Trowbridge railway station
Trowbridge | |
---|---|
Location | |
Place | Trowbridge |
Local authority | Wiltshire |
Coordinates | 51°19′12″N 2°12′51″W / 51.3200°N 2.2143°WCoordinates: 51°19′12″N 2°12′51″W / 51.3200°N 2.2143°W |
Grid reference | ST851578 |
Operations | |
Station code | TRO |
Managed by | First Great Western |
Number of platforms | 2 |
DfT category | D |
Live arrivals/departures, station information and onward connections from National Rail Enquiries | |
Annual rail passenger usage* | |
2002/03 | 0.462 million |
2004/05 | 0.514 million |
2005/06 | 0.543 million |
2006/07 | 0.584 million |
2007/08 | 0.571 million |
2008/09 | 0.612 million |
2009/10 | 0.652 million |
2010/11 | 0.740 million |
2011/12 | 0.779 million |
2012/13 | 0.790 million |
2013/14 | 0.850 million |
History | |
Original company | Wilts, Somerset and Weymouth Railway |
Pre-grouping | Great Western Railway |
Post-grouping | Great Western Railway |
1848 | Opened |
National Rail – UK railway stations | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Trowbridge from Office of Rail Regulation statistics. Methodology may vary year on year. | |
UK Railways portal |
Trowbridge railway station is a railway station on the Wessex Main Line serving the town of Trowbridge in Wiltshire, England. The station is 24 miles (39 km) south east of Bristol Temple Meads and is managed by First Great Western.
Originally opened by the Wilts, Somerset and Weymouth Railway in 1848 as part of their Thingley Junction to Westbury line, it gained a link to Bath and Bristol nine years later thanks to the Great Western Railway. This is now the main line, as the original route to Chippenham has been singled and reduced to secondary status.
Description
The small station building is located on the northbound platform (platform 1). This platform is for trains to Bath. Bristol and Cardiff. Platform 2, on the southbound line is for trains to Westbury, London and the South Coast.
The station building contains a ticket office. Inside, there are benches, vending machines and one of the two electronic information signs. There are toilet facilities. Metro newspapers are available and other outdoor seating areas. On Platform 1 are covered bike stands and benches. Platform 2 has an electronic display sign, bike racks, train timetables and a small shelter with benches.
Services
Regular service (at present half-hourly each way Mon-Sat, hourly on Sundays) is provided by First Great Western to Bath Spa, Bristol Temple Meads and either Gloucester or Cardiff Central northbound and Weymouth or Southampton and Portsmouth in the south.[1]
The original WS&WR line diverges to the north of Trowbridge, formerly carried a limited passenger service (two per day each way Mon-Sat, one each way on Sundays) to/from Swindon via Melksham and Chippenham. This was improved to a two-hourly service (8 trains each way total on weekdays, 5 each way on Sundays)) at the December 2013 timetable change. Two services continue beyond Swindon through to Cheltenham Spa on weekdays only.
The station is served by a limited service between Bristol Temple Meads and London Waterloo (3 per day Mondays to Saturdays, 2 on Sundays) by South West Trains.[2]
References
Wikimedia Commons has media related to Trowbridge railway station. |
|
|
|