Urban rail transit in China
Urban rail transit in the People's Republic of China encompasses a broad range of urban and suburban electric passenger rail mass transit systems including subway, light rail, tram and even maglev.[1] Some classifications also include non-rail bus rapid transport. Several Chinese cities had urban electric tramways in the early 20th century, which were dismantled in the 1950s-1970s. Nanjing had an urban railway from 1907 to 1958. Today China boasts both the world's longest and second longest metro systems.[2][3][4] Out of the top 10 busiest metro systems in the world 4 of them are in China. The first subway in China was built in Beijing in 1969. The Tianjin Metro followed in 1984. Since 2000, the growth of rapid transit systems in Chinese cities has accelerated.[3] The Shanghai Metro despite being the world's longest only started operating in 1993.[3][4][5] From 2009 to 2015, China plans to build 87 mass transit rail lines, totaling 2,495 km, in 25 cities at the cost of ¥988.6 billion.[6] Of the new metro systems to be built between now and 2015, 16% will be in the Pearl River Delta, 25% in the Yangtze River Delta and 24% in the Jingjinji region.[7] As of 2012, China averages 270 km of new rapid transit mileage per year.[8] Hong Kong’s MTR is the combination of the former KCRC and the MTR corporation. The MTR now has investment and management stakes in the rapid transit systems of several mainland Chinese cities.
Urban rapid transit systems
Currently operational
Beijing
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Beijing Subway (BGD) 北京地铁 |
Locale | Beijing |
1 2 4 5
6 7 8 9 10
13 14 15 |
8 Phase II North Section II and South Section I |
[Note 1] [9] [10] [11] | |
Began operation | 1 October 1969 | |||||
Lines in operation | 18 | |||||
№ of stations | 269 (List) | |||||
Network length | 527 km (327 mi) | |||||
Ridership | 10.276 million (Daily Record) 3.209 billion (2013 annual) | |||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Beijing Subway |
Line 1, Beijing Subway | 23 | 30.4 | 6-car B-type | 15 January 1971 | |
Line 2, Beijing Subway | 18 | 23.1 | 6-car B-type | 28 December 1987 | ||
Line 5, Beijing Subway | 23 | 27.6 | 6-car B-type | 7 October 2007 | ||
Line 6, Beijing Subway | 27 | 42.8 | 8-car B-type | 30 December 2012 | ||
Line 7, Beijing Subway | 19 | 23.7 | 8-car B-type | 28 December 2014 | ||
Line 8, Beijing Subway | 18 | 31.6 | 6-car B-type | 19 July 2008 | ||
Line 9, Beijing Subway | 12 | 16.5 | 6-car B-type | 31 December 2011 | ||
Line 10, Beijing Subway | 45 | 57.1 | 6-car B-type | 19 July 2008 | ||
Line 13, Beijing Subway | 16 | 40.9 | 6-car B-type | 22 September 2002 | ||
Line 15, Beijing Subway | 18 | 41.4 | 6-car B-type | 30 December 2010 | ||
Airport Express | 4 | 28.1 | 4-car L-type | 19 July 2008 | ||
Batong Line | 13 | 18.9 | 6-car B-type | 27 December 2003 | ||
Changping Line | 7 | 21.24 | 6-car B-type | 30 December 2010 | ||
Fangshan Line | 11 | 24.79 | 6-car B-type | 30 December 2010 | ||
Yizhuang Line | 13 | 23.3 | 6-car B-type | 28 December 2010 | ||
Total | 267 | 451.4 | ||||
Beijing MTR |
Line 4, Beijing Subway | 24 | 28.2 | 6-car B-type | 28 September 2009 | |
Line 14, Beijing Subway | 17 | 27.2 | 6-car A-type | 5 May 2013 | ||
Daxing Line | 12 | 21.7 | 6-car B-type | 30 December 2010 | ||
Total | 53 | 77.1 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 14, Beijing Subway Phase II Central Section | 14 | 16.3 | 2015 |
Changping Line Phase II | 4 | 9.5 | 2015 |
Fangshan Line Western Section | 1 | 2.2 | 2015 |
Yanfang Line | 8 | 14.4 | 2015 |
Western Suburban Line | 7 | 9.1 | 2015 |
Changsha
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Changsha Metro 长沙地铁 |
Locale | Changsha |
1 |
|||
Began operation | 29 April 2014 | |||||
Lines in operation | 1 | |||||
№ of stations | 19 | |||||
Network length | 22.3 km (14 mi) | |||||
Ridership | ||||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Changsha Metro |
Line 2, Changsha Metro[12] | 19 | 22.3 | 29 April 2014 | ||
Total | 19 | 22.3 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 2 | Wangchengpo | Guangda | 29 April 2014 |
Chongqing
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Chongqing Rail Transit (CRT) 重庆轨道交通 |
Locale | Chongqing |
O |
[14] [15] [16] | ||
Began operation | 6 November 2004 | |||||
Lines in operation | 4 | |||||
№ of stations | 117 | |||||
Network length | 202.2 km (126 mi) | |||||
Ridership | 1,310,000 (peak day) 1,100,000 (daily avg.) 244 million (2012) | |||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Chongqing Rail Transit |
Line 1, Chongqing Rail Transit | 23 | 36.6 | 6-car B-type | 28 July 2011 | |
Line 2, Chongqing Rail Transit | 18 | 19.15 | 4-car/6-car (Hitachi Large) | 18 June 2005 | ||
Line 3, Chongqing Rail Transit | 39 | 55.5 | 6-car (Hitachi Large) | 29 September 2011 | ||
Line 6, Chongqing Rail Transit | 18 | 56.7 | 6-car B-type | 28 September 2012 | ||
Total | 121 | 202 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Chongqing Rail Transit Extension | 1 | 1.9 | 2014 |
Line 2, Chongqing Rail Transit Extension | 7 | 12.1 | 2014 |
Line 6, Chongqing Rail Transit Phase I Extension | 4 | 4.7 | 2014 |
Line 6, Chongqing Rail Transit Phase II Southern Section | 4 | 11.4 | 2014 |
Line 3, Chongqing Rail Transit Southern Extension | 7 | 9.9 | 2015 |
Circle Line, Chongqing Rail Transit | 33 | 50.9 | 2017~2018 |
Line 4, Chongqing Rail Transit Phase I | 9 | 17.6 | 2017 |
