Węgliniec–Roßlau railway

Węgliniec–Roßlau (Elbe)
Route number:216, 228, 229
Line number:DB 6207
PLK 295
Line length:233.2
Track gauge:1435
Voltage:Węgliniec–Staatsgrenze: 3 kV =
Knappenrode–Roßlau: 15 kV 16.7 Hz AC
Maximum incline: 0.7  %
Minimum radius:470
Maximum speed:120
Operating points and lines[1]
Legend
From Wrocław
From Lubań
0.523 Węgliniecformerly Kohlfurt (island station) 189 m
To Czerwona Woda
To Żary
To Görlitz
3.32 Block Hartmannseichen
6.623 Szkleniceformerly Glaserberg
10.60 Block Penzighammer
12.540 Bielawa Dolnaformerly Niederbielau

13.424 Lusatian Neisse (100 m)
Poland
Germany
15.15 Zentendorfuntil 1930
From Przewóz
21.31 Horka freight yard 165 m
Connecting line to Horka Pbf
22.81 Horka(passage to Horka station) 171 m
Berlin Görlitzer Bf–Görlitz
23.1 Weißer Schöps (12 m)
23.7 Neugraben (14 m)
Connecting line from Mückenhain junction
23.745 Särichen junction
27.80 Niesky 171 m
31.79 Block Moholz170 m
33.82 Petershain 160 m
36.86 Mücka 148 m
37.44 Schwarzer Schöps (10 m)
43.3 Block Tauer142 m
45.84 Klitten 131 m
49.10 Uhyst Vorbf 132 m
51.30 Spree (40 m)
From Boxberg
52.02 Uhyst 132 m
52.56 Beginning of the 1962 realignment
59.55 Kleine Spree (16 m)
60.40 Lohsasince 1962 125 m
61.66
60.06
km change +1,600 km
60.13 Lohsauntil 1962 125 m
60.8 Lusatian mining railway
63.13 Weißkollm–Königswartha
From Sornoer Buden junction
From Bautzen
64.5 Lusatian mining railway
66.17 Knappenrodeformerly Werminghoff 123 m
68.75 Block Groß Zeißig120 m
70.15 Hoyerswerda-Neustadt 119 m
70.9 Schwarzwasser (30 m)
71.9 Black Elster (27 m)
From Bautzen
72.76 Hoyerswerda 118 m
To Neupetershain
79.68 Schwarzkollm 118 m
82.56 Lauta (Niederlausitz) 125 m
83.74 Lauta (Niederlausitz) Bbf 126 m
84.47 Block Lauta
SaxonyBrandenburg state border
From Kamenz (Sachs)
87.91
Hosena
(formerly Hohenbocka)

Lübbenau–Kamenz

109 m
To Lübbenau
Schwarzbach (b Ruhland)
From Cottbus
98.32 Ruhland 99 m
To Großenhain Cottb Bf
Black Elster
Lauchhammer Süd
109.0 Lauchhammerformerly Lauchhammer West
117.8 Plessa
Kahla (Oberlausitz)
Berlin–Dresden
124.7 Elsterwerda-Biehla(Keilbahnhof)
Connecting line to Elsterwerda
Haida (Oberlausitz)
130.0 Zeischa
134.6 Bad Liebenwerda
Black Elster
139.3 Wahrenbrück
Ditch
Beiersdorf (b Bad Liebenwerda)
From Cottbus
From Röderau Bogendreieck junction
148.2 Falkenberg (Elster)Halle–Cottbus
To Jüterbog
To Luckau-Uckro
153.7 Beyern
Bundesstraße 87
156.5 Fermerswalde
Brandenburg / Saxony-Anhalt state border
From Prettin
170.1 Annaburg
Black Elster
179.1 Jessen (Elster)
Company siding
189.0 Elster (Elbe)
Company siding
195.1 Mühlangerformerly Prühlitz
199.2 Lutherstadt Wittenberg-Labetzformerly Wendel
From Berlin
201.9 Lutherstadt Wittenberg
To Halle (Saale)
203.7 Lutherstadt Wittenberg Altstadtformerly LW Elbtor
Bundesstraße 2
To Straach
206.1 Lutherstadt Wittenberg Westformerly Klein Wittenberg
From Straach
Company siding
SKW GmbH port siding
Melamine works siding
208.3 Lutherstadt Wittenberg-Piesteritz
SKW northern siding
SKW nitrogen works siding
PCI Augsburg siding
210.3 Apollensdorf
212.1 Griebo
216.7 Coswig (Anh) Hp
Bundesstraße 187a
Former match factory siding
217.6 Coswig (Anh) freight yard
Coswig port siding
Commercial zone siding
Bundesautobahn 9
222.7 Klieken
229.3 Roßlau (Elbe) junction Aw
To Roßlau (Elbe) freight yard
From Wiesenburg
Roßlau Ra
231.2 Meinsdorf
Rossel
From and to Trebnitz (Magdeburg)
Bundesstraße 184
233.7 Roßlau (Elbe)
To Leipzig Hbf

