Yellowhead Trail (Edmonton)
Maintained by |
the City of Edmonton & Alberta Transportation |
---|---|
Location | Edmonton |
West end | City Limits (231 Street) |
Major junctions | Anthony Henday Drive, 170 Street, St. Albert Trail, 97 Street, 50 Street |
East end | City Limits (east of Highway 216) |
The Yellowhead Trail is the portion of Highway 16 that passes through the City of Edmonton. It is the major east-west corridor through the north side of the city. Residents of Edmonton's suburbs, Stony Plain and Spruce Grove in the west and Sherwood Park in the east, use the Yellowhead on their commute to the city. Interchanges already exist at eleven intersections throughout the city limits, but traffic is often jammed at the many intersections still using traffic lights. Current plans call for the Yellowhead Trail to be upgraded to a fully functioning freeway.[1]
Interchanges and intersections
Hwy | Exit | Intersecting road | Current intersection type | Planned upgrade |
---|---|---|---|---|
Range Road 261 / Hill View Road / 231 Street | At-grade (no crossover) | Interchange planned[2] | ||
376 | Winterburn Road (215 Street) | Diamond interchange | ||
378 | Anthony Henday Drive (Highway 216) | Cloverstack | ||
379 | 184 Street | Folded diamond interchange | ||
381 | 170 Street | Diamond interchange | ||
383 | 156 Street | Folded diamond interchange | ||
151 Street | At-grade (westbound only) | |||
End Freeway | ||||
149 Street | At-grade (traffic lights) | Interchange planned [3] | ||
145 Street | At-grade | At-grade (median closure, right turns only)[4] | ||
143 Street | At-grade | At-grade (median closure, right turns only)[4] | ||
142 Street | At-grade (traffic lights) | Intersection closure[4] | ||
385 | St. Albert Trail (Highway 2) | Diamond interchange | ||
127 Street | At-grade (traffic lights) | Interchange planned [3] | ||
124 Street | At-grade (traffic lights) | Intersection closure[4] | ||
121 Street | At-grade (traffic lights) | Interchange planned (location to be determined)[3] | ||
107 Street | At-grade (traffic lights) | |||
389 | 97 Street (Highway 28) | Diamond interchange | ||
89 Street | At-grade (traffic lights) | Intersection closure[4] | ||
391 | 82 Street | Diamond interchange | ||
392 | Fort Road / Wayne Gretzky Drive | Single-point urban interchange | Diverging diamond interchange[4] | |
68 Street | At-grade | Intersection closure[4] | ||
67 Street | At-grade | Intersection closure[4] | ||
66 Street | At-grade (traffic lights) | Under review[4] | ||
62 Street | At-grade | At-grade (median closure, right turns only)[4] | ||
Begin Freeway | ||||
61 Street | At-grade (westbound only) | |||
394 | 50 Street (Highway 15) | Diamond interchange | ||
396 | Victoria Trail | Folded diamond interchange | ||
397 | Hayter Road / 17 Street | Folded diamond interchange | ||
398 | Anthony Henday Drive (Highway 216) | Partial cloverleaf interchange | Stack interchange[5] | |
400 | Broadmoor Boulevard | Partial cloverleaf interchange | Folded diamond[5] | |
403 | Sherwood Drive | At-grade (no crossover) | Diamond interchange[5] | |
405 | Clover Bar Road | Partial cloverleaf | Diamond interchange[5] | |
406 | Highway 21 | Partial cloverleaf | Stack interchange[5] | |
Upgrade under construction • Upgrade planned |
References
- ↑ http://www.cbc.ca/news/canada/edmonton/story/2011/06/09/edmonton-yellowhead-proposal.html
- ↑ http://www.edmontonjournal.com/news/Edmonton+faces+overpass+building+boom+report/5041414/story.html
- ↑ 3.0 3.1 3.2 http://www.edmonton.ca/transportation/YellowheadTrail_OverviewMap.pdf
- ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 http://www.edmonton.ca/transportation/YellowheadTrailProjectStatusReport-ExecutiveSummary.pdf
- ↑ 5.0 5.1 5.2 5.3 5.4 http://www.transportation.alberta.ca/Content/docType353/production/combined_plan_prof_ultimate.pdf