Watford DC Line

Watford DC Line

378210 at Watford Junction with a service from London Euston.
Overview
Type Commuter rail, Rapid transit
System National Rail
London Underground
Status Operational
Locale Greater London
Hertfordshire
Termini London Euston
Watford Junction
Stations 19
Services 2
Operation
Owner Network Rail
Operator(s) London Overground
London Underground (Bakerloo line)
Depot(s) Stonebridge Park (LUL)
Willesden TMD
Rolling stock Class 378 "Capitalstar"
London Underground 1972 Stock
Technical
No. of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 660 V DC third rail

Watford DC Line

Legend
 DC WCML
DC line is the central straight line
West Coast Main Line
Abbey Line
to St Albans Abbey

Watford Junction(London Underground - from 2018)

Watford High Street(London Underground - from 2018)

Metropolitan line
Croxley Rail Link (opens 2018)

Bushey
Carpenders Park(1914-52)
Carpenders Park
Hatch End
Headstone Lane

End of line for Bakerloo line services

Harrow & Wealdstone London Underground
Branch to Stanmore Village (closed 1964)

Kenton London Underground

Metropolitan line
London to Aylesbury Line

South Kenton London Underground
North Wembley London Underground
Chiltern Main Line

Wembley Central London Underground

Stonebridge Park Depot Bakerloo Line

Wembley Yard
Stonebridge Park London Underground
A406 North Circular Road
Harlesden London Underground
Willesden
Dudding Hill Line
North London Line
to Richmond (London)

Willesden Junction London Underground London Overground

North London Line
to Stratford via Camden Road and Dalston Kingsland

West London Line
to Clapham Junction and South Croydon

Willesden TMD
Kensal Green London Underground

Queen's Park north sheds Bakerloo Line

Queen's Park London Underground

Queen's Park south sheds Bakerloo Line

Bakerloo line

Kilburn High Road
South Hampstead
Chiltern Main Line
◄ to Marylebone, ► to Birmingham Snow Hill

Metropolitan line
Jubilee line

Primrose Hill(
WCML 1851-1915
NLL 1855-1992

)

Camden carriage sidings

North London Line
Regent's Canal

Euston Downside carriage sidings
London Euston London Underground

The Watford DC Line is a commuter railway line from London Euston to Watford Junction. Services on the line are operated by London Overground. The line runs beside the West Coast Main Line (WCML) for most of its length. The London Underground Bakerloo line shares the track of the line from Queen's Park to Harrow & Wealdstone. The London Overground rolling stock used on the line is Class 378 "Capitalstar".

The line was electrified in the early twentieth century with direct current (giving compatibility with the London Underground's four-rail system and the contemporary North London Line electrification), hence its name in contrast to the more modern overhead alternating current system on the adjacent WCML.

History

Services on this line began when London and North Western Railway (LNWR) completed the Camden to Watford Junction New Line in 1922, to provide additional suburban capacity and more outer-suburban services running non-stop to Euston. It incorporated part of the LNWR Rickmansworth branch (formerly the Watford and Rickmansworth Railway) between Watford Junction and Watford High Street Junction and part of the original Slow Main Line between Queen's Park and South Hampstead stations; two single-track tunnels take the line from South Hampstead to Camden, whence the line reaches Euston station by the main line tracks. Prior to 1922, at which time the entire route was finally electrified, services were steam operated. Although the operation of the line is mostly self-contained, connections at Watford Junction and Camden allow other trains onto it, a facility used occasionally with trains diverted from the West Coast Main Line should an alternative diversionary route be not available.

Signalling

The line opened with conventional semaphore signalling mechanically operated from signal boxes at each station; this system remained in use after electrification.
The London, Midland and Scottish Railway introduced an automatic electric signalling system in the early 1930s over most of the route and some signal boxes were abolished. A similar system was also used for a shorter period between Bromley-by-Bow and Upminster now part of the District line. The very closely spaced mix of automatic and semi-automatic signals, repeater signals, and auxiliary calling-on aspects was intended to let trains to proceed, after a set delay, at low speed past "failed" signals on track with no junctions without the need to contact a signalman, but this could lead to a nose-to-tail queue of trains as they all reached the location of a real line blockage.

Train stops were provided (except at repeater signals) to allow LER trains to operate over the line without the special provision of a second man; this enabled the same practice to be continued with all other Underground and main line stock subsequently allocated to this line and which was provided with trip equipment.