Line 5, Chongqing Rail Transit Phase I | 25 | 39.7 | 2017 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Jiaochangkou | Shapingba | 28 July 2011 | |
Xiaoshizi | Jiaochangkou | 27 September 2011 | ||
Shapingba | Daxuecheng | 21 December 2012 | ||
Line 2 | Jiaochangkou | Chongqing Zoo | 18 June 2005 | |
Chongqing Zoo | Xinshancun | 1 July 2006 | ||
Line 3 | Lianglukou | Yuanyang | 29 September 2011 | |
Yuanyang | Changfulu | 8 October 2011 | ||
Ertang | Lianglukou | 30 December 2011 | ||
Changfulu | Jiangbei Airport | 30 December 2011 | ||
Yudong | Ertang | 28 December 2012 | ||
Line 6 | Wulidian | Kangzhuang | 28 September 2012 | |
Kangzhuang | Lijia | 26 December 2012 | ||
Lijia | Yuelai | 15 May 2013 | ||
Lijia | Beibei | 31 December 2013 |
Chengdu
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Chengdu Metro 成都地铁 |
Locale | Chengdu |
1 Phase II |
|||
Began operation | 27 September 2010 | |||||
Lines in operation | 2 | |||||
№ of stations | 42 | |||||
Network length | 49 km (30 mi) | |||||
Ridership | ||||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Chengdu Metro |
Line 1, Chengdu Metro | 17 | 18.50 | 6-car B-type | 27 September 2010 | |
Line 2, Chengdu Metro | 26 | 31.20 | 6-car B-type | 16 September 2012 | ||
Total | 43 | 49.74 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 2, Chengdu Metro Phase II Eastern section | 6 | 10.5 | December 2014 |
Line 4, Chengdu Metro Phase I | 16 | 22.4 | June 2015 |
Line 1, Chengdu Metro Phase II Southern section | 5 | 5.4 | 2015 |
Line 3, Chengdu Metro Phase I | 17 | 20.0 | 2015 |
Line 7, Chengdu Metro Phase I | 31 | 38.61 | 2017 |
Chengdu–Dujiangyan Line Pengzhou Branch | 3 | 6 |
Dalian
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Dalian Metro Dalian Rapid Transit / DRT 大连地铁(大连轨道交通) 大连快轨 |
Locale | Dalian |
1 |
[17] | ||
Began operation | 8 November 2002 | |||||
Lines in operation | 3 | |||||
№ of stations | 26 (List) | |||||
Network length | 106 km (66 mi) | |||||
Ridership | 120,000 (Avg. Daily) 200,000 (Peak Record) | |||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Dalian Public Transportation Group |
Line 3, Dalian Metro | 12 | 49.15 | 6-car B-type | 8 November 2002 | |
Line 7, Dalian Metro | 7 | 14.30 | 6-car B-type | 28 December 2008 | ||
Line 8, Dalian Metro | 8 | 40.38 | 6-car B-type | 30 December 2013 | ||
Total | 26 | 103.83 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Dalian Metro Phase I | 20 | 17.7 | 2014 |
Line 2, Dalian Metro Phase I | 29 | 20.7 | 2014 |
Jinzhou–Pulandian Line | 11 | 42.70 | 2015 |
Guangzhou and Foshan
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Guangzhou Metro 广州地铁 |
Locale | Guangzhou |
4 Southern Section |
[Note 2] [18] [19] [20] | ||
Began operation | 28 June 1997 | |||||
Lines in operation | 8 | |||||
№ of stations | 147 (List) | |||||
Network length | 240.6 km (150 mi) | |||||
Ridership | 7.844 million (5 Nov 2010 record) 1.990 billion (2013 annual) | |||||
Guangfo Metro FMetro 佛山地铁 (广佛地铁) |
Locale | Foshan (Guangzhou) |
Guangfo Phase I Section II
|
[Note 2] [Note 3] | ||
Began operation | 3 November 2010 | |||||
Lines in operation | 1 | |||||
№ of stations | 14 (List) | |||||
Network length | 20 km (12 mi) | |||||
Ridership | see ref. | |||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Guangzhou Metro |
Line 1, Guangzhou Metro | 16 | 18.5 | 6-car A-type | 28 June 1997 | |
Line 2, Guangzhou Metro | 24 | 31.4 | 6-car A-type | 29 December 2002 | ||
Line 3, Guangzhou Metro | 28 | 67.3 | 6-car B-type | 26 December 2005 | ||
Line 4, Guangzhou Metro | 16 | 43.7 | 4-car L-type | 26 December 2005 | ||
Line 5, Guangzhou Metro | 24 | 31.9 | 6-car L-type | 28 December 2009 | ||
Line 6, Guangzhou Metro | 20 | 24.3 | 4-car L-type | 28 December 2013 | ||
Line 8, Guangzhou Metro | 13 | 14.8 | 6-car A-type | 25 September 2010 | ||
Zhujiang New Town APM Line | 9 | 3.9 | 2-car (APM 100) | 8 November 2010 | ||
Total | 150 | 245.8 | ||||
Guangfo Metro |
Guangfo Line | 14 | 20.4 | 4-car B-type | 25 September 2010 | |
Total | 14 | 20.4 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 6, Guangzhou Metro Yide Lu Station | 1 | 0 | 2014 |
Line 6, Guangzhou Metro Phase II | 10 | 17.4 | 2015 |
Line 7, Guangzhou Metro Phase I | 9 | 18.6 | 2015 |
Line 9, Guangzhou Metro Phase I | 10 | 20.1 | 2015 |
Guangfo Line Eastern Section | 7 | 11.4 | 2015 |
Line 1, FMetro Southern Section | 4 | 6.67 | 2015 |
Line 4, Guangzhou Metro Southern Section | 5 | 11.7 | 2016 |
Line 8, Guangzhou Metro Northern Section I | 2 | 1.8 | 2016 |
Line 13, Guangzhou Metro Phase I | 11 | 28.3 | 2016 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Huangsha | Xilang | 28 June 1997 | |
Guangzhou East Railway Station | Huangsha | 28 June 1999 | ||
Line 2 | Sanyuanli | Jiangnanxi | 29 December 2002 | |
Jiahewanggang | Sanyuanli | 25 September 2010 | ||
Jiangnanxi | Guangzhou South Railway Station | 25 September 2010 | ||
Line 3 | Guangzhou East Railway Station | Kecun | 26 December 2005 | |
Kecun | Panyu Square | 30 December 2006 | ||
Tianhe Coach Terminal | Tiyu Xilu | 30 December 2006 | ||
Airport South | Guangzhou East Railway Station | 30 October 2010 | ||
Line 4 | Wanshengwei | Xinzao | 26 December 2005 | |
Xinzao | Huangge | 30 December 2006 | ||
Huangge | Jinzhou | 28 June 2007 | ||
Chebeinan | Wanshengwei | 28 December 2009 | ||
Huangcun | Chebeinan | 25 September 2010 | ||
Line 5 | Jiaokou | Wenchong | 28 December 2009 | |
Line 6 | Xunfenggang | Changban | 28 December 2013 | |
Line 8 | Xiaogang | Pazhou | 28 June 2003 | |