The Węgliniec–Roßlau (Elbe) railway is a mainline railway in Poland and the German states of Saxony, Brandenburg and Saxony-Anhalt, originally built by the Berlin-Anhalt Railway Company and the Upper Lusatian Railway Company as part of the trunk line from Breslau (now Wrocław) to Magdeburg. It runs from Węgliniec (formerly Kohlfurt) via Niesky, Hoyerswerda, Falkenberg (Elster) and Wittenberg to Roßlau (Elbe). The line is sometimes called the Niederschlesische Gütermagistrale (Lower Silesian freight trunk line) because it provides a direct connection from the province of Lower Silesia to Central Germany. The western section of the line is one of the oldest lines in Germany.

History

The Berlin-Anhalt Railway Company (German: Berlin-Anhaltische Eisenbahn-Gesellschaft, BAE) was one of the major railway companies in Germany for more than four decades during the 19th century. Apart from the Anhalt trunk line, during this period it built a network of important railway connections between Berlin and the northern part of the Kingdom of Saxony, the Prussian province of Saxony and the Duchy of Anhalt, which eventually included a length of approximately 430 kilometres.

Planning and construction

The Wittenberg–Dessau section was part of the original route of the Anhalt line. Between Dessau and Coswig (Anhalt), the line was opened on 18 August 1841 and the section between Wittenberg and Coswig (Anhalt) followed on August 28 of the same year. On 10 September 1841, traffic began to run between Berlin and Köthen.

The construction of new routes by the BAE, along with the growth of competing railway networks, forced constant adjustments to rail services to respond to changing demand . After the construction of the direct route from Wittenberg to Bitterfeld, the importance of the Wittenberg–Dessau–Köthen section declined.

The Upper Lusatian Railway Company (Oberlausitzer Eisenbahn-Gesellschaft) opened the line between Kohlfurt and Falkenberg on 1 June 1874. The gap between Falkenberg and Wittenberg was opened by the BAE on 15 October 1875.

The Upper Lusatian Railway Company transferred the management of its section of the route to the BAE in 1878. The line was nationalised on 1 May 1882 and became part of the Prussian state railways.

Second World War

On 20 April 1945, there was an air raid on Piesteritz station, which blew up several wagons and also caused significant damage to a nitrogen plant. The explosion was so powerful that the wheels and axles of a tank wagon were hurled 500 metres to the present federal highway 187.[2]

After the Second World War

After the end of the Second World War, the line was divided by the Oder-Neisse line; the railway node of Kohlfurt became part of Poland and was renamed Węgliniec. The cross-border route has remained of importance for freight, but there was no longer any passenger transport between Horka station and Węgliniec station after 1945. In 1946, the second track on sections of the line were dismantled.[3]

The stations lying in area where the Sorbian language is spoken received additional signs in the Sorbian language. These names were now also listed in the timetable of Deutsche Reichsbahn.

Station names in the Sorbian
language area
German Sorbian
Niesky Niska
Mücka Mikow
Klitten Klětno
Uhyst Delni Wujězd
Lohsa Łaz
Knappenrode Hórnikecy
Hoyerswerda-Neustadt Wojerecy-Nowe město
Hoyerswerda Wojerecy
Schwarzkollm Čorny Chołmc
Clearance work at the accident site on 3 December 1988
Freight train with PKP SU46 near Horka (2004)

In the early 1960s, the line was realigned between Uhyst and Lohsa because of the expansion of the Lohsa open cut mine. The new line was opened on 11 January 1962.

