Varsity Line

Varsity Line

Site of the future Oxford Parkway station
Overview
Type Heavy rail
System National Rail
Status Operational (Bletchley-Bedford)
Being rebuilt (Oxford-Bicester Town)
Rebuild planned (Bicester Town-Bletchley)
Closed Bedford-Sandy-Cambridge
Locale South East England
Termini Oxford
Bedford
Stations 13 open
2 planned
Operation
Opening 1846–1851
Closed 1993 (mothballed Clayton Junction-Bletchley)
Owner Network Rail
Operator(s) Chiltern Railways
London Midland
Rolling stock Class 153 "Sprinter"
Class 165 "Network Turbo"
Technical
No. of tracks 1–2
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

Varsity Line

Legend
GER line to Ipswich
GER line to Mildenhall

West Anglia Main Line
Fen Line

Cambridge
Cambridge
(LNWR) Goods
Cambridge Line
GER line to Huntingdon
Note: Alignment west of
Cambridge is now track of

Mullard Observatory's
moving telescope

Lord's Bridge
Toft and Kingston
Old North Road
Gamlingay
Potton

Great Northern Railway
East Coast Main Line

(LNWR)Sandy
Sandy

Great Northern Railway
East Coast Main Line
Girtford Halt
River Ivel
former navigation

Blunham
Willington
Bedford St Johns
former site

Bedford St Johns
current site
Bedford Midland

Bedford to Hitchin Line
(Midland Railway)

Kempston and Elstow Halt
Midland Main Line
Kempston Hardwick
Wootton Broadmead Halt
Stewartby
Millbrook
Bedford to Bletchley
Lidlington
operates as the
Ridgmont
Marston Vale Line
Husborne Crawley
Aspley Guise
Woburn Sands
Bow Brickhill
Grand Junction Canal
Fenny Stratford

LNWR

West Coast Main Line

Bletchley
Newton Longville landfill
Swanbourne
Winslow
Verney Junction
Metropolitan Railway
to Banbury
Claydon
Winslow Road
Reversing siding of
freight line to Calvert
Granborough Road
Great Central Main Line
Marsh Gibbon
and Poundon
Calvert
Launton
Calvert landfill
Grendon Underwood Jn.
Quainton Road Junction
Great Central Main Line
Quainton Road
open only on Bank Holidays

Metropolitan Railway
to Aylesbury

GWR Bicester Cut-off line
Bicester chord
under construction

Bicester Town
temporarily closed until May 2015

Bicester Military Railway
Wendlebury Halt
GWR
Oxford and
Rugby Railway
Charlton Halt
Oddington Halt
GWR
Oxford, Worcester and
Wolverhampton Railway
Islip
Oxford Parkway
under construction

GWR
former Oxford, Witney
and Fairford Railway
Oxford Road Halt
Yarnton
Oxford Canal

Buckinghamshire
Junction Railway

Wolvercote Junction
Dukes Cut

Wolvercote Tunnel
Wolvercot Platform

Wolvercote Halt
Oxford Canal
Oxford North Junction
Port Meadow Halt
Sheepwash Channel
Rewley Road Swing Bridge
Oxford General
Oxford Rewley Road
Cherwell Valley Line

The Varsity Line (or Oxford to Cambridge Line) is an informal name for the railway route that formerly linked the English university cities of Oxford and Cambridge, operated successively by the London and North Western Railway, the London, Midland and Scottish Railway, and British Railways. It was sometimes called the "Brain Line", a pun on main line.

Services were withdrawn from the OxfordBletchley and BedfordCambridge sections at the end of 1967, even though the line had not been listed for closure as part of the Beeching Axe in 1963. (The Oxford – Bicester section reopened in 1987 until mid 2014, when it was closed again for reconstruction.)

As of October 2014, the only section still in regular passenger use is the Marston Vale Line operation from Bletchley to Bedford. Work is under way to reopen an upgraded Oxford to Bicester Line from Oxford to Bicester Town and open a newly-constructed short section from Bicester Town to the Chiltern Main Line as part of Project Evergreen 3 and from Bicester to Bedford as part of the East West Rail Link. The Bicester – Bletchley section, though extant, is disused. Work has begun to reinstate this section. Network Rail anticipates that the complete Oxford – Bedford route will be ready for use by 2019, although electrification east of Bletchley will have to wait for a later phase. In May 2014, Network Rail announced that the electrified section of the line will be opened to 125 mph (200 km/h) running, the current top speed for InterCity services. It is proposed that CrossCountry services, along with Chiltern Railways and London Midland services, will use the route.[1]

In the absence of a rail service, Stagecoach in Bedford's X5 coach service provides a passenger service by road between Oxford and Cambridge via Bicester, Milton Keynes and Bedford.

History

The line was built in two stages, the first by the Buckinghamshire Railway between Oxford and Bedford in 1845. and the second by the Bedford and Cambridge Railway which opened on 7th July 1862.