Pazhou | Wanshengwei | 26 December 2005 | ||
Changgang | Xiaogang | 25 September 2010 | ||
Fenghuang Xincun | Changgang | 3 November 2010 | ||
APM Line | Linhexi | Chigang Pagoda | 8 November 2010 | |
Guangfo Line | Kuiqi Lu | Xilang | 25 September 2010 |
Hangzhou
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Hangzhou Metro 杭州地铁 |
Locale | Hangzhou |
1 Phase II |
|||
Began operation | 24 November 2012 | |||||
Lines in operation | 3 | |||||
№ of stations | 50 (list) | |||||
Network length | 76 km (47 mi) | |||||
Ridership | ||||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Hangzhou MTR |
Line 1, Hangzhou Metro | 31 | 47.97 | 6-car B-type | 24 November 2012 | |
Total | 31 | 47.97 | ||||
Hangzhou Metro |
Line 2, Hangzhou Metro | 13 | 18.3 | 6-car B-type | 24 November 2014 | |
Line 4, Hangzhou Metro | 10 | 9.6 | 6-car B-type | 2 February 2015 | ||
Total | 23 | 27.9 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 2, Hangzhou Metro Phase I Eastern Section | 13 | 18 | 2014 |
Line 4, Hangzhou Metro | 10 | 2020 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Xianghu | Wenze Road | 24 November 2012 | |
Coach Center | Linping | 24 November 2012 |
Harbin
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Harbin Metro 哈尔滨地铁 |
Locale | Harbin | ||||
Began operation | 26 September 2013 | |||||
Lines in operation | 1 | |||||
№ of stations | 18 | |||||
Network length | 17 km (11 mi) | |||||
Ridership | ||||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Harbin Metro |
Line 1, Harbin Metro | 18 | 17.47 | 6-car B-type | 26 September 2013 | |
Total | 18 | 17.47 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Harbin Metro Phase II | 2 | 3.15 | |
Line 1, Harbin Metro Phase III | 6 | 8.12 | 2016 |
Line 3, Harbin Metro | 32 | 37.6 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Hadongzhan | Hananzhan | 26 September 2013 |
Hong Kong
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Hong Kong Mass Transit Railway (MTR) 港鐵 / 港铁 including Kowloon–Canton Railway |
Locale | Hong Kong |
Kwun Tong Tsuen Wan Island |
|
[Note 4] | |
Began operation | 2 December 2007 (1 October 1979 old MTR) (1 October 1910 KCR) | |||||
Lines in operation | 10 | |||||
№ of stations | 86 (List) | |||||
Network length | 175 km (109 mi) | |||||
Ridership | 4.064 million (daily record) 1.482 billion (2011 annual) | |||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
MTR (Shenzhen) |
Line 4 (Longhua Line) | 15 | 19.96 | 6-car A-type | 28 December 2004 | |
Total | 15 | 19.96 | ||||
MTR (Hong Kong) |
East Rail Line | 14 | 41.1 | 12-car (MLR/SP1900) | 1 October 1910 | |
Kwun Tong Line | 15 | 11.2 | 8-car (M Stock/C Stock) | 1 October 1979 | ||
Tsuen Wan Line | 16 | 16 | 8-car (M Stock) | 31 December 1979 | ||
Island Line | 16 | 16.3 | 8-car (M Stock) | 31 May 1985 | ||
Tung Chung Line | 8 | 31.1 | 8-car (CAF Trains/K Stock) | 21 June 1998 | ||
Airport Express | 5 | 35.2 | 8-car (CAF Trains) | 6 July 1998 | ||
Tseung Kwan O Line | 8 | 11.9 | 8-car (M Stock/K Stock) | 4 August 2002 | ||
West Rail Line | 12 | 35.4 | 9-car (SP1900) | 20 December 2003 | ||
Ma On Shan Line | 9 | 11.4 | 4-car (SP1900) | 21 December 2004 | ||
Disneyland Resort Line | 2 | 3.3 | 4-car (M Stock) | 1 August 2005 | ||
Total | 123 | 210.2 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
West Island Line | 4 | 3 | 2014 |
Kwun Tong Line Extension | 2 | 2015 | |
South Island Line Eastern section | 5 | 2015 |
Kunming
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Kunming Rail Transit (KRT) 昆明轨道交通 |
Locale | Kunming |
1 Phase III |
|||
Began operation | 28 June 2012 | |||||
Lines in operation | 3 | |||||
№ of stations | 33 | |||||
Network length | 58.5 km (36 mi) | |||||
Ridership | ||||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Kunming Rail Transit |
Line 1, Kunming Rail Transit | 18 | 29.0 | 6-car B-type | 20 May 2013 | |
Line 2, Kunming Rail Transit | 13 | 11.4 | 6-car B-type | 30 April 2014 | ||
Line 6, Kunming Rail Transit | 2 | 18.1 | 6-car B-type | 28 June 2012 | ||
Total | 14 | 40.2 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Kunming Rail Transit Phase III | 4 | 12.4 | |
Line 2, Kunming Rail Transit Phase II | 8 | 11.4 | |
Line 3, Kunming Rail Transit | 17 | 19.16 |
Nanjing
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Nanjing Metro 南京地铁 |
Locale | Nanjing | [Note 5][21] [22] [23][24] | |||
Began operation | 3 September 2005 | |||||
Lines in operation | 6 | |||||
№ of stations | 121 | |||||
Network length | 225 km (140 mi) | |||||
Ridership | 503 million (2014 annual) | |||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Nanjing Metro |
1 | Line 1, Nanjing Metro | 27 | 38.9 | 6-car A-type | 3 September 2005 |
2 | Line 2, Nanjing Metro | 26 | 38.0 | 6-car A-type | 28 May 2010 | |
3 | Line 3, Nanjing Metro | 29 | 44.9 | 6-car A-type | 1 April 2015 | |
10 | Line 10, Nanjing Metro | 14 | 21.6 | 6-car A-type | 1 July 2014 | |
S1 | Nanjing–Gaochun Line (S1) | 8 | 35.8 | 6-car B-type | 1 July 2014 | |
S8 | Nanjing–Tianchang Line (S8) | 17 | 45.2 | 4-car B-type | 1 August 2014 | |
Total | 121 | 225 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 4, Nanjing Metro | 18 | 33.75 | 2016 |
Nanjing–Gaochun Line (S1) Phase II | 6 | 52.4 | 2016 |
Nanjing–He County Line (S3) | 18 | 36.26 | 2017 |
Nanjing–Lishui Line (S7) | 7 | 30.8 | 2017 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Maigaoqiao | Andemen | 3 September 2005 | |
Andemen | China Pharmaceutical University | 28 May 2010 | ||
