USS Buttress (ACM-4)

Career
Name: USS Buttress
Builder: Albina Engine & Machine Works
Laid down: 11 May 1943
Launched: 26 August 1943
Commissioned: 13 March 1944
Decommissioned: 24 February 1947
Reclassified: ACM-4, 15 June 1944
Struck: 5 March 1947
Fate: Sold, 30 October 1947
General characteristics
Displacement:903 long tons (917 t)
Length:184 ft 6 in (56.24 m)
Beam:33 ft 1 in (10.08 m)
Draft:9 ft 5 in (2.87 m)
Speed:15.4 knots (28.5 km/h; 17.7 mph)
Complement:99
Armament:• 1 × 3 in (76 mm) gun
• 6 × 40 mm guns

USS Buttress (PCE-878/ACM-4) was an Auxiliary Minelayer (ACM) in the United States Navy during World War II. This ship and USS Monadnock (ACM-10) were the only ACMs not previously U.S. Army mineplanters.[1]

Buttress was laid down as Patrol Craft Escort USS PCE-878 on 11 May 1943 at Portland, Oregon, by the Albina Engine & Machine Works; launched on 26 August 1943; and commissioned on 13 March 1944.

Service history

World War II Pacific Theatre operations

Following commissioning, she entered the Mare Island Navy Yard for conversion to a drill mine laying and recovery ship. On 15 June 1944, PCE-878 was renamed Buttress and redesignated ACM-4. The ship was assigned to Service Squadron (ServRon) 6 and saw duty at advanced bases in the central and western Pacific Ocean through the end of the war. She returned to the West Coast at San Francisco late in December 1946.

Decommissioning

From there, Buttress moved north to Bremerton, Washington, where she was decommissioned on 24 February 1947. Her name was struck from the Navy list on 5 March 1947, and she was sold to J. W. Rumsey on 30 October 1947.

References

  1. http://www.navsource.org/archives/11/01idx.htm | NavSource: Auxiliary Minelayer (ACM / MMA) Index

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.

See also