The line between Knappenrode and Falkenberg/Elster was electrified in the 1980s to serve the heavy coal traffic. Electric rail operations began between Hohenbocka and Ruhland and between Knappenrode and Hohenbocka on 19 December 1987 and on 1 April 1988. There was a collision of a Polish freight train and a Deutsche Reichsbahn train on 3 December 1988, close to the state border between the stations of Horka, East Germany, and Bielawa Dolna, Poland. Here, five German and three Polish railway workers were killed and three other railway workers were seriously injured.

Passenger services between Horka and Niesky had always been of minor importance only and the last class 771 railbus ran on 14 December 2002, after a rail replacement bus service had already been operated for a few weeks.

Extensive renovation has been carried out since 2009, including a major renovation of the track and overhead line equipment from the Roßlau/Dessau railway transport hub. As part of this project, the modernisation of the railway stations of Roßlau, Coswig, Wittenberg-Piesteritz and Wittenberg-West is planned during the next few years.

In 2010, a regular service ran again between Horka and Hoyerswerda, hauled by a class 50 steam locomotive.[4]

The Klitten–Hoyerswerda section has been blocked since 12 December 2010, while the Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft (Lusatian and Central German Mining Administration Company, LMBV) re-inforces the eastern embankment of the Silbersee (Silver Lake) in the area around Lohsa station. During the stabilisation work there is an increased risk, so that the line, which runs directly along the eastern shore, cannot currently be used. Freight trains are rerouted via Weißwasser, Knappenrode, Spremberg and Cottbus. In passenger traffic, the Görlitz–Niesky–Hoyerswerda service, which is operated by Ostdeutsche Eisenbahn (ODEG), runs only to Horka; between Horka and Hoyerswerda additional buses run as a rail replacement service. The end of the stabilisation work has been delayed from late 2012 to 2014, after a 200 metre long section of the bank slipped on 8 March 2012 during the remedial work.[3]

Route development between the Polish border and Knappenrode

Because of the ever increasing volumes of freight traffic, the full doubling and electrification of the line was agreed on the section between the Polish border and Knappenrode in December 2001. A project with this objective, along with a planned maximum speed of 120 km/h, was included in the Bundesverkehrswegeplan (Federal Transport Infrastructure Plan) of 2003 and included in the Bedarfsplan Schiene (“rail demand plan”, which was added as an annex to the Federal Railway Infrastructure Expansion Act).

Neiße bridge, looking east; the route in Poland has been already upgraded and electrified (2009)

The planning approval process for the 52 kilometre commenced in 2009. In the spring of 2012, the necessary funding agreement to develop the line was signed between the federal government and Deutsche Bahn. The construction was scheduled to start in early September 2012 with the rebuilding of Knappenrode station and doubling of the line would start at the end 2013 and was planned to be completed by the end of 2016. The total investment would be about €420 million. The stations of Lohsa, Uhyst, Klitten, Mücka and Petershain are to be rebuilt with two platforms and at Niesky station two new platforms and a pedestrian tunnel will also be built. Five electronic interlocking systems are to be built and the route across the border will be equipped with European Train Control System. Noise barriers are to be installed on 16 kilometres of the line.[3]

Work on route development began with the renovation of Knappenrode station in 2012. The new overhead line in the station was energised on 1 October. With the commissioning of a new electronic interlocking system at the station, the renovation is to be completed in the spring of 2014. A synchronous converter has been under construction in Lohsa and a transformer in Ruhland for the traction power supply since the spring of 2013. The Federal Railway Authority gave planning approval for the Horka freight yard–German/Polish border section in August 2013. The construction work on this section will begin in March 2014 and is expected to last two years.[5]

Funding is provided by the Federal Republic of Germany under the Federal Railway Expansion Act (Bundesschienenwegeausbaugesetz) with co-financing by the European Union. On 7 June 2012, a financing agreement was signed between the Free State of Saxony and Deutsche Bahn, using state funds of €1.6 million and in accordance with relevant provisions in the state’s development plan, to increase the line speed on the Horka–Niesky–Knappenrode section to 160 km/h from the current 120 km/h in order to attract patronage for passenger transport services.[6]

At the same time the Neisse bridge will also be rebuilt by the Polish State Railways. Due to the upgrading measures, the line capacity will be increased from 50 to 180 trains (of which 160 are freight trains) per day.