Line 2 | Youfangqiao | Jingtianlu | 28 May 2010 | |
Line 10 | Andemen | Olympic Stadium | 3 September 2005 | |
Olympic Stadium | Yushanlu | 1 July 2014 | ||
Nanjing–Gaochun Line (S1) | Nanjing South Railway Station | Lukou International Airport | 1 July 2014 | |
Nanjing–Tianchang Line (S8) | Taishanxincun | Jinniuhu | 1 August 2014 | |
Line 3 | Linchang | Mozhoudonglu | 1 April 2015 |
Ningbo
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Ningbo Rail Transit 宁波轨道交通 |
Locale | Ningbo | ||||
Began operation | 30 May 2014 | |||||
Lines in operation | 1 | |||||
№ of stations | 20 | |||||
Network length | 20 km (12 mi) | |||||
Ridership | ||||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Ningbo Rail Transit |
Line 1, Ningbo Rail Transit | 20 | 20.9 | 6-car B-type | 30 May 2014 | |
Total | 20 | 20.9 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Ningbo Rail Transit Phase II | 22 | 28.4 | 2015 |
Line 2, Ningbo Rail Transit Phase I | 9 | 25.4 | 2015 |
Line 3, Ningbo Rail Transit Phase I | 15 | 16.8 | 2019 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Gaoqiao West | Donghuan South Road | 30 May 2014 |
Shanghai
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Shanghai Metro 上海地铁(上海轨道交通) |
Locale | Shanghai (and Kunshan) |
5 South Extension |
[25] [Note 6] [26] [27] [28] | ||
Began operation | 28 May 1993 | |||||
Lines in operation | 14 | |||||
№ of stations | 330 (List) | |||||
Network length | 538 km (334.3 mi) | |||||
Ridership | 8.486 million (Daily Record) 2.500 billion (2013 annual) | |||||
Shanghai Maglev Train SMT / Shanghai Transrapid 上海磁浮示范运营线 |
Locale | Shanghai |
|
|||
Began operation | 31 December 2002 | |||||
Lines in operation | 1 | |||||
№ of stations | 2 | |||||
Network length | 30.5 km (19 mi) | |||||
Ridership | ||||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Shanghai No.1 Metro |
Line 1, Shanghai Metro | 28 | 36.4 | 8-car A-type | 28 May 1993 | |
Line 5, Shanghai Metro | 11 | 17.2 | 4-car C-type | 25 November 2003 | ||
Line 9, Shanghai Metro | 26 | 52.1 | 6-car A-type | 29 December 2007 | ||
Line 10, Shanghai Metro | 31 | 35.4 | 6-car A-type | 10 April 2010 | ||
Total | 96 | 141.1 | ||||
Shanghai No.2 Metro |
Line 2, Shanghai Metro | 30 | 63.8 | 8-car/4-car A-type | 11 June 2000 | |
Line 11, Shanghai Metro | 34 | 72 | 6-car A-type | 31 December 2009 | ||
Line 13, Shanghai Metro | 6 | 8.3 | 6-car A-type | 30 December 2012 | ||
Total | 67 | 137.1 | ||||
Shanghai No.3 Metro |
Line 3, Shanghai Metro | 29 | 40.3 | 6-car A-type | 26 December 2000 | |
Line 4, Shanghai Metro | 26 | 33.7 | 8-car A-type | 31 December 2005 | ||
Line 7, Shanghai Metro | 32 | 44.2 | 6-car A-type | 5 December 2009 | ||
Line 16, Shanghai Metro | 11 | 51.8 | 3-car A-type | 29 December 2013 | ||
Total | 101 | 177.0 | ||||
Shanghai No.4 Metro |
Line 6, Shanghai Metro | 28 | 32.3 | 4-car C-type | 29 December 2007 | |
Line 8, Shanghai Metro | 30 | 37.4 | 6-car/7-car C-type | 29 December 2007 | ||
Line 12, Shanghai Metro | 16 | 19 | 6-car A-type | 29 December 2013 | ||
Total | 74 | 85.70 | ||||
Shanghai Maglev Transportation |
Shanghai Maglev Train | 2 | 30.5 | 5-car (Transrapid SMT) | 1 January 2004 | |
Total | 2 | 30.5 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 12, Shanghai Metro Phase II Western Section | 19 | 22.8 | 2014 |
Line 13, Shanghai Metro | 12 | 7.4 | 2014 |
Line 16, Shanghai Metro Phase II | 2 | 8 | 2014 |
Shenyang
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Shenyang Metro 沈阳地铁 |
Locale | Shenyang |
1 east extension |
|||
Began operation | 27 September 2010 | |||||
Lines in operation | 2 | |||||
№ of stations | 43 | |||||
Network length | 55 km (34 mi) | |||||
Ridership | ||||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Shenyang Metro |
Line 1, Shenyang Metro | 22 | 27.80 | 6-car B-type | 23 September 2009 | |
Line 2, Shenyang Metro | 22 | 27.36 | 6-car B-type | 9 January 2012 | ||
Total | 44 | 55.16 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Shenyang Metro Eastern Extension | 4 | 7.7 | |
Line 2, Shenyang Metro Southern Extension | 7 | 16.5 |
Shenzhen
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Shenzhen Metro 深圳地铁 |
Locale | Shenzhen | [29] [30] [31] | |||
Began operation | 28 December 2004 | |||||
Lines in operation | 5 | |||||
№ of stations | 137 (List) | |||||
Network length | 178 km (111 mi) | |||||
Ridership | 914 million (2013 annual) 2.89 million (April 30 - May 1, 2012 record) | |||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Shenzhen Metro |
Line 1 (Luobao Line) | 30 | 41.04 | 6-car A-type | 28 December 2004 | |
Line 2 (Shekou Line) | 29 | 35.78 | 6-car A-type | 8 December 2010 | ||
Line 5 (Huanzhong Line) | 27 | 40.00 | 6-car A-type | 22 June 2011 | ||
Total | 86 | 116.82 | ||||
Shenzhen Metro No.3 Line |
Line 3 (Longgang Line) | 30 | 41.66 | 6-car B-type | 28 December 2010 | |
Total | 30 | 41.66 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 11, Shenzhen Metro | 12 | 49.7 | 2016 |
Line 7, Shenzhen Metro | 23 | 28.9 | 2016 |
Line 6, Shenzhen Metro | 19 | 37.2 | 2017 |
Line 9, Shenzhen Metro | 17 | 17.8 | 2017 |
Line 8, Shenzhen Metro | 13 | 25.9 | 2018 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 (Luobao Line) | Luohu | Window of the World | 28 December 2004 | |
Window of the World | Shenzhen University | 28 September 2009 | ||
Shenzhen University | Airport East | 15 June 2011 | ||
Line 2 (Shekou Line) | Chiwan | Window of the World | 28 December 2010 | |