Bedford and Cambridge Railway

Proposed from 1844, the supporting and surveying engineers were George and Robert Stephenson. The engineers' proposal to junction with the London and Birmingham Railway at Bletchley was eventually accepted by the shareholders, with construction starting in December 1845 and completed by September 1846. All operations were subcontracted to the LNWR.

Buckinghamshire Railway

The Bletchley and Bedford section was opened by the Buckinghamshire Railway in 1846. It then opened the section between Bletchley and Verney Junction on 30 March 1850 as part of its line to Banbury,[2] and the section between Verney Junction and Oxford on 20 May 1851.[2]

L&NWR/LMS

By the time that the B&CR had been built, the London and Birmingham Railway amalgamated with the Grand Junction Railway to form the London & North Western Railway (LNWR), who immediately took over the running rights to the line. The LNWR bought-out the B&CR in 1865. From 1 July 1851, the LNWR operated the Buckinghamshire Railway on a 999-year lease, then absorbing the company on 21 July 1879.[2]

However, although it now owned and operated the complete line, the LNWR chose to operate it as two separate timetables, using Bletchley as originally planned as an intermediate station, with separate trains running in two directions: east to Cambridge; and west to Oxford. It was not until it was amalgamated in 1922 that the London Midland and Scottish Railway started running complete services from Oxford to Cambridge.

During World War 2, the line carried many trains to and from the Bicester Military Railway. A junction between the line and the Great Central Main Line was built between Calvert and Claydon to improve connection.

British Railways

After nationalisation in 1947 into British Railways, an early attempt to close the line in 1959 failed owing to local opposition. The line was not listed for closure in the 1963 The Reshaping of British Railways report, but came under pressure from the road lobby and Minister of Transport Ernest Marples, who had appointed Dr Beeching. Patronage of the line fell when the introduction of fast trains from London to Oxford and Cambridge made it quicker for passengers to go via London. At the end of 1967 BR withdrew passenger services from the OxfordBletchley section and all trains from the BedfordCambridge section, a year after it had withdrawn passenger services north of Aylesbury on the Great Central Main Line.

In the 1980s the line between Aylesbury and Bletchley via Calvert was used for transfers of empty passenger rolling stock due to the closure of the London Marylebone depot, thus transferring the maintenance of the Chiltern Lines' Class 115s to Bletchley. This ceased with the opening of a new depot in Aylesbury and the introduction of the Class 165. During 1982 the entire length of the Bletchley-Oxford section, which was still double-tracked throughout, was used for diversionary passenger services while a bridge at Hill Wooton, between Coventry and Leamington Spa was replaced; all Birmingham-London Paddington services scheduled to stop at Coventry being diverted via this route for three days. Also in the 1980s, there were passenger specials to Milton Keynes from Marylebone via Aylesbury and High Wycombe, which picked up passengers at disused Winslow.[3] The last passenger train to operate on this section of the line was the Mothball Tour in 1993, just before the line was taken out of use.

Network SouthEast, supported by Oxfordshire County Council, reopened the Oxford – Bicester Town section to passenger traffic in 1987, and reopened Islip railway station in 1989.[4] From 15 February 2014, this link closed again for a major upgrade as described below.

Present status of route

Swanbourne, showing the dilapidated condition of the track there (February 2006)

The Oxford to Bicester Line closed in 2014 for major upgrades, set to re-open as mostly 100 mph (160 km/h) double track from 2015 (see Chiltern Railways#Evergreen 3). Between Bicester Town and Newton Longville the route is in place but derelict. Within this stretch (starting 1 February 2014), Network Rail began clearing vegetation that had grown over the abandoned track.[5] The stretch between Newton Longville and Bletchley was re-laid in spring 2006 and opened on 27 March 2006 for freight traffic, carrying refuse to the Newton Longville landfill site. Between Bletchley and Bedford the track is open and in daily passenger use as the Marston Vale Line.

Between Bedford and Cambridge all of the track has been removed and some sections of the trackbed have been lost. At Sandy and Potton new housing occupies the former route. Between Lord's Bridge and Cambridge, the Ryle Telescope of Mullard Radio Astronomy Observatory now occupies a 3-mile (4.8 km) length of the former route. Between Trumpington Park and Ride and Cambridge Station the entire route has been converted to be part of the Cambridgeshire Guided Busway.

A further problem is the lack of through platforms at Bletchley and Bedford. The current track layout at Bletchley means that, until any eventual new high-level station is in place, through trains would have to go around the station without stopping or operate via Milton Keynes. Similarly, Bedford St Johns station was rebuilt on a different site, and neither it nor Bedford ('Midland Road') are now on the direct alignment towards Sandy.

Revival plans

Main article: East West Rail Link

Confirmed plans

In May 2006 the Department of Transport announced[6] specific plans for Bletchley station. The document states that "it is likely" that Bletchley area renewals and network simplification will take place by 2010, "to include a high-level platform" for Bedford trains. The network will be suitable for the later addition of any 'East-West' link to and from Oxford and for the operation of through links from either Oxford or Bedford to and from Milton Keynes.