The line upgrade on the Polish section from Węgliniec to the Neisse bridge was completed on 23 March 2006. Both the newly built second track and the electric catenary end on the bridge. The German section of the development work began in December 2012 with the renovation of the superstructure and the conversion of the overhead line by Deutsche Bahn construction on the line between Knappenrode and Spreewitz (the remaining part of the Knappenrode–Sornoer Buden mining railway). From mid-2013, electrically operated trains could run to Spreewitz again. The upgrade will restore four of the seven tracks and two sidings in Knappenrode station.

The completion of the upgrade will be delayed to 2016 due to problems with the embankment of the Silbersee.

Operations

Signal box near Piesteritz

Passengers

Currently, this route is served by DB Regio Regionalbahn trains running between Dessau and Falkenberg. The trains take around 80 minutes to cover the approximately 91 km long line and run hourly. In the peak hour additional services run on the line between Dessau Hbf and Lutherstadt Wittenberg and serve only some of the stations. Since the timetable change in December 2011, some services end in Lutherstadt Wittenberg or Annaburg due to low demand. Services are provided by push-pull trains consisting of Class 143 locomotives and at least two double-deck coaches, including a double-deck driving coach.

Services have been operated since 15 December 2013 between Falkenberg (Elster) and Hoyerswerda on the new S-Bahn line S4 of the Mitteldeutschland S-Bahn with Bombardier Talent 2 railcars at two-hour intervals. In addition, Regionalbahn trains to Cottbus operate between Falkenberg and Ruhland and Regional-Express trains to Dresden operate between Ruhland and Hoyerswerda, which connect with each other in Ruhland and thus provide a nearly hourly service of the section from Falkenberg to Hoyerswerda.

Freight traffic

The line is also important for freight transport. That line carries frequent services to the Piesteritz nitrogen works (Stickstoffwerke Piesteritz) in Wittenberg, using an extensive network of freight rail facilities.

In addition, the line is being developed to play an important role in international freight services to Poland. Once construction work is completed, it is one of the most important corridors for freight between Eastern and Western Europe.[7][8]

In the spring of 2011, the siding the PCI Augsburg company was reactivated with new track and the old track was dismantled. The siding is at the western end of the freight depot of the Stickstoffwerke Piesteritz Piesteritz works.

Stations

Freight train in Niesky station (2013)

References

Wikimedia Commons has media related to Węgliniec–Roßlau railway line.
  1. Eisenbahnatlas Deutschland (German railway atlas) (2009/10 ed.). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  2. "Deutsches Chemie-Museum Merseburg: Wittenberg/Piesteritz" (in German). Retrieved 10 August 2014.
  3. 3.0 3.1 3.2 "Knappenrode–Horka–Grenze zu Polen wird endlich ausgebaut". Signal (in German) (3): 5. 2012.
  4. "Lausitzer Rundschau: Privatlok darf noch mal". Lausitzer Rundschau (in German). 26 May 2010. Retrieved 10 August 2014.
  5. "Grünes Licht für weiteren Bauabschnitt beim Ausbau der Bahnstrecke Knappenrode - Horka" (Press release) (in German). Deutsche Bahn AG. 30 August 2013. Retrieved 10 August 2014.
  6. "Rekordinvestitionen im Freistaat Sachsen: DB investiert rund 12 Millionen Euro in neues IC-Werk in Leipzig und 2,3 Milliarden Euro in sächsisches Schienennetz" (in German). News Tix. 7 June 2012. Retrieved 10 August 2014.
  7. "Deutsche Bahn: Internationaler Güterverkehr wird beschleunigt" (Press release) (in German). 8 July 2014. Retrieved 10 August 2014.
  8. Harry Müller (19 August 2009). "Impulse für die Gütermagistrale Wroclaw-Berlin". Lausitzer Rundschau (in German). Retrieved 10 August 2014.