Window of the World | Xinxiu | 28 June 2011 | ||
Line 3 (Longgang Line) | Caopu | Shuanglong | 28 December 2010 | |
Yitian | Caopu | 28 June 2011 | ||
Line 4 (Longhua Line) | Fumin | Children's Palace | 28 December 2004 | |
Futian Checkpoint | Fumin | 28 June 2007 | ||
Children's Palace | Qinghu | 16 June 2011 | ||
Line 5 (Huanzhong Line) | Qianhaiwan | Huangbeiling | 22 June 2011 |
Suzhou
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Suzhou Rail Transit (SRT) 苏州轨道交通 |
Locale | Suzhou | ||||
Began operation | 28 April 2012 | |||||
Lines in operation | 2 | |||||
№ of stations | 46 (List) | |||||
Network length | 52.296 km (32 mi) | |||||
Ridership | 550,000 (Daily Record) 40.334 million (2012 annual) | |||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Suzhou Rail Transit |
Line 1, Suzhou Rail Transit | 24 | 25.739 | 4-car B-type | 28 April 2012 | |
Line 2, Suzhou Rail Transit | 22 | 26.557 | 5-car B-type | 28 December 2013 | ||
Total | 46 | 52.296 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 4, Suzhou Rail Transit | 30 | 41.1 | 2016 |
Line 7, Suzhou Rail Transit | 7 | 11.1 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Mudu | Zhongnan Jie | 28 April 2012 | |
Line 2 | Suzhou North Railway Station | Baodaiqiao South | 28 December 2013 |
Tianjin
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Tianjin Metro 天津地铁 |
Locale | Tianjin |
5 |
[Note 7] | ||
Began operation | 30 September 2003 (28 December 1984 old system) | |||||
Lines in operation | 4 | |||||
№ of stations | 94 | |||||
Network length | 132.7 km (82 mi) | |||||
Ridership | 64.3 million (2010 annual) | |||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Tianjin Metro |
Line 1, Tianjin Metro | 22 | 26.188 | 4-car/6-car B-type | 28 December 1984 | |
Line 2, Tianjin Metro | 19 | 22.657 | 6-car B-type | 1 July 2012 | ||
Line 3, Tianjin Metro | 26 | 30.755 | 6-car B-type | 1 October 2012 | ||
Total | 67 | 79.600 | ||||
Binhai Mass Transit |
Line 9, Tianjin Metro | 19 | 52.759 | 4-car B-type | 28 March 2004 | |
Total | 19 | 52.759 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 2, Tianjin Metro Airport Extension | 1 | 4 | 2014 |
Line 5, Tianjin Metro | 24 | 35.5 | 2017 |
Line 6, Tianjin Metro | 38 | 50.1 | 2017 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Xiaobailou | Xizhan | 28 December 1984 | |
Shuanglin | Xiaobailou | 12 June 2006 | ||
Xizhan | Liuyuan | 12 June 2006 | ||
Line 2 | Caozhuang | Dongnanjiao | 1 July 2012 | |
Tianjinzhan | Konggangjingjiqu | 1 July 2012 | ||
Dongnanjiao | Tianjinzhan | 28 August 2013 | ||
Line 3 | Gaoxinqu | Xiaodian | 1 October 2012 | |
Nanzhan | Gaoxinqu | 28 December 2013 | ||
Line 9 | Zhongshanmen | Donghai Road | 28 March 2004 | |
Shiyijing Road | Zhongshanmen | 1 May 2011 | ||
Tianjin Railway Station | Shiyijing Road | 15 October 2012 |
Wuhan
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Wuhan Metro 武汉地铁(武汉轨道交通) |
Locale | Wuhan | [32] [33] | |||
Began operation | 28 July 2004 | |||||
Lines in operation | 3 | |||||
№ of stations | 62 | |||||
Network length | 96.7 km (60 mi) | |||||
Ridership | 73 million (2011 annual, Line 1 only) 1,272,300 (Feb 2013 Peak)[34] | |||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Wuhan Metro |
Line 1, Wuhan Metro | 27 | 34.57 | 4-car B-type | 28 July 2004 | |
Line 2, Wuhan Metro | 21 | 27.985 | 6-car B-type | 28 December 2012 | ||
Line 4, Wuhan Metro | 15 | 16.488 | 6-car B-type | 28 December 2013 | ||
Total | 62 | 73.338 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 4, Wuhan Metro Phase II | 13 | 16.85 | 2014 |
Line 3, Wuhan Metro | 23 | 33.2 | 2015 |
Line 6, Wuhan Metro | 27 | 36.1 | 2016 |
Line 7, Wuhan Metro Phase I | 18 | 29.8 | 2017 |
Line 8, Wuhan Metro Phase I | 13 | 16.55 | 2017 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Huangpu Road | Zongguan | 28 July 2004 | |
Dijiao | Huangpu Road | 29 July 2010 | ||
Zongguan | Dongwu Boulevard | 29 July 2010 | ||
Hankou North Station | Dijiao | 28 May 2014 | ||
Line 2 | Jinyintan | Optics Valley Square | 28 December 2012 | |
Line 4 | Wuchang Railway Station | Wuhan Railway Station | 28 December 2013 |
Wuxi
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Wuxi Metro 无锡地铁(无锡轨道交通) |
Locale | Wuxi | ||||
Began operation | 1 July 2014 | |||||
Lines in operation | 1 | |||||
№ of stations | 24 | |||||
Network length | 29.42 km (18 mi) | |||||
Ridership | ||||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Wuxi Metro |
Line 1, Wuxi Metro | 24 | 29.42 | 6-car B-type | 1 July 2014 | |
Total | 24 | 29.42 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 2, Wuxi Metro | 22 | 26.74 | December 2014 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Yanqiao | Changguangxi | 1 July 2014 |
Xi'an
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Xi'an Metro 西安地铁 |
Locale | Xi'an |
3 4 |
[35] | ||
Began operation | 16 September 2011 | |||||
Lines in operation | 2 | |||||
№ of stations | 40 | |||||
Network length | 52 km (32 mi) | |||||
Ridership | 150,000 (daily record) | |||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Xi'an Metro |
Line 1, Xi'an Metro | 19 | 25.4 | 6-car B-type | 15 September 2013 | |
Line 2, Xi'an Metro | 21 | 26.5 | 6-car B-type | 16 September 2011 | ||
Total | 40 | 51.9 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 3, Xi'an Metro | 26 | 39.1 | December 2015 |
Line 4, Xi'an Metro Trial section | 5 | 5.1 | 2017 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Houweizhai | Fangzhicheng | 15 September 2013 | |