Signal boxes remaining in use in the early 1970s included:

Normally Kilburn High Road and Stonebridge Power House which controlled only plain track with crossovers were switched out and only Queens Park, Willesden and Harrow boxes were staffed for at least part of the day, to deal with junction and siding traffic. In the early 1980s manual control of signalling was needed for a few months after dragging gear on a train destroyed many electric train-stops which were of a design almost confined to this line (LU train-stops are mostly electro-pneumatic). By this time the signal boxes at Stonebridge Power House and Kilburn High Road had been abolished. Emergency crossovers at other locations were controlled by ground frames enclosed in structures the size of a garden shed.

In 1988 the LMS system was replaced by a more standard system controlled from a new signal box, Willesden Suburban, and the remaining local boxes were abolished. The new system had solid state interlocking, but far fewer signals; as a consequence the maximum traffic capacity of the line was severely reduced. In the early 1960s there were headways of less than 2 minutes between Harrow & Wealdstone and Willesden Junction stations, the section of line used by nearly all services.

In the early 2000s Willesden Suburban was closed and control passed to Wembley Main Line Signalling Centre.

Electrification

An Oerlikon electric train at Harrow and Wealdstone (1956)

The original electrification was on a fourth rail system, similar to that now used by London Underground, which allowed LER trains to use the New Line. Power was supplied from the railway's own power station at Stonebridge Park until the 1960s when it was closed, after which it has been obtained from public supplies. As originally installed, there was provision for interconnection of the high voltage section of the power station to adjacent public supplies for output or intake but this ceased when national supplies were standardised at 50 Hz. This power station was used for both internal and external scenes in an early episode of the BBC series Doctor Who in which the building can be seen substantially as it was at the time of closure but after the wooden cooling towers had been removed.

In the late 1950s, the original electric multiple units built for the line were replaced by new Class 501 rolling stock. These were in turn displaced in the mid 1980s by Class 313 units. The line is now operated by London Overground Class 378 "Capitalstar" units.

In the 1970s, the track and the rolling stock used on this line and the North London Line were changed to use a modified version of the BR standard third rail system, with the fourth rail (now bonded to the running rail used for returning traction current) left in place on the sections of line shared with LU Bakerloo line trains. North of Harrow & Wealdstone, now the limit of LU operation, the fourth rail has in most places been dropped onto the sleepers and remains bonded, thus leaving the resistance of the current return path unaltered. The fourth rail remains in the normal position from Queens Park to Kilburn High Road Up platform, where a trailing crossover between those two stations is maintained in use to allow reversal of Bakerloo line trains unable to gain access to London Underground at Queens Park, due to planned work or other reasons. The line is currently electrified (like all shared lines) using the standard compromise voltage of 660 volts. This falls comfortably within the lower permanent voltage limit for the Capitalstar stock (500 volts) and the upper permanent voltage limit for the 1972 tube stock (760 volts).[1]

A consequence of converting to third rail with the fourth rail provided only for LU use was that both planned and emergency use of the line by other 3-rail-capable trains was possible. Ignoring recent use of class 508 trains, this last took place when class 416 trains were diverted to Willesden Junction Low Level station when part of the North London Line was closed for a number of weeks in the late 1980s.

The electricity grid Willesden substation in Acton Lane, Park Royal supplies 11 kV, three-phase power to ten substations on the line, located at Camden, South Hampstead, Queens Park, Willesden, Harlesden, Wembley, Kenton, Harrow, Hatch End, Bushey and Watford.

Growth

The construction of a curve to link Rickmansworth (Church Street) to the Euston main line was planned. A new line would have then run south to Wembley, then passed under the main line and run on the east side to Euston, terminating in a loop.

The loop was dropped on grounds of cost and, instead, services terminated at Euston main platforms or ran on the North London Railway to Broad Street. Pressure from local groups led to the building of a curve near Bushey, diverting the main route for new services over the existing branch line north to Watford Junction instead of south to Rickmansworth. In 1917 LER Bakerloo line services were extended over the New Line from Queen's Park station to Watford Junction.

Decline

Bakerloo line services were cut back in stages and ceased north of Stonebridge Park station in 1982; in 1984 they were restored as far as Harrow and Wealdstone.

The Croxley Green branch fell into disuse in the 1990s, and is now derelict. It is planned to divert the Metropolitan line over the branch and on to Watford Junction (for more information see Croxley Rail Link). Some clearance or preparatory work has been reported [2] as having occurred in late 2006.

