis Light Railway to Go Operational Next Month". AllAfrica. 30 December 2014. Retrieved 2015-01-26.
  11. "Shenzhen Metro Group to operate Ethiopian light rail". Shenzhen Daily. 4 December 2014. Retrieved 2015-09-21.
  12. Nurse, Earl (2 November 2015). "Sub-Saharan Africa gets its first metro". CNN. Retrieved 2015-11-14.
  13. "Ride along". The Reporter Ethiopia. 26 September 2015. Retrieved 2015-11-17.
  14. "Addis Ababa opens second light rail line". Railway Gazette International. 12 November 2015. Retrieved 2015-11-14.

External links

This article is issued from Wikipedia - version of the Wednesday, January 13, 2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.