Line 2 | Bei Kezhan | Huizhan Zhongxin | 16 September 2011 | |
Huizhan Zhongxin | Weiqu South | 16 June 2014 |
Zhengzhou
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Zhengzhou Metro 郑州地铁(郑州轨道交通) |
Locale | Zhengzhou |
2 |
|||
Began operation | 26 December 2013 | |||||
Lines in operation | 1 | |||||
№ of stations | 20 | |||||
Network length | 26 km (16 mi) | |||||
Ridership | ||||||
Operator | Livery | Line | Stations | Length (km) | Configuration | Opened |
---|---|---|---|---|---|---|
Zhengzhou Metro |
Line 1, Zhengzhou Metro | 20 | 26.34 | 6-car B-type | 26 December 2013 | |
Total | 20 | 26.34 |
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 2, Zhengzhou Metro | 15 | 27.7 | 2015 |
Line | Extension Section | Opened | ||
---|---|---|---|---|
Line 1 | Xiliuhu | Zhengzhou Sports Center | 26 December 2013 |
Under construction
2015
- Dongguan Rail Transit (东莞轨道交通) operational by April 2015
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 2, Dongguan Rail Transit | 15 | 37.743 | April 2015 |
- Fuzhou Metro (福州轨道交通) operational by June 2015
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Fuzhou Metro | 21 | 24.89 | 2015 |
Line 2, Fuzhou Metro | 16 | 26.25 |
- Qingdao Metro (青岛地铁) operational by 13 August 2015
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 3, Qingdao Metro | 22 | 25.1 | 13 August 2015 |
Line 2, Qingdao Metro | 22 | 25.2 | 3 January 2016 |
Line R1, Qingdao Metro | 22 | 59.2 | 13 August 2015 |
- Nanchang Metro (南昌地铁) () operational by 2015
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Nanchang Metro | 24 | 28.7 | 2015 |
Line 2, Nanchang Metro | 21 | 23.3 | December 2016 |
2016
- Nanning Rail Transit (南宁轨道交通) operational by 2016
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Nanning Rail Transit | 25 | 32.1 | 2016 |
Line 2, Nanning Rail Transit | 26 | 37.3 | 2016 |
- Macau Light Rail Transit (澳門輕軌系統 / 澳门轻轨系统) operational by 2016
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Macau—Taipa Line | 21 | 21 | 2016 |
- Hefei Metro (合肥地铁) operational by 2016
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Hefei Metro | 26 | 29.06 | 31 December 2016 |
Line 2, Hefei Metro | 24 | 30.06 | June 2017 |
- Xuzhou Rail Transit (徐州轨道交通) operational by 2016
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Xuzhou Rail Transit | 16 | 24.0 | 2016 |
- Changchun Rail Transit - metro lines (长春轨道交通–地铁线) () operational by 2016
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Changchun Rail Transit | 15 | 18.5 | 2016 |
Line 2, Changchun Rail Transit | 19 | 20.5 | 2016 |
- Lanzhou Metro (兰州轨道交通) operational by 2016
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Lanzhou Metro Phase I | 20 | 26.798 | December 2016[36] |
2017
- Xiamen Metro (厦门轨道交通) operational by 2017
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Xiamen Metro | 24 | 31.5 | 2017 |
- Guiyang Urban Rail Transit (贵阳轨道交通) () operational by 2017
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line , Guiyang Urban Rail Transit | 22 | 39.1 | 2017 |
- Shijiazhuang Metro (石家庄轨道交通) () operational by 2017
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1, Shijiazhuang Metro | 20 | 23.9 | 2017 |
2018
- Jinan Metro (济南轨道交通) operational by end of 2018
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line R1, Jinan Metro | 9 | 26.4 | 2018 |
- Ürümqi Rail Transit (乌鲁木齐轨道交通) operational by end of 2018
<div class="NavContent" style-"text-align: left;">
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line 1 | 21 | 26.5 | 2018 |
Approved awaiting for construction
- Changzhou Metro (常州轨道交通) operational by 2018 — Line 2 (19.86 km, 13 stations)
- Jiujiang Metro
- Taiyuan Metro (太原轨道交通) operational by 2018 — Line 2 (25.1 km, 21 stations)
- Xining & Haidong Metro (西宁海东轨道交通) operational before 2020 — Trial Line 1
Under planning
- Ganzhou Metro
- Luoyang Metro
- Mudanjiang Metro
- Xiangyang Metro
- Yichang Metro
- Zhongshan Metro
Proposed
- Baotou Metro
- Datong Metro
- Haikou Metro
- Hohhot Metro
- Huizhou Metro
- Huzhou Metro
- Jiaxing Metro
- Jinhua Metro
- Kunshan Metro
- Quanzhou Metro
- Weifang Metro
- Yinchuan Metro
- Zhangjiagang Metro
- Zhuhai Metro
- Zibo Metro
Notes
- ↑ The first of the Beijing Subway was completed in 1969 but did not open for trial operation until 1971 and it was restricted to riders with credential letters. The subway was fully opened to the public without credential letters in 1981.
- ↑ 2.0 2.1 The Guangzhou Metro Annual ridership data is combined with Guangfo Metro.
- ↑ The Guangfo Metro sometimes counts FMetro line 1.
- ↑ The Hong Kong Mass Transit Railway (MTR) consists of the main MTR subway system, which opened in 1979, and the Kowloon-Canton Railway (KCR), which opened in 1910 and was electrified in 1983. The two systems merged in 2007. Data no counts light rail lines. The ridership figures for the MTR does not include cross-border train service riders and includes only ridership on the MTR lines, airport express and light rail and certain MTR bus lines. The MTR compiles light rail and MTR bus line riders in one category so it is not possible to separate MTR bus riders from light rail riders. See
- ↑ The "S lines" are counted under the Suburban rapid rail section.
- ↑ The Shanghai Metro is the longest network in the world. See David Barboza (29 April 2010). "Expo Offers Shanghai a New Turn in the Spotlight". The New York Times. Retrieved 29 April 2010.
- ↑ The Tianjin Metro closed down for upgrades in 2001 and reopened in 2006.