Operators

The line was operated by British Rail (from 1986 as Network SouthEast) until privatisation. From March 1997 until November 2007, the line was operated by Silverlink.

In November 2007 Transport for London (TfL) took full management control of all the intermediate Watford DC Line stations as part of the London Overground (LO) service with staffing during opening hours, automatic ticket gates and planned station refurbishment to the standard of the Tube network.

Services

An Overground train calls at Harlesden
The line is also shared with London Underground

The local passenger services which run over the DC line are:

During the partial closure of the North London Line in autumn 2008, London Overground's Monday to Saturday services were diverted away from Euston, running instead via Camden Road onto the North London Line and on to Stratford; the Sunday service was normal.

London Midland also run a fast service between Watford Junction and London Euston along the West Coast Main Line (which runs parallel to the Watford DC Line), calling at Bushey and Harrow & Wealdstone before running non-stop to Euston. The service offers a quicker alternative to the all-stations London Overground service, especially as the operator now accepts TfL's Oystercard ticketing. Some peak services to/from Euston are advertised as starting/terminating at South Hampstead or Queens Park or Harrow and Wealdstone in order to persuade passengers to take the frequent faster services.

Discontinued services

Past services have included:

When the south curve of the triangular junction between Watford High Street and Bushey existed, a few trains used Croxley depot (now demolished), which was shared by LU and BR trains.

Future

Bakerloo line

This map depicts what the London Overground network would look like if the Bakerloo line was extended to Watford Junction. The Watford line of the Overground would be discontinued.[3]

Various proposals have been made to alter services involving both extending or truncating Bakerloo Line services but there has been no basic change until 2015 other than to rolling stock and service patterns. As of 2015, plans and suggestions (from official bodies and others) connected to development of CrossRail and the Old Oak Common area have current potential consequences.

Past proposals not put into action

The Autumn 2006 document from TfL, "A Rail Strategy for London's Future", said that the plan was eventually to transfer the Watford DC Line north of Harrow & Wealdstone to the Bakerloo line,[4] effectively ending the Watford DC Line. The London Overground service would then have operated from Queen's Park to Primrose Hill Junction, serving South Hampstead and Kilburn High Road; from there using the currently freight-only line to Camden Road (potentially leading to the re-opening of the disused (but now mostly demolished) Primrose Hill station for interchange with Chalk Farm on the Northern line); and onwards to Stratford via the North London Line.[5] However, this will mean losing a direct link from the Bakerloo line's main railway to Euston station, as DC trains would be withdrawn between Primrose Hill Junction and Euston.

No date was specified for this change; prospective tube maps illustrating the future of London Overground and Underground services continued to show the Watford line as part of the Overground network in 2010.[6] The Best And Final Bid documentation for the Croxley Rail Link project indicates that this extension is now "unlikely" because "TfL’s plans to extend the Bakerloo line to Watford Junction are on hold indefinitely due to funding and business case constraints."[7]

The diversion of the Metropolitan line to Watford Junction continues to be represented as an ongoing project [8] with no apparent mention of Bakerloo Line services.

Metropolitan line

A diagram of the proposed rail services
Main article: Croxley Rail Link

Another proposal to bring London Underground service to Watford Junction is the Croxley Rail Link, which envisages diverting the Watford branch of the Metropolitan line along a re-opened stretch of track to the west of Watford, effectively reinstating the former Croxley Green to Watford Junction service. Underground trains would then join the DC line at Watford High Street, potentially forming an interchange either with London Overground or the Bakerloo line, depending on the outcome of other projects.

References

  1. BS EN 50163
  2. uk.railway internet newsgroup
  3. "Geographical map of London Overground 2010". Transport for London. November 2007. Archived from the original on 29 February 2008. Retrieved 29 October 2013.
  4. "A Rail Strategy for London's Future" (PDF). Transport for London. Autumn 2006. - page 45
  5. "Response to Network Rail’s Draft Cross-London Route Utilisation Strategy" (PDF). Transport for London/London Rail. Retrieved 2008-08-25. - page 9
  6. "2010 Tube map". Transport for London. 2007. Archived from the original on 1 July 2007. Retrieved 29 October 2013.
  7. "Croxley Rail Link BAFB Value For Money Annex" (PDF). steer davis gleave. 2011. Retrieved 2011-11-29.
  8. Croxley Rail Link

External links