In the expansion plans for Milton Keynes, the area around Newton Longville is to be extensively developed. A new passenger station for Newton Longville is included[7] in the "MK2031" strategic plan, with a spur to a new platform at Milton Keynes Central. An upgraded line is already in place (see above) and a simple halt would not be expensive.

On 4 December 2006, work began at Milton Keynes Central to prepare for a service connection from the Marston Vale Line, with completion scheduled for December 2008.[8][9]

Chiltern Railways has opened a new station, known as Aylesbury Vale Parkway, 3 miles (4.8 km) north-west of Aylesbury town station, adjacent to the A41 and the major development at Berryfields. The station opened on 14 December 2008, and the station building on 1 June 2009. Existing track, previously used only by freight trains, has been upgraded and new signalling equipment installed. This line could be extended further north to reach a rebuilt Oxford-Bletchley line at Verney Junction and Chiltern Railways has long-term aspirations to reach Milton Keynes.[10]

It has also been announced that the line between Oxford and Bicester Town railway station will be upgraded with funding from property developers as a condition of enlarging Bicester Village Shopping Centre.

In March 2008, a £2 million engineering survey into the state of the existing and removed track was launched.[11]

In his autumn 2011 budget statement of November 2011, the Chancellor of the Exchequer George Osborne announced that the government would fund the re-opening of the rail link from Oxford via Milton Keynes as far as Bedford.[12]

In July 2012 the government announced that the line between Oxford and Bletchley would be reopened within an overall investment programme for trains between 2014 and 2019.[13]

Prognosis for Eastern section

The Varsity Line and the lines it meets. Disused or freight-only sections are in blue.

With the section from Oxford to Bedford funded and scheduled, hopes for a revival of the complete Varsity Line rest on the proposed East West Rail Link. This scheme aims to construct a new 9-mile (14 km) trackbed between Bedford and Sandy on roughly the same alignment as the original. At Sandy, trains would then have joined the East Coast Main Line to BiggleswadeArleseyHitchin and then switched north-east to LetchworthBaldock – Ashwell and Morden – RoystonMeldrethSheprethFoxton – Cambridge. However, a chord would have to be built to enable southbound trains from Sandy to reach the Cambridge Line, as the existing junction serves only northbound trains from London on to this branch. This would mean that trains would not actually stop at Hitchin and a new station might have to be built there unless another solution could be found.

An alternative alignment for the line eastwards from Sandy has been proposed in order that East Coast Main Line line capacity is not affected by the new line. This would continue from Sandy to the east along the original line, skirting Sandy Warren, before heading directly east across relatively flat and open country, with possible stations at Wrestlingworth and Bassingbourn, before joining the existing railway network again between Royston and Meldreth.

In March 2007, a study (funded by the councils and other interested parties along the route) declared at p. 38, 5.1 A very good operating and business case exists for [a "base case" for a] two-trains-per-hour passenger service between Oxford and Milton Keynes, and an operating case also exists for the Aylesbury spur which would bring further economic and strategic advantages to the subregion. Capital cost for the base case is between £100m – £135m. The base case and the Aylesbury options should be further considered in the next phase of work.[14] As of October 2014, a similar business case for extension to Cambridge and beyond remains to be made.

Future stations

See also

Wikimedia Commons has media related to Varsity Line.

References

  1. Hellier, Alex (14–27 May 2014). East West Rail develops into 125mph inter-regional route. Peterborough: RAIL. p. 13.
  2. 2.0 2.1 2.2 Awdry (1990) p. 63
  3. http://www.railcar.co.uk/features/quaintonian.htm
  4. Bevan, Alan (Ed). A-Z of Rail Reopenings. Warwick: Railway Development Society. ISBN 0-901283-13-4.
  5. Work starts on clearing line for East West Rail Buckingham Today, 1 February 2014
  6. West Coast Main Line: Progress Report May 2006 (3MB PDF file)
  7. MK2031 summary but see also MK2031 3.42 to 3.50
  8. Transport Briefing — UK transport news, data and jobs
  9. "New rail platform on time for 2008". MK News (Milton Keynes). 13 December 2006. Retrieved 27 April 2008.
  10. Network Rail 2006 Business Plan.
  11. Little, Reg (7 March 2008). "MK Rail Link Plan on Track". The Oxford Times. Retrieved 27 April 2008.
  12. "Autumn Statement: 35 road and rail schemes get go-ahead". BBC News. 29 November 2011. Retrieved 29 November 2011.
  13. "Rail network to see 'biggest investment' since the Victorians". Guardian Newspaper. 14 July 2012. Retrieved 15 July 2012.
  14. "Guide to Railway Investment Projects (GRIP) Stage 2 Report Final Report" (PDF) (Press release). East West Rail. 1 February 2007. Retrieved 27 April 2008.

Coordinates: 51°58′05″N 0°49′05″W / 51.968°N 0.818°W