Suburban rapid rail transit systems
Currently operational
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
BCR Beijing City Railway / Beijing Suburban Railway 北京市郊铁路 |
Locale | Beijing | ||||
Began operation | 2008 | |||||
Lines in operation | 1 | |||||
№ of stations | 6 | |||||
Network length | 77 | |||||
Ridership | 57,800 (daily record) | |||||
Chengdu City Railway 成都市域铁路 |
Locale | Chengdu |
Chengdu–Pujiang |
|||
Began operation | 2008 | |||||
Lines in operation | 2 | |||||
№ of stations | 9 | |||||
Network length | 73 | |||||
Ridership | ||||||
Nanjing Metro (S lines) 南京地铁(S线) |
Locale | Nanjing |
S1 |
S3 |
||
Began operation | 2014 | |||||
Lines in operation | 1 | |||||
№ of stations | 8 | |||||
Network length | 35.8 km (22 mi) (S1 only) | |||||
Ridership | ||||||
Pearl River Delta Rapid Transit (PRDRT) 珠三角城际轨道交通 |
Locale | Guangzhou, Foshan, Zhongshan, Jiangmen, Zhuhai, Macau |
Guangzhou–Foshan Ring Guangzhou–Dongguan–Shenzhen Dongguan–Huizhou Guangzhou–Foshan–Zhaoqing Guangzhou–Qingyuan Huizhou–Heyuan Zhaoqing–Gaoming–Nansha |
— | ||
Began operation | 2011 | |||||
Lines in operation | 1 | |||||
№ of stations | 20 | |||||
Network length | 177.53 | |||||
Ridership | ||||||
Jinshan Railway Shanghai Metro Line 22 金山铁路 / 二十二号线 |
Locale | Shanghai | ||||
Began operation | 2012 | |||||
Lines in operation | 1 | |||||
№ of stations | 2 | |||||
Network length | 56 | |||||
Ridership | ||||||
Wuhan Metropolitan Area Intercity Railway 武汉城市圈城际铁路 |
Locale | Wuhan, Xianning, Huangshi, Huanggang |
Wuhan–Xianning Wuhan–Huangshi Wuhan–Huanggang |
Wuhan–Xiaogan |
||
Began operation | 2013 | |||||
Lines in operation | 3 | |||||
№ of stations | 37 | |||||
Network length | 222 | |||||
Ridership | ||||||
Under construction
- Central Plains City Railway
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Zhengzhou-Kaifeng Intercity Railway | |||
Zhengzhou-Jiaozuo Intercity Railway | |||
Zhengzhou-Xuchang Intercity Railway | |||
Zhengzhou-Yuntaishan Intercity Railway |
- Changsha City Railway
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Changsha–Zhuzhou–Xiangtan Intercity Railway | 21 | 97.5 |
- Ordos Metro (鄂尔多斯轨道交通)
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Dongsheng—Airport Line | 6 | 54.44 | before 2020 |
- Wenzhou Metro (温州轨道交通) operational by 2016
Line/Extension | Stations | Length (km) | Schedule opening |
---|---|---|---|
Line S1, Wenzhou Metro Phase I | 15 | 52.22 | 2016 |
Under planning
- Jiangsu-Yangtze River Delta Rapid Transit
- Central Zhejiang Metropolitan Railway
- Shandong Peninsula Rapid Transit
Light rail/Tram systems
Currently operational
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Dalian Trams 大连有轨电车 |
Locale | Dalian |
|
— | ||
Began operation | 1909 | |||||
Lines in operation | 2 | |||||
№ of stations | ||||||
Network length | 23.4 | |||||
Ridership | ||||||
Hong Kong Light Rail 香港輕鐵 / 香港轻铁 |
Locale | Hong Kong |
|
— | ||
Began operation | 1988 | |||||
Lines in operation | 12 | |||||
№ of stations | 68 | |||||
Network length | 36.2 | |||||
Ridership |
430,000[37] | |||||
Hong Kong Tramways 香港電車 / 香港电车 |
Locale | Hong Kong |
|
— | ||
Began operation | 1904 | |||||
Lines in operation | 7 | |||||
№ of stations | ||||||
Network length | 30 | |||||
Ridership | ||||||
Changchun Rail Transit 长春轨道交通(长春轻轨) Changchun Trams 长春有轨电车 |
Locale | Changchun |
|
1 |
||
Began operation | 2002 | |||||
Lines in operation | 2 | |||||
№ of stations | 49 | |||||
Network length | 51 | |||||
Ridership | 0.27 million (daily record) 33.34 million (2010 annual) | |||||
TEDA Modern Guided Rail Tram 天津开发区导轨电车 |
Locale | Tianjin | — | |||
Began operation | 2007 | |||||
Lines in operation | 1 | |||||
№ of stations | 14 | |||||
Network length | 7.86 | |||||
Ridership | ||||||
Zhangjiang Tram 张江有轨电车 |
Locale | Shanghai | — | |||
Began operation | 2010 | |||||
Lines in operation | 1 | |||||
№ of stations | 15 | |||||
Network length | 10 | |||||
Ridership | ||||||
Shenyang Trams 沈阳有轨电车 |
Locale | Shenyang |
|
|
— | |
Began operation | 2013 | |||||
Lines in operation | 4 | |||||
№ of stations | 57 | |||||
Network length | 54.8 | |||||
Ridership | ||||||
Under construction
- Nanjing Trams (南京有轨电车) operational by August 2014[38]
- Huai'an Trams (淮安有轨电车) operational by September 2014
- Suzhou Trams (苏州有轨电车) operational by December 2014[39]
- Guangzhou Trams (广州有轨电车) operational by December 2014
- Shenzhen Trams (深圳有轨电车) operational by December 2014
- Beijing Trams (北京有轨电车) operational by 2015
- Wuhan Trams (武汉有轨电车) operational by 2015
- Chengdu Trams (成都有轨电车) operational by June 2015
- Haikou Trams (海口有轨电车) operational by December 2015
- Foshan Trams (佛山有轨电车) operational by 2016[40]
- Zhuhai Trams (珠海有轨电车) operational by 2016[41]
Planned
- Chongqing Trams (重庆有轨电车)
- Zhuzhou Trams (株洲有轨电车)
Bus systems (BRT)
More than 30 bus rapid transit projects are being implemented or studied in China in some big cities. BRT systems with light blue background are not yet operational but under construction or proposed.
System | Chinese name |
Abbrev. | City | Began oper. | Lines in oper. [Note 1] |
Number of stations [Note 2] |
Network length (km) [Note 3] |
Notes |
---|---|---|---|---|---|---|---|---|
Hangzhou BRT | 杭州BRT | HZBRT | Hangzhou | 2006 | 2 | 50 | 55.4 | |
Beijing BRT | 北京BRT | BJBRT | Beijing | 2004 | 4 | 60 | 54 | [Note 4] |
Kunming BRT | 昆明BRT | KMBRT | Kunming | 1999 | 5 | 63 | 46 | |
Changzhou BRT | 常州BRT | CZBRT | Changzhou | 2008 | 2 | 51 | 44 | |
Xiamen BRT | 厦门BRT | XMBRT | Xiamen | 2008 | 3 | 31 | 40 | [Note 5] |
Jinan BRT | 济南BRT | JNBRT | Jinan | 2008 | 2 | 46 | 34 | |
Zaozhuang BRT | 枣庄BRT | ZZBRT | Zaozhuang | 2010 | 2 | 49 | 62 | |
Zhengzhou BRT | 郑州BRT | ZZBRT | Zhengzhou | 2009 | 8 | 38 | 30 | |
Guangzhou BRT | 广州BRT | GBRT | Guangzhou | 2010 | 1 | 26 | 22 | |
Suzhou BRT | 苏州BRT | SZBRT | Suzhou | 2008 | 5 | 106 | 95 | |
Dalian BRT | 大连BRT | DLBRT | Dalian | 2008 | 1 | 13 | 13 | |
Chongqing BRT | 重庆BRT | CQBRT | Chongqing | 2008 | 1 | 9 | 11 | |
Hefei BRT | 合肥BRT | HFBRT | Hefei | 2010 | 2 | 9 | 7 | |
Yancheng BRT | 盐城BRT | YCBRT | Yancheng | 2010 | 2 | 24 | 16 | |
Ürümqi BRT | 乌鲁木齐BRT | UMBRT | Ürümqi | 2011 | 4 | 66 | 42.2 | |
Changde BRT | 常德BRT | CDBRT | Changde | 2012 | 1 | 25 | 20.9 | |
Lianyungang BRT | 连云港BRT | LYGBRT | Lianyungang | 2012 | 1 | 29 | 34 | |
Lanzhou BRT | 兰州BRT | LZBRT | Lanzhou | 2012 | 1 | 15 | 9.1 | |
Yinchuan BRT | 银川BRT | YCBRT | Yinchuan | 2012 | 1 | 22 | 17 | |
Chengdu BRT | 成都BRT | CDBRT | Chengdu | 2013 | 1 | 28 | 28.8 | |
Nanchang BRT | 南昌BRT | NCBRT | Nanchang | 20XX | ||||
Shanghai BRT | 上海BRT | SHBRT | Shanghai | 20XX | ||||
Shenzhen BRT | 深圳BRT | SZBRT | Shenzhen | 20XX | ||||
Wuxi BRT | 无锡BRT | WXBRT | Wuxi | 20XX | ||||
Xi'an BRT | 西安BRT | XABRT | Xi'an | 20XX | ||||
Shenyang BRT | 沈阳BRT | SYBRT | Shenyang | 20XX | ||||
Wuhan BRT | 武汉BRT | WHBRT | Wuhan | 20XX | ||||
Shijiazhuang BRT | 石家庄BRT | SJZBRT | Shijiazhuang | 20XX | ||||
Harbin BRT | 哈尔滨BRT | HBBRT | Harbin | 20XX |
Notes
- ↑ Lines in operation counts the number of main lines only.
