Uttoxeter Canal
Uttoxeter Canal | |
---|---|
The basin below lock 1, restored in 2005. | |
Specifications | |
Locks | 19 |
Status | Possible restoration |
History | |
Original owner | Trent and Mersey Canal Company |
Principal engineer | John Rennie |
Date of act | 1797 |
Date completed | 1811 |
Date closed | 1849 (replaced by railway) |
Date restored | 2005 (1 lock and basin) |
Geography | |
Start point | Froghall |
End point | Uttoxeter |
Branch of | Caldon Canal |
Uttoxeter Canal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend
|
The Uttoxeter Canal pronounced (listen) was a thirteen-mile extension of the Caldon Canal running from Froghall as far as Uttoxeter in Staffordshire, England. It was authorised in 1797, but did not open until 1811. With the exception of the first lock and basin at Froghall, it closed in 1849, in order that the Churnet Valley Railway could be constructed along its length. The railway has since been dismantled and there are plans to reinstate the canal.
History
The Uttoxeter Canal was promoted by the Trent and Mersey Canal Company and authorised by an Act of Parliament in 1797.[1] This was a political move, designed to prevent a rival scheme for a canal to Uttoxeter. The planned Commercial Canal was intended to link the Chester Canal at Nantwich to the Ashby Canal at Moira, passing through Stoke on Trent and Uttoxeter, and would have had a serious impact on the profitability of the Trent and Mersey Company if it had been built.[2]
Powers to alter the proposed route at Alton were included in an act of Parliament obtained in 1802,[2] but because the new canal was not expected to be profitable, construction was delayed. Ten years after the Act was passed, work began under the direction of the canal engineer John Rennie, with the 13-mile (21 km) canal opening on 3 September 1811.[3] It is sometimes referred to as a branch of the Caldon Canal. 19 locks were required to drop the level of the canal as it passed down the valley of the River Churnet.[2]
There was a proposal to construct a branch to Ashbourne, and another in 1839 to extend the canal along the Dove Valley to link up with the Trent and Mersey Canal, but no details of the precise routes have survived.[2] The canal was not a financial success, and the Trent and Mersey Company made plans to close it. However, the Company was taken over by the North Staffordshire Railway, and with the exception of the first lock and the basin at Froghall, which remained in use until about 1930, the canal was closed by the railway company on 15 January 1849.[3] A large part of it was subsequently filled in, and used for the route of the Churnet Valley Railway (which incidentally, although it is now dismantled, had the first automatic, train-operated level-crossing in the UK, at Spath, just outside Uttoxeter.[4])
A few bridges from the Uttoxeter Canal still exist, with the occasional milepost visible, including two which have been relocated to the bowling green in Denstone village. Very little can be seen of the canal in Uttoxeter, but there is still evidence it existed, as there is an area called "The Wharf".
Restoration
The Caldon and Uttoxeter Canals Trust are looking at the feasibility of restoring the canal from Froghall to Uttoxeter.[3] The situation is complicated by the fact that the revived Churnet Valley Railway terminates at Froghall, and they were originally going to reopen the railway to Oakamoor, but they are currently engaged in extending their line at the opposite end towards Leek.[5]
If the canal is reopened, the original route is now occupied by a JCB factory at Rocester, and so there is a proposal to construct a new route from Denstone which would follow the River Churnet more closely to a new terminus near the Uttoxeter gravel pits, which are nearly worked out.[6][7] The first lock and Froghall basin have been restored and were opened in July 2005.[3]
See also
- Canals of Great Britain
- History of the British canal system
References
- ↑ Canal to Nowhere, Jim Shead, Waterways World March 2006
- ↑ 2.0 2.1 2.2 2.3 Richard Dean, (1997), Canals of North Staffordshire, (Historical map), M & M Baldwin, ISBN 0-947712-32-1
- ↑ 3.0 3.1 3.2 3.3 Caldon and Uttoxeter Canals Trust: History
- ↑ First BR Automatic Level Crossing Barriers
- ↑ Churnet Valley Railway: Introduction
- ↑ Caldon and Uttoxeter Canals Trust: Guide
- ↑ Caldon and Uttoxeter Canals Trust: Index
External links
- See the Caldon & Uttoxeter Canals Trust's restoration progress of the Uttoxeter Canal at Caldon & Uttoxeter Canals Trust