- ↑ Stations connected by transfers are counted as one station, unless otherwise noted.
- ↑ Network length refers to track length and lines that share track are counted only once.
- ↑ running on the Nan Zhongzhouxian (South Central Axis Line), The line terminates at Qianmen and Demaozhuang
- ↑ There are significant sections that are on dedicated elevated roads. BRT one 33.4 km, BRT 1 Interchange 18.7 km, BRT 2 15.3 km.
See also
- Rapid transit in Taiwan
- List of tram and light-rail transit systems
- List of town tramway systems in Asia
- List of rapid transit systems
- List of trolleybus systems
References
- ↑ "中国城市轨道交通 China Urban Mass Transit". Retrieved February 18, 2013.
- ↑ "Statistics Brief World Metro Figures" (PDF). Union Internationale des Transports Publics (UITP) (International Association of Public Transport). October 2014. Retrieved 2014-12-13.
- ↑ 3.0 3.1 3.2 "Chinese metro boom shows no sign of abating". International Rail Journal. November 19, 2014. Retrieved 23 Nov 2014.
- ↑ 4.0 4.1 https://www.youtube.com/watch?v=dNCaK4d0GA0
- ↑ "Shanghai now the world's longest metro". Railway Gazette. 4 May 2010. Retrieved 9 April 2014.
- ↑ (Chinese) "谁的地铁,谁做主?" 财经文摘 Mar. 23, 2010
- ↑ Toh Han Shih (12 February 2013). "Beijing and other key cities plan for 10-fold expansion of metro railways". South China Morning Post. Retrieved 10 April 2013.
- ↑ "China to restore confidence in high-speed trains". Xinhua. 9 May 2012. Retrieved 21 May 2012.
- ↑ "北京公交出行再增两个百分点". Qianlong. 2012-02-10. Retrieved 2012-01-29.
- ↑ "Official Ridership". Beijing Subway. Retrieved 2013-03-10.
- ↑ 杜燕 (2014-01-02). "北京地铁一年运客超32亿人次 同比增长近30%". 中国新闻网. Retrieved 2014-01-02.
- ↑ 12.0 12.1 "Changsha metro opens". railwaygazette.com. April 29, 2014. Retrieved April 30, 2014.
- ↑ 13.0 13.1 "Metro projects underway in Changsha, Xi'an, Wuhan and Xiamen". railwaygazette.com. July 13, 2011. Retrieved April 30, 2014.
- ↑ "2010重庆市主城区交通发展年度报告解读". Cq.cqnews.net. Retrieved 2012-01-26.
- ↑ 节后3条轨道运力增幅超10% 观音桥站或6月扩建
- ↑ "重庆市主城区交通发展年度报告2012". Cq.cqnews.net. Retrieved 2012-01-26.
- ↑ "[议案之一]轨道交通不载客试运行三个月". 大连天健网. 2012-01-08. Retrieved 2012-01-12.
- ↑ 2011广州地铁运客16.4亿人次 行车里程达19308万车公里 [Guangzhou Metro 2011 ridership tops 1.64 billion] (in Chinese). Guangzhou Metro Daily. 2012-01-18. Retrieved 2012-01-24.
- ↑ 第二届地铁春联今起征集 [Second Metro Spring Duilian Contest starts today] (in Chinese). Guangzhou Metro Daily. 2011-01-10. Retrieved 2010-01-23.
- ↑ "交通六件事 事事有着落" (in Chinese). Guangzhou Daily. 2013. Retrieved 2014-01-20.
- ↑ "Ditiezu Archive » 2011年南京地铁客流量34370.10万人次".
- ↑ "南京地铁一号线3月9日起调整运行图". jspeople. 2012-03-08. Retrieved 2012-08-24.
- ↑ "2012年清明小长假 南京地铁安全送客531万人次". longhoo. 2012-03-08. Retrieved 2012-08-24.
- ↑ "南京铁运营十年日均客流占全市公交出行量三分之一". Xici. 2013-12-31. Retrieved 2013-01-20.
- ↑ excluding Maglev and Line 22
- ↑ "2011年上海市国民经济和社会发展统计公报". Shanghai Bureau of Statistics and Shanghai Survey Corps, National Bureau of Statistics of China. 2012-02-23. Retrieved 2012-02-24.
- ↑ "2012年上海地铁网络运营大事件盘点". MTR8 news. Retrieved 2013-02-18.
- ↑ 回顾上海地铁2013 (in Chinese). Eastday. 2014-01-15. Retrieved 2014-01-15.
- ↑ (Chinese) "深圳市统计局2011年度12月份 深圳统计月报 运输邮电,地铁客流量1-12月累计. Retrieved on 2012-03-17.
- ↑ (Chinese) "深圳地铁客流量 去年猛增近七成. Retrieved on 2013-01-10.
- ↑ "340.96万!2013跨年日地铁创下客流新高". 深圳都市报. 2014-01-02.
- ↑ "轻轨高峰发车间隔缩短半分钟". Cjmp.cnhan.com. 2011-10-26. Retrieved 2012-01-26.
- ↑
- ↑ "武汉轨道交通最高客流". Retrieved 2013-05-01.
- ↑ 西安地铁日均客流量15万人次的情况也好于预期
- ↑ "Lanzhou Metro Construction Begins". Retrieved April 7, 2014.
- ↑ http://www.gov.hk/en/about/abouthk/factsheets/docs/transport.pdf
- ↑ http://www.railwaygazette.com/news/urban/single-view/view/nanjing-to-get-catenary-free-trams.html
- ↑ 有轨电车1号线高新区开建 预计2015年投运
- ↑ "佛山南海有轨电车 试验段建设启动". 南方日报. Retrieved 12 17, 2012. Check date values in:
|accessdate=
(help) - ↑ 珠海将构建现代有轨电